Appendix_X_Hanover_Substation.docx

DOCX document 6 MB Posted

Attached to
Electric Substation Equipment Painting
Solicitation number
IFB196740
Issued by
Santa Clara County, California

About this file

Appendix X is an equipment list for the Hanover Substation, one of seven electric substations operated by the City of Palo Alto Utilities (CPAU) included in a comprehensive surface preparation and protective coating services project. The Hanover Substation equipment inventory consists of six items requiring painting services: a transformer (HULMAN, 159"W x 161"D x 161"H), switchgear (Allis Chalmers, 400"W x 180"W x 120"H), capacitor house (Butler, 480"W x 144"D x 120"H), trificator (Ohio Brass, 48"H x 12" round with previously painted surfaces only), and two padmount switches (Elliott). The broader solicitation encompasses cleaning, surface preparation, corrosion treatment, priming, and application of high-performance utility-grade protective coatings across equipment in all seven substations. A non-mandatory pre-bid meeting and site walk is scheduled for April 15, 2026, at 9:00 a.m. at the Colorado Substation; written questions must be submitted by April 17, 2026, at 1:00 p.m.; and electronic bids are due April 24, 2026, at 3:00 p.m. through the City's OpenGov procurement portal. Work is anticipated to commence July 1, 2026, with a completion deadline of 1,095 working days from the Notice to Proceed.

The Year 1 engineering estimate allocates $58,000 for Hanover Substation painting services as part of a total Year 1 project cost of approximately $940,500 (including $100,000 mobilization), with subsequent years showing reduced annual expenditures ranging from $274,000 to $327,000 over a four-year project timeline. All materials and coating systems must meet utility-grade performance standards including ANSI No. 70 light gray finish paint and Fire Engine Red bushing caps using silicone alkyd, with compliance required to Steel Structure Painting Council (SSPC) and Occupational Safety and Health Administration (OSHA) standards and a minimum one-year warranty. Contractors must provide a bid bond of no less than 10 percent of the aggregate bid amount for bids exceeding $25,000, and selected contractors must provide performance and payment surety bonds each in the amount of 100 percent of the contract sum within 10 business days of Notice of Award. Liquidated damages are assessed at $500 per day for failure to achieve final completion within contract time, and the City will retain 10 percent of undisputed amounts on each progress payment. All selected contractors must comply with California prevailing wage requirements under Labor Code Sections 1720 et seq. and maintain registration with the California Department of Industrial Relations (DIR). The City reserves the right to award the contract to a single contractor or multiple contractors, with no specific set-asides or incumbent vendors identified.

View the file

Other files

File Type Posted
Electric_Substation_Equipment_Painting_(Addendum_#2_Revision).pdf PDF
Electric_Substation_Equipment_Painting_(Addendum_#1_Revision).pdf PDF
Appendix_VII_Maybell.docx DOCX document
Appendix_VIII_Quarry_Substation.docx DOCX document
Appendix_X_Hanover_Substation.docx DOCX document
Appendix_XI_Hansen_Way.docx DOCX document
Appendix_IX_ParkBlvd.docx DOCX document
Appendix_V_Colorado_Substation.docx DOCX document
Bid_Bond_Form.docx DOCX document
Appendix_VI_Adobe_Creek.docx DOCX document
Performance_Bond.docx DOCX document
Payment_Bond.docx DOCX document
REVISED_Equipment_list_2025_(1).xlsx XLSX spreadsheet
Substation_Painting_Specs.docx DOCX document
Equipment_list_2025.xlsx XLSX spreadsheet
Bid_Form_For_Substation_Equipment_Painting.docx DOCX document
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix X Hanover Substation Equipment List

Item Number
Type
Equipment Designation
Manufacturer
Model No. or Dimensions
1
Transformer
XF HV 23
KHULMAN
159"W X 161"D X 161"h
2
Switchgear
SWITCHGEAR 22/23
Allis Chalmers
400"w x 180"w x 120"h
3
Other Structure
Capacitor House
Butler
480"w x 144"d x 120"h
4
Other Structure
Trificator HW-HW
Ohio Brass
48"h x 12" round (Previously Painted surfaces only)
5
Switchgear
Padmount Switch
Elliott
6
Switchgear
Padmount Switch
Elliott

Item #1

Item #1

Item #2

Item #2 (contd)

Item #3

Item #3 (contd)

Item #4

Item #5 & 6

Item #5 & 6 (contd)

End of Section