Appendix_V_Colorado_Substation.docx
DOCX document 20 MB Posted
- Attached to
- Electric Substation Equipment Painting
- Solicitation number
- IFB196740
- Issued by
- Santa Clara County, California
About this file
This is an equipment list appendix for an Invitation for Bids (IFB) issued by the City of Palo Alto Utilities (CPAU) for surface preparation and protective coating services across seven electric substations. The Colorado Substation Equipment List details 29 items requiring painting services, including transformers (XF CO 20, XF CO 21, XF CO 1, and XF CO 3), circuit breakers (OCB and GCB models from manufacturers including ITE, Siemens, and ABB), switchgear, control cabinets, capacitor houses, oil pumphouses, and steel support structures such as dead-end structures and poles. The project scope encompasses cleaning, surface preparation, corrosion treatment, priming, and application of high-performance utility-grade protective coatings suitable for energized utility environments. A non-mandatory pre-bid meeting and site walk is scheduled for April 15, 2026, at 9:00 a.m. at the Colorado Substation; written questions must be submitted by April 17, 2026, at 1:00 p.m.; and electronic bids are due April 24, 2026, at 3:00 p.m. through the City's OpenGov procurement portal. Work is anticipated to commence July 1, 2026, with a completion deadline of 1,095 working days from the Notice to Proceed.
The Year 1 engineering estimate for the Colorado Substation painting costs is $209,500, with a combined Year 1 total across all seven substations of approximately $940,500 (including $100,000 in mobilization costs). Subsequent annual expenditures are projected to range from $274,000 to $327,000 over a four-year project timeline. All materials and coating systems must meet or exceed utility-grade performance standards, including ANSI No. 70 light gray finish paint and Fire Engine Red bushing caps using silicone alkyd, with compliance required to Steel Structure Painting Council (SSPC) and Occupational Safety and Health Administration (OSHA) standards and a minimum one-year warranty. Contractors must hold California state contractor licensure, demonstrate evidence of full site inspection and project knowledge, and maintain registration with the California Department of Industrial Relations (DIR). All selected contractors must comply with California prevailing wage requirements under Labor Code Sections 1720 et seq. No specific set-asides for disadvantaged enterprises are detailed, and no incumbent vendors or current contractors are identified. Bid security requirements include a bid bond of no less than 10 percent of the aggregate bid amount for bids exceeding $25,000, with performance and payment surety bonds each required in the amount of 100 percent of the contract sum within 10 business days of the Notice of Award. Liquidated damages are assessed at $500 per day for failure to achieve final completion within the contract time, and the City will retain 10 percent of undisputed amounts on each progress payment, with payment due within thirty days of receipt of properly submitted applications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Electric_Substation_Equipment_Painting_(Addendum_#2_Revision).pdf | ||
| Electric_Substation_Equipment_Painting_(Addendum_#1_Revision).pdf | ||
| Appendix_VII_Maybell.docx | DOCX document | |
| Appendix_VIII_Quarry_Substation.docx | DOCX document | |
| Appendix_X_Hanover_Substation.docx | DOCX document | |
| Appendix_XI_Hansen_Way.docx | DOCX document | |
| Appendix_IX_ParkBlvd.docx | DOCX document | |
| Appendix_V_Colorado_Substation.docx | DOCX document | |
| Bid_Bond_Form.docx | DOCX document | |
| Appendix_VI_Adobe_Creek.docx | DOCX document | |
| Performance_Bond.docx | DOCX document | |
| Payment_Bond.docx | DOCX document | |
| REVISED_Equipment_list_2025_(1).xlsx | XLSX spreadsheet | |
| Substation_Painting_Specs.docx | DOCX document | |
| Equipment_list_2025.xlsx | XLSX spreadsheet | |
| Bid_Form_For_Substation_Equipment_Painting.docx | DOCX document | |
| Construction_Contract,_General_Conditions,_and_Change_Orders.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix V Colorado Substation Equipment List
| Item Number |
| type |
| Equipment Designation |
| Manufacturer |
| Model No. or Dimensions |
| 1 |
| transformer |
| XF CO 20 |
| RTE |
| 15MVA 202"W X 136"D X 163H |
| 2 |
| transformer |
| XF CO 21 |
| RTE |
| 15MVA 202"W X 136"D X 163H |
| 3 |
| Switchgear |
| SWITCHGEAR 20/21 |
| Peterson |
| 434"w x 110"h x 195"d |
| 4 |
| Other Structure |
| Capacitor House |
| Mc Graw |
| 320"w x 90"h x 60"w |
| 5 |
| transformer |
| XF CO 1 |
| Federal Pacific |
| 160MVA 238"w x 235"d x 200"h |
| 6 |
| transformer |
| XF CO 3 |
| Federal Pacific |
| 160 MVA 248"w x 200"d x 180"h |
| 7 |
| Other Structure |
| Auxiliary Distribution Switchgear |
| FPE |
| 116"w x 41"d x 92"h |
| 8 |
| Other Structure |
| Oil Pumphouse |
| MAC |
| 249"w x 118"d x 120"h |
| 9 |
| Breaker |
| OCB 12 |
| ITE |
| 69-KSB 5000 |
| 10 |
| Breaker |
| OCB 22 |
| ITE |
| 69-KSB 5000 |
| 11 |
| Breaker |
| OCB 32 |
| ITE |
| 69-KSB 5000 |
| 12 |
| Breaker |
| OCB 52 |
| ITE |
| 69-KSB 5000 |
| 13 |
| Breaker |
| OCB 62 |
| ITE |
| 69-KSB 5000 |
| 14 |
| Breaker |
| GCB 72 |
| Siemens |
| SPS 72 |
| 15 |
| Breaker |
| OCB 82 |
| ITE |
| 69-KSB 5000 |
| 16 |
| Breaker |
| OCB 92 |
| ITE |
| 69-KSB 5000 |
| 17 |
| Breaker |
| GCB 102 |
| ABB |
Not Used
Not Used
| 20 |
| Other Structure |
| GCB 1 CONTROL CABINET |
| ABB |
| HPL |
| 21 |
| Other Structure |
| GCB 3 CONTROL CABINET |
| ABB |
| HPL |
| 22 |
| Other Structure |
| COP1 Dead end Structures |
2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS
| 23 |
| Other Structure |
| COP2 Dead end Structures |
2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS
| 24 |
| Other Structure |
| COP3 Dead end Structures |
2 @ 2-47' COLUMNS AND 2-26' WIDE BEAMS
| 25 |
| Other Structure |
| 60 kv AC Steel pole |
38' POLE
| 26 |
| Other Structure |
| OCB 22 and 32 Dead End Structure |
2-36' and 1-25' columns and 3- 20' wide beams
| 27 |
| Other Structure |
| OCB 52 Dead End Structure |
2-36' columns and 1- 20' wide beam
| 28 |
| Other Structure |
| OCB 92 Dead End Structure |
2-36' columns and 1- 20' wide beam
| 29 |
| Other Structure |
| GCB 132 Dead End Structure |
2-36' columns and 2 20' wide beams
Item #1
Item #2
Item #3
Item #3 (contd)
Item #4
Item #4 (contd.)
Item #5
Item #5(contd.)
Item #6
Item #6 (contd)
Item #7
Item #7 (contd)
Item #8
Item #8
Item #9
Item #10
Item #11
Item #12
Item #13
Item #14
Item #15
Item #16
Item #17
Item #18 Not Used
Item #19 Not Used
Item #20
Item #21
Item #22
Item #23
Item #24
Item #25
Item # 26
Item #27
Item #28
Item # 29
End of List
Page | 2 image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.jpeg image24.jpeg image25.jpeg image26.jpeg image27.jpeg image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.jpeg image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg
File details come from the government source that posted it. Updated .