Appendix IX Park Boulevard Substation Equipment List

This document is an equipment inventory appendix for the City of Palo Alto Utilities' Electric Substation Equipment Painting project at the Park Boulevard Substation. The inventory identifies nine items requiring surface preparation and protective coating services, including two 28 MVA transformers manufactured by National Industries (each measuring 207" wide x 146" deep x 164" high with galvanized radiators), a Westinghouse switchgear unit (404" wide x 172" deep x 100" high), a Butler pump house switchgear, a mac oil tank, and four Ohio Brass trifurcator components (each 48" high x 12" round, with previously painted surfaces only). The Park Boulevard Substation is one of seven substations included in the overall citywide painting initiative, with an estimated Year 1 cost of $99,000 for this location. The contract solicitation follows an Invitation for Bids (IFB) process with a non-mandatory pre-bid meeting and site walk scheduled for April 15, 2026, at 9:00 a.m. at the Colorado Substation; written questions are due by April 17, 2026, at 1:00 p.m.; and electronic bids are due April 24, 2026, at 3:00 p.m. through the City's OpenGov procurement portal. Work is anticipated to commence July 1, 2026, with a completion deadline of 1,095 working days from the Notice to Proceed.

All coating materials and systems must meet or exceed utility-grade performance standards suitable for Palo Alto's environmental conditions, with specific requirements including ANSI No. 70 light gray finish paint and Fire Engine Red bushing caps using silicone alkyd, in compliance with Steel Structure Painting Council (SSPC) and Occupational Safety and Health Administration (OSHA) standards. Contractors must be California state licensed, demonstrate full site inspection knowledge, provide strong technical expertise, and maintain a proven safety record. The contract includes a minimum one-year warranty covering defects in workmanship and materials, with liquidated damages assessed at $500 per day for failure to achieve final completion within the contract time. All selected contractors must comply with California prevailing wage requirements under Labor Code Sections 1720 et seq. and maintain registration with the California Department of Industrial Relations (DIR). Performance and payment surety bonds are each required in the amount of 100 percent of the contract sum within 10 business days of the Notice of Award, with bid security requirements of no less than 10 percent of the aggregate bid amount for bids exceeding $25,000. The City reserves the right to award the contract to a single contractor or multiple contractors, with 10 percent of undisputed amounts retained on each progress payment, due within thirty days of receipt of properly submitted applications.

View the file

Other files

File Type Posted
Electric_Substation_Equipment_Painting_(Addendum_#2_Revision).pdf PDF
Electric_Substation_Equipment_Painting_(Addendum_#1_Revision).pdf PDF
Appendix_VII_Maybell.docx DOCX document
Appendix_VIII_Quarry_Substation.docx DOCX document
Appendix_X_Hanover_Substation.docx DOCX document
Appendix_XI_Hansen_Way.docx DOCX document
Appendix_IX_ParkBlvd.docx DOCX document
Appendix_V_Colorado_Substation.docx DOCX document
Bid_Bond_Form.docx DOCX document
Appendix_VI_Adobe_Creek.docx DOCX document
Performance_Bond.docx DOCX document
Payment_Bond.docx DOCX document
REVISED_Equipment_list_2025_(1).xlsx XLSX spreadsheet
Substation_Painting_Specs.docx DOCX document
Equipment_list_2025.xlsx XLSX spreadsheet
Bid_Form_For_Substation_Equipment_Painting.docx DOCX document
Construction_Contract,_General_Conditions,_and_Change_Orders.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix IX Park Substation Equipment List

Item Number
type
Equipment Designation
Manufacturer
Model No. or Dimensions
1
transformer
XF PB 20
National Industri
28 MVA 207"w x 146"d x 164"h (galvanized radiators)
2
transformer
XF PB 21
National Industri
28 MVA 207"w x 146"d x 164"h (galvanized radiators)
3
Switchgear
SWITCHGEAR 20/21
Westinghouse
404"w x 172"d x 100"h
4
Switchgear
PBS Pump House
Butler
5
Other Structure
Oil Tank
mac
6
Other Structure
Trificator COP Pipe 1
Ohio Brass
48"h x 12" round (Previously Painted surfaces only)
7
Other Structure
Trificator COP Pipe 2
Ohio Brass
48"h x 12" round (Previously Painted surfaces only)
8
Other Structure
Trificator PBS-HV
Ohio Brass
48"h x 12" round (Previously Painted surfaces only)
9
Other Structure
Trificator PBS-HW
Ohio Brass
48"h x 12" round (Previously Painted surfaces only)

Item #1

Item #1 (contd)

Item #2

Item #3

Item #3 (contd)

Item #4

Item #5

Item #6

Item #7

Item #8

Item #9

End of Section