Appendix_V_Colorado_Substation.docx

DOCX document 20 MB Posted

Attached to
Electric Substation Equipment Painting
Solicitation number
IFB196740
Issued by
Santa Clara County, California

About this file

This is an equipment list appendix for an Invitation for Bids (IFB) issued by the City of Palo Alto Utilities (CPAU) for surface preparation and protective coating services across seven electric substations. The Colorado Substation Equipment List details 29 items requiring painting services, including transformers (XF CO 20, XF CO 21, XF CO 1, and XF CO 3), circuit breakers (OCB and GCB models from manufacturers including ITE, Siemens, and ABB), switchgear, control cabinets, capacitor houses, oil pumphouses, and steel support structures such as dead-end structures and poles. The project scope encompasses cleaning, surface preparation, corrosion treatment, priming, and application of high-performance utility-grade protective coatings suitable for energized utility environments. A non-mandatory pre-bid meeting and site walk is scheduled for April 15, 2026, at 9:00 a.m. at the Colorado Substation; written questions must be submitted by April 17, 2026, at 1:00 p.m.; and electronic bids are due April 24, 2026, at 3:00 p.m. through the City's OpenGov procurement portal. Work is anticipated to commence July 1, 2026, with a completion deadline of 1,095 working days from the Notice to Proceed.

The Year 1 engineering estimate for the Colorado Substation painting costs is $209,500, with a combined Year 1 total across all seven substations of approximately $940,500 (including $100,000 in mobilization costs). Subsequent annual expenditures are projected to range from $274,000 to $327,000 over a four-year project timeline. All materials and coating systems must meet or exceed utility-grade performance standards, including ANSI No. 70 light gray finish paint and Fire Engine Red bushing caps using silicone alkyd, with compliance required to Steel Structure Painting Council (SSPC) and Occupational Safety and Health Administration (OSHA) standards and a minimum one-year warranty. Contractors must hold California state contractor licensure, demonstrate evidence of full site inspection and project knowledge, and maintain registration with the California Department of Industrial Relations (DIR). All selected contractors must comply with California prevailing wage requirements under Labor Code Sections 1720 et seq. No specific set-asides for disadvantaged enterprises are detailed, and no incumbent vendors or current contractors are identified. Bid security requirements include a bid bond of no less than 10 percent of the aggregate bid amount for bids exceeding $25,000, with performance and payment surety bonds each required in the amount of 100 percent of the contract sum within 10 business days of the Notice of Award. Liquidated damages are assessed at $500 per day for failure to achieve final completion within the contract time, and the City will retain 10 percent of undisputed amounts on each progress payment, with payment due within thirty days of receipt of properly submitted applications.

View the file

Other files

File Type Posted
Electric_Substation_Equipment_Painting_(Addendum_#2_Revision).pdf PDF
Electric_Substation_Equipment_Painting_(Addendum_#1_Revision).pdf PDF
Appendix_VII_Maybell.docx DOCX document
Appendix_VIII_Quarry_Substation.docx DOCX document
Appendix_X_Hanover_Substation.docx DOCX document
Appendix_XI_Hansen_Way.docx DOCX document
Appendix_IX_ParkBlvd.docx DOCX document
Appendix_V_Colorado_Substation.docx DOCX document
Bid_Bond_Form.docx DOCX document
Appendix_VI_Adobe_Creek.docx DOCX document
Performance_Bond.docx DOCX document
Payment_Bond.docx DOCX document
REVISED_Equipment_list_2025_(1).xlsx XLSX spreadsheet
Substation_Painting_Specs.docx DOCX document
Equipment_list_2025.xlsx XLSX spreadsheet
Bid_Form_For_Substation_Equipment_Painting.docx DOCX document
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix V Colorado Substation Equipment List

Item Number
type
Equipment Designation
Manufacturer
Model No. or Dimensions
1
transformer
XF CO 20
RTE
15MVA 202"W X 136"D X 163H
2
transformer
XF CO 21
RTE
15MVA 202"W X 136"D X 163H
3
Switchgear
SWITCHGEAR 20/21
Peterson
434"w x 110"h x 195"d
4
Other Structure
Capacitor House
Mc Graw
320"w x 90"h x 60"w
5
transformer
XF CO 1
Federal Pacific
160MVA 238"w x 235"d x 200"h
6
transformer
XF CO 3
Federal Pacific
160 MVA 248"w x 200"d x 180"h
7
Other Structure
Auxiliary Distribution Switchgear
FPE
116"w x 41"d x 92"h
8
Other Structure
Oil Pumphouse
MAC
249"w x 118"d x 120"h
9
Breaker
OCB 12
ITE
69-KSB 5000
10
Breaker
OCB 22
ITE
69-KSB 5000
11
Breaker
OCB 32
ITE
69-KSB 5000
12
Breaker
OCB 52
ITE
69-KSB 5000
13
Breaker
OCB 62
ITE
69-KSB 5000
14
Breaker
GCB 72
Siemens
SPS 72
15
Breaker
OCB 82
ITE
69-KSB 5000
16
Breaker
OCB 92
ITE
69-KSB 5000
17
Breaker
GCB 102
ABB

Not Used

Not Used

20
Other Structure
GCB 1 CONTROL CABINET
ABB
HPL
21
Other Structure
GCB 3 CONTROL CABINET
ABB
HPL
22
Other Structure
COP1 Dead end Structures

2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS

23
Other Structure
COP2 Dead end Structures

2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS

24
Other Structure
COP3 Dead end Structures

2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS

25
Other Structure
60 kv AC Steel pole

38' POLE

26
Other Structure
OCB 22 and 32 Dead End Structure

2-36' and 1-25' columns and 3- 20' wide beams

27
Other Structure
OCB 52 Dead End Structure

2-36' columns and 1- 20' wide beam

28
Other Structure
OCB 92 Dead End Structure

2-36' columns and 1- 20' wide beam

29
Other Structure
GCB 132 Dead End Structure

2-36' columns and 2 20' wide beams

Item #1

Item #2

Item #3

Item #3 (contd)

Item #4

Item #4 (contd.)

Item #5

Item #5(contd.)

Item #6

Item #6 (contd)

Item #7

Item #7 (contd)

Item #8

Item #8

Item #9

Item #10

Item #11

Item #12

Item #13

Item #14

Item #15

Item #16

Item #17

Item #18 Not Used

Item #19 Not Used

Item #20

Item #21

Item #22

Item #23

Item #24

Item #25

Item # 26

Item #27

Item #28

Item # 29

End of List

Page | 2 image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg

File details come from the government source that posted it. Updated .