Summary

This is an Asbestos Abatement Scope of Work document prepared by Environmental Technical Solutions (ETS) for the Auraria Higher Education Center (AHEC) regarding Phase II window abatement at the West Classroom Building located at 1050 10th Street Mall, Denver, Colorado 80204. The project involves the removal of approximately 384 square feet of trace asbestos-containing drywall systems with friable asbestos-containing joint compound to facilitate window replacement across four window types located throughout the building's first and second floors. The General Abatement Contractor (GAC) will deploy four separate crews working simultaneously in four different building areas to meet the general contractor's schedule. The project is scheduled to commence on May 16, 2026, and must be completed by June 12, 2026, with work hours available Monday through Sunday from 6:00 a.m. to 6:00 p.m. Prior inspections conducted by Clear Consulting in July 2024 identified drywall systems containing friable joint compounds with an estimated 2-3% chrysotile asbestos content, while subsequent sampling by ETS in January and February 2025 determined that window caulking and glazing bulk samples contained no detectable asbestos.

The scope requires unit pricing for removal of window caulking, window glazing, and trace asbestos-containing drywall systems, as well as secondary containment construction rates and labor costs broken down by worker, supervisor, and project manager hourly rates. All work must comply with Colorado Department of Public Health and Environment Regulation #8, OSHA 29 CFR 1926.1101, and EPA 40 CFR 61 Subpart M standards. The GAC is responsible for all regulatory notifications, including NESHAP notification to CDPHE, though a formal abatement permit is not anticipated. Environmental containment requirements include negative pressure ventilation maintained at minimum -0.02 inches of water column with a minimum four air exchanges per hour, one-chamber decontamination units within secondary containments, and three-chamber remote decontamination units. All asbestos waste must be double-bagged in 6 mil polyethylene bags with appropriate OSHA warning labels and disposed of at EPA-approved landfills. Final air clearance monitoring using Phase Contrast Microscopy must be conducted by a CDPHE-certified Air Monitoring Specialist, and all critical barriers must remain in place for a minimum of six hours following final visual inspection to allow for general contractor verification before dismantling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2432 S. Downing Street, Denver, Colorado 80210 ● 303.722.2973 ● Fax: 303.722.2974

ASBESTOS ABATEMENT SCOPE OF WORK

AURARIA CAMPUS WEST CLASSROOM BUILDING

1050 10TH STREET MALL

DENVER, COLORADO 80204

(2026 PROJECT B PHASE II WINDOW ABATEMENT)

PREPARED FOR:

AURARIA HIGHER EDUCATION CENTER

1156 7TH AVENUE

MARCH 16, 2026

PROJECT NUMBER E25.104

Table of Contents

1.0 BACKGROUND

2.0 SCOPE OF WORK

3.0 SPECIAL CONDITIONS

3.1 Regulatory Notification and Variances

3.2 Building Occupancy Status

3.3 Site Security

3.4 Field Changes

4.0 PROJECT DESIGN

4.1 Standards & Primacy of Rules

4.2 Site Access

4.3 Equipment Staging Areas

4.4 Utilities Service

4.5 Decontamination Facilities

4.6 Load Out Facilities

4.7 Critical Barriers

4.8 Negative Pressure Ventilation

4.9 Containment Construction

4.10 Pre-Cleaning Activities

4.11 Asbestos Removal

4.12 Waste Removal

4.13 Final Clean Criteria

4.14 Final Air Clearance Monitoring

4.15 Routine Air Monitoring

4.16 Electrical Hazards Control

4.17 Emergency Egress and Fire Protection

4.18 Respiratory Protection

4.19 Documentation Submittal

Appendix A – Window Removal Table with Drywall Removal Locations and Quantities

Appendix B – Typical Window Layout Photo Log

Appendix C – Abatement Phase Drawings

Appendix D – Clear Consulting West Classroom Pre-Renovation Building Inspection for

Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated

December 11, 2024

Appendix E – ETS’ West Classroom Building Limited Asbestos-Containing Material

Inspection Report, dated February 11, 2025

AHEC 2026 Project B Phase II Window Abatement March 16, 2026

ETS Project No. E25.104 Page 1

1.0 Background

Between July 2, 2024, and July 10, 2024, Clear Consulting performed limited asbestos building inspection services at the Auraria Campus West Classroom Building located at

1050 10th Street Mall, Denver, Colorado 80204. Clear Consulting identified drywall systems with friable asbestos containing joint compound that will need to be abated to facilitate the 2026 window replacement project or Project C.

Clear Consulting identified drywall systems with friable asbestos containing joint compound throughout the building. Composite drywall system bulk samples had analytical composite results of less than 1% asbestos content. The friable joint compounds contained an estimated 2-3% Chrysotile asbestos.

See Clear Consulting West Classroom Pre-Renovation Building Inspection for Suspect

Asbestos-Containing Materials, Window Unit Replacement Project Report, dated

December 11, 2024, in Appendix D for details.

On January 31, 2025, and February 6, 2025, Environmental Technical Solutions (ETS) performed limited bulk sampling of suspect asbestos containing window caulking and glazing identified throughout the building. Both the window caulking and glazing bulk samples collected were none detected for asbestos. See ETS’ West Classroom Building

Limited Asbestos-Containing Material Inspection Report, dated February 11, 2025, within Appendix E for details.

ETS will provide the building owner with project oversight and asbestos Air Monitoring

Specialist (AMS) services throughout abatement activities including final visual inspection and background air sampling within each containment work area.

2.0 Asbestos Scope of Work

1. Remove approximately 384 square feet of trace asbestos containing drywall systems with friable asbestos containing joint compound to facilitate window demolition.

Drywall will be removed in a straight line using manual removal methods or a mechanical means with a dustless shroud and a HEPA vacuum attached to the shroud inlet. Following removal, a light encapsulate will be applied using a spray bottle to the drywall edges. See the window removal table with window types, drywall removal locations, and quantities in Appendix A for details.

Type 1 Window Locations: The General Abatement Contractor (GAC) shall remove the MDF particle board at the window head and the associated vertical metal partition plate. No drywall is to be removed.

Type 2 Window Locations: The GAC shall remove approximately 6 inches of drywall at the vertical window jambs back to the interior partition wall.

Type 3 Stairwell Window Locations: The GAC shall remove approximately 4 inches of drywall at the vertical jambs.

ETS Project No. E25.104 Page 2

Type 4 Window Locations: The GAC shall remove approximately 12” of drywall at the locations where the wall returns at a 45-degree angle toward the windowsill.

See the Typical Window Layout Photo Log in Appendix B for details.

The window subcontractor will have 4 separate crews working in 4 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the General Contractor’s schedule. See the abatement phase drawings within

Appendix C for details.

Unit Pricing

1. Supply unit rate to remove one linear foot of non-friable asbestos containing window caulking.

2. Supply unit rate to remove one linear foot of non-friable asbestos containing window glazing.

3. Supply unit rate to remove one square foot of non-friable trace asbestos containing drywall system.

4. Supply unit rate to construct one 5’ x 5’ secondary containment.

5. Provide Worker hourly rate.

6. Provide Supervisor hourly rate.

7. Provide Project Manager hourly rate.

3.0 Special Conditions

3.1 Regulatory Notification and Variances

The GAC will make all mandatory notifications to Federal and State entities regulating their work as required by applicable rules, regulations, and standards. This includes, but is not limited, to the National Emission Standards for Hazardous Air Pollutants

(NESHAP) notification (notice provided to the Colorado Department of Public Health and Environment (CDPHE) with permit application).

The GAC is responsible for quantifying amounts of ACM to be reported on the

CDPHE Notification Form and submitting any variances necessary to properly complete the project. If applicable, the GAC to supply an asbestos abatement project design including a drawing with the decontamination unit, load out and negative air machine locations of each work area. It is anticipated that this project will not require a CDPHE asbestos abatement permit or notification.

ETS Project No. E25.104 Page 3

3.2 Facility Occupancy Status

This building will remain occupied during the scheduled work activities. All areas designated for abatement shall be unoccupied for the duration of abatement operations.

The GAC shall maintain all work areas and equipment storage areas in a clean, orderly, and dust-free condition at all times.

3.3 Site Security

Access to the work area shall be strictly regulated. Entry to the regulated area is by permission only to authorized personnel. The perimeter of the work area shall be monitored at all times during abatement by a competent person. Only asbestos certified/licensed personnel employed by the GAC or federal and state regulatory agency personnel will be allowed access to the work area.

3.4 Field Changes

Minor modifications to the project design or scope of work by CDPHE or the Project

Designer are allowed. Minor changes include but are not limited to, relocation of decontamination facility and waste load-out.

4.0 Project Design

4.1 Standards and Primacy of Rules

The following standards will be adopted as they pertain to asbestos abatement. In any instance where adopted standards are in conflict with each other, the most stringent shall apply.

1) Colorado Department of Public Health and Environment Regulation #8

2) 29 CFR 1926.1101, the OSHA Construction Industry Asbestos Standard

3) 40 CFR 61 Subpart M, EPA’s NESHAP Asbestos Standard

4) NIOSH/OSHA/USCG/EPA –“Occupational; Safety & Health Guidance

Manual for Hazardous Waste Site Activities”, Section 8-20; Heat Stress and

Other Physiological Factors.

5) All other applicable laws, rules, and regulations, including but not limited to those relating to:

6) Workers’ Compensation Insurance;

7) Liability Insurance

8) All contract specifications and documentation

4.2 Site Access

The project is anticipated to start May 16th, 2026, and must be completed by June 12th, 2026. The GAC has access to the building for the purpose of abatement Monday through

Sunday from 6:00am to 6:00pm.

ETS Project No. E25.104 Page 4

4.3 Equipment Staging Areas

The GAC shall schedule pick-up and delivery of equipment, supplies and waste dumpsters. Waste containers should not impede the flow of pedestrian and vehicular traffic.

4.4 Utilities Service

Electrical power and water will be supplied by the building owner. The GAC to provide temporary electrical panels if needed. The GAC will also provide a licensed electrician to connect building power to temporary panels.

4.5 Decontamination Facilities

At a minimum a direct one-chamber decontamination unit is to be constructed for trace asbestos containing drywall system abatement operations inside a secondary containment.

Additionally, a remote three-chamber decontamination unit will be set up adjacent to the work areas for the duration of the project. The decontamination facility will be constructed and prepared in accordance with CDPHE Regulation 8, Part B- Asbestos.

The decontamination facility is to be maintained in a clean and orderly condition throughout the duration of the project.

4.6 Load Out Facilities

All load-out and disposal procedures shall be in accordance with CDPHE Regulation 8, Part

B- Asbestos. At a minimum each secondary containment work area will require a one-chamber waste load-out.

4.7 Critical Barriers

All penetrations of the structure will be sealed with critical barriers. All critical barriers will be constructed in accordance with CDPHE Regulation 8 Part B- Asbestos. Personnel constructing the containment or installing/removing critical barriers will be in proper personal protective equipment (PPE) such as but not limited to respirators and Tyvek suits or similar.

4.8 Negative Pressure Ventilation

Each work area will be placed under negative pressure. The negative pressure device

(NPD) is to be vented to the exterior of the building. The exterior negative pressure exhaust opening will be secured using a hard barrier if necessary. Negative pressure shall be maintained at a minimum of -0.02 inches of water column as verified by a portable monometer device and visible confirmation of negative air flow using a smoke tube device. The negative air system shall exchange the volume of air inside the containment area a minimum of four (4) times per hour.

ETS Project No. E25.104 Page 5

4.9 Containment Construction

Each secondary containment utilized for the removal of trace asbestos containing drywall systems will include at a minimum a one-chamber decontamination unit/waste load-out at each entrance to the containment. Each secondary containment for the asbestos removal shall be constructed in accordance with CDPHE Regulation 8, Part B-Asbestos and

OSHA 29 CFR 1926.1101 Asbestos Construction Standard. Each containment will require a pre-abatement visual inspection prior to the start of any removal activities. The

GAC will make every attempt to minimize the number of containments utilized for this project and will combine multiple rooms into a single secondary containment when feasible.

4.10 Pre-Cleaning Activities

The GAC shall perform pre-cleaning activities according to CDPHE, Regulation 8, Part

B- Asbestos. Personnel pre-cleaning will be in proper personal protective equipment

(PPE) such as but not limited to respirators and Tyvek suits or similar.

4.11 Asbestos Removal

Following approval of work area preparations by the Environmental Consultant/Project

Designer, the GAC may begin abatement activities. ACM removal will be performed in accordance with CDPHE Regulation 8, Part B – Asbestos.

Trace asbestos containing drywall systems with friable asbestos containing joint compound at a minimum will be removed within a secondary containment which will include a one-chamber decontamination unit/waste load out. OSHA 29 CFR 1926.1101

Asbestos Construction Standard will be followed during drywall removal activities.

The window subcontractor will have 4 separate crews working in 4 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the

General Contractor’s schedule.

If previously unidentified non-friable asbestos containing window glazing or caulking are added to the scope of work during construction at a minimum will be removed according to CDPHE, Regulation 8, Part B- Asbestos, III.S.4 Abatement of Non-friable Asbestos

Containing Materials within a regulated work area.

The GAC will ensure that the work area is properly wetted or misted during abatement of

ACMs. The use of an airless sprayer will be used continuously to mist the work area. At the end of each shift the GAC shall ensure that all waste has been properly containerized prior to leaving the site.

ETS Project No. E25.104 Page 6

4.12 Asbestos Waste Removal

All ACM waste must be double-bagged in 6 mil polyethylene bags labeled with the appropriate OSHA warning label for asbestos and must also bear the generator label as required by EPA’s 40 CFR 61 Subpart M NESHAP Standard.

Containerizing and transport of asbestos wastes shall be in accordance with applicable regulations. It is the GAC responsibility to arrange for delivery and pickup of waste containers without impeding the flow of pedestrian and vehicular traffic. All waste load out activities shall be performed prior to 8:00AM, Monday through Friday. Waste load out activities performed on Saturday and Sunday may occur at any time, unless otherwise directed by the Owner or General Contractor.

The GAC will arrange for proper disposal of all waste materials at a landfill approved by the EPA to accept friable and non-friable asbestos waste. GAC employees are required to utilize protective coveralls and respirators when handling ACM waste that is double-bagged.

4.13 Final Clean/ Final Visual Inspection Criteria

All interior surfaces of the work areas will be free of visible dust and debris. Following completion of final cleaning, an encapsulant shall also be applied to any exposed edges of drywall where cuts were performed prior to final visual inspection. Each work area must pass a final visual inspection by a CDPHE certified AMS leaving only critical barriers in place.

4.14 Final Air Clearance Monitoring

Sample collection and analysis for background air monitoring within each containment work area following abatement shall be in accordance with CDPHE Regulation 8, Part B-

Asbestos and shall use Phase Contrast Microscopy (PCM).

Upon written notification that air monitoring levels are acceptable, the AMS shall authorize the GAC to remove critical barriers. Each secondary containment shall remain in place for a minimum of 6 hours following the final visual inspection and background air sampling to allow the General Contractor sufficient time to inspect and confirm that all work has been completed accurately and in accordance with the project specifications prior to dismantling the containment.

4.15 Personal Exposure Air Monitoring

The GAC shall be responsible for conducting personal exposure air monitoring as applicable in accordance with OSHA 29 CFR 1926.1101 Asbestos Construction

Standard.

ETS Project No. E25.104 Page 7

4.16 Electrical Hazards Control

All electrical power utilized during the project will be on ground fault circuit interrupters

(GFCI) whose power source is located outside the work area.

4.17 Emergency Egress and Fire Protection

A. Egress Points

1. The GAC shall develop an emergency egress plan and inform personnel of such plan.

B. Fire Protection Plan

1. No items capable of initiating or sustaining combustion (lighters, matches, torches, etc.) will be allowed in containment.

2. The use of flammable liquids is not permitted.

3. Any electricity utilized must be on Ground Fault Circuit Interrupters (GFCI).

4. A minimum of one, 2A:10B:C rated fire extinguishers will be maintained on-site. There must be available at least one 2A:10B:C rated fire extinguisher within a maximum travel distance of 50 feet from any point in the work area.

5. Workers will be trained in the use of fire extinguishers, emergency egress plans, basic fire safety, and emergency reporting procedures prior to work beginning.

6. All emergency exits will be labeled as such with tools available for breaching poly and keys in door locks where necessary.

7. The Contractor must implement an emergency action and fire prevention plan in accordance with 29 CFR 1910.38 Employee emergency plans and fire prevention plans.

C. Fall Protection Plan

1. The GAC shall comply with all applicable OSHA regulations, including but not limited to 29 CFR 1926 Subpart M – Fall Protection.

2. Fall protection shall be provided by the GAC for all employees exposed to falls of 6 feet or greater to a lower level during stairwell abatement activities.

3. Temporary guardrail systems meeting OSHA strength and height requirements (top rail 42 inches ± 3 inches and capable of withstanding 200 pounds of force).

It is anticipated that the GAC will need scaffolding and proper fall protection for the stairwell window removal.

ETS Project No. E25.104 Page 8

4.18 Respiratory Protection

The GAC personnel shall provide proper respiratory protection with NIOSH approved HEPA filters during all pre-clean, removal and waste load out procedures.

The GAC shall provide proof of medical fitness to wear respiratory protection and current fit testing documentation for all employees.

4.19 Document Submittal

Following de-mobilization, the GAC shall provide the following submittals to the

Owner:

✓ Copies of all regulatory inspections, orders, citations, or other correspondence related to this project.

✓ Daily logs

✓ GAC certifications and worker certifications

✓ Copies of all asbestos waste shipment manifests.

Following de-mobilization, Environmental Technical Solutions, LLC shall provide the following submittals to the Owner:

✓ Copies of all required visual inspections, air and/or bulk sampling results.

Prepared by:

Mike Pozzi

Project Designer s

Appendix A – Window Removal Table with Drywall Removal Locations and Quantities

Room Window Type Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

162V Type 2 14' 11"x7' (x2) 5

1. Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides

P100JJ Type 2 4' 8"x7' (x2) 5

2. Remove drywall interior partition wall to window frame

162U Type 2 9' 11"x 7' 5

3. Remove 4” of drywall from the side of the window

162T Type 2 9' 11"x 7' 5

4. At angled corners remove 12” of drywall to window

162S Type 2 13' 6"x7' 5 162R Type 2 11' 5"x7' 5 162Q Type 2 9' 2"x 7' 5 162P Type 2 7'x 11"x 7' 5 162N Type 2 11' 7"x 7' 5 162M Type 2 14' 2"x7' 5 162L Type 2 9' 8"x 7' 5 156 Type 2 29' 10"x7' 5 152 Type 2 29' 9"x 7' 5 151 Type 2 29' 9"x 7' 5 150 Type 2 29' 9"x7 5 133F Type 2 16' 4" x 7' 5 133E Type 2 9' 10"x7' 5 133D Type 2 14' 10"x7' 5 133C Type 2 14' 9"x7 5 136S Type 2 14' 11" x 3' 11" 5 136R Type 2 9' 8"x 3' 11" 5 136Q Type 2 14' 9"x 3' 11" 5 139P Type 2 9' 9" x 3' 11" 5

Removed SF

Additional Notes Window Types

136N Type 2 9' 9" x 3' 11" 5

1. Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides.

136L Type 2 24' 9"x 3' 11" 5

2. Remove drywall interior partition wall to window frame

136K Type 2 9' 8"x 3' 11" 5

3. Remove 4” of drywall from the side of the window

136J Type 2 9' 8"x 3' 11" 5

4. At angled corners remove 12” of drywall to window

136H Type 2 9' 8"x 3' 11" 5 136G Type 2 9' 8"x 3' 11" 5 136F Type 2 9' 8"x 3' 11" 5 143 Type 2 24' 9"x 3' 11" 5 145 Type 2 39' 10"x 3'11" 5 147 Type 2 25'x3'11" 5 268 Type 2 20'x3' 11" 5 266D Type 2 14' 10"x 3'11" 5 266D1 Type 2 4'8" x 3' 11" 5 266C Type 2 14' 7" x 3' 11" 5 262 Type 2 29' 11"x 3' 11" 5 254K Type 2 9' 5" x 3' 11" 5 254J Type 2 9' 5" x 3' 11" 5 254H Type 2 9' 5" x 3' 11" 5 254G Type 2 9' 5" x 3' 11" 5 254F Type 2 9' 5" x 3' 11" 5 254E Type 2 9' 5" x 3' 11" 5 254D Type 2 9' 5" x 3' 11" 5 254C Type 2 14' 11"x 3' 11" 5

Removed SF

Additional Notes Window Types

254B Type 2 9' 5" x 3' 11" 5

1. Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides.

254A Type 2 9' 5" x 3' 11" 5

2. Remove drywall interior partition wall to window frame

236K Type 2 14' 11" x 3' 11" 5

3. Remove 4” of drywall from the side of the window

236J Type 2 and Type 4 9' 1" x 3' 11" 6

Southeast corner 45 angle, northeast corner normal drywall removal needed

4. At angled corners remove 12” of drywall to window

236 Type 2 and Type 4 9' 1" x 3' 11" 6

Northwest corner 45 angle, northeast corner normal drywall removal needed

236H Type 2 9' 10"x3'11" 5 236G Type 2 9' 10"x3'11" 5 236F Type 2 9' 10"x3'11" 5 236E Type 2 13'10" x3'11" 5 232 Type 2 19' 11"x 3' 11" 5 229 Type 2 and Type 4 8' 2" x 3' 11" 6 NE window has the 45 degree 230 Type 2 7' 3" x 3' 11" 5 233 Type 2 30'2" 3 ' 11" 5 234 Type 2 14'11"x 3' 11" 5 235 Type 2 14'11"x 3' 11" 5 237 Type 2 and Type 4 19' 11"x 3' 11" 5 238 Type 2 and Type 4 27' 11"x 3' 11" 6

S200A Type 2 and Type 3 13'x 3' 11" type 2, 14' 11"x 7' Type 3 7

240D Type 1 and Type 2 60' 7" x 3'11" 3 Southwest wall has drywall

Removed SF

Additional Notes Window Types

240E Type 1 16' 8" x 3' 11" 0

1. Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides.

240G2 Type 1 10'x 3'11" 0

2. Remove drywall interior partition wall to window frame

240G2A Type 1 10'x 3'11" 0

3. Remove 4” of drywall from the side of the window

240G Type 1 15' x3' 11" 0

4. At angled corners remove 12” of drywall to window

242L Type 1 15' x3' 11" 0 242M Type 1 15' x3' 11" 0 242P Type 1 15' x3' 11" 0 242S Type 1 30' x 3' 11" 0 242T Type 1 10' x 3' 11" 0 242W Type 1 10' x 3' 11" 0 242Y Type 1 10' x 3' 11" 0 242Z Type 1 14' 9" x 3' 11" 0 244A Type 2 25' x 3' 11" 5 247K Type 2 10' x 3' 11" 5 247J Type 2 10' x 3' 11" 5 247H Type 2 10' x 3' 11" 5 247G Type 2 10' x 3' 11" 5 247F Type 2 10' x 3' 11" 5 247E Type 2 10' x 3' 11" 5 247E Type 2 10' x 3' 11" 5 247D Type 2 10' x 3' 11" 5

Removed SF

Additional Notes Window Types

247C Type 2 10' x 3' 11" 5

1. Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides.

247B Type 2 14' 3' 11" 5

2. Remove drywall interior partition wall to window frame

Total Removal (SF) 384

3. Remove 4” of drywall from the side of the window

4. At angled corners remove 12” of drywall to window

Appendix B – Typical Window Layout Photo Log

TYPICAL WINDOW PHOTO LOG

Auraria Campus West Classroom Building, 1050 10th Street Mall, Denver, CO 80204

Type 1 - Remove MDF particle board (noted above) from header (no drywall), remove metal vertical partition plate from sides

Type 1 - Remove MDF particle board from header (no drywall), remove metal vertical partition plate from sides (noted above)

Type 2 – Remove drywall interior partition wall to window frame

Type 3 - Remove 4” of drywall from the side of the window

Type 4 – At angled corners remove 12” of drywall to window

Appendix C – Abatement Phase Drawings

132A

132B

132C 132D 132E

132F

132G

133C 133D

133E

133F

P100AA

P100JP100M

154155

P100N

P100P

C100C

C100A

V100B

V100A

S100A

L100A

C100B

145A P100CC

109 SF

979 SF

202 SF

434 SF

91 SF

110 SF

37 SF

562 SF

357 SF

258 SF

483 SF

484 SF

1065 SF

582 SF

P100EE

45 SF

113 SF 114 SF

162 SF

164 SF

165 SF

108 SF

51 SF

236 SF288 SF

30 SF

47 SF

2553 SF

2785 SF93 SF

643 SF

185 SF

684 SF

484 SF

484 SF

320 SF

1055 SF

160B

160A

483 SF

160C

160D

12 SF

95 SF

133H

598 SF

159 SF

C133

133B

94 SF

133G

82 SF

282 SF

C132

132H

133A

85 SF

132J

79 SF

487 SF

162X

162V

162W

P100JJ

162U 162T 162S 162R 162Q 162P

162A 162B

162C 162D 162E 162F 162G 162H

162N 162M 162L

162K

162J

156 152 151

P100HH

136E

136F

136G 136H 136J

136C

136B

136K

136L

136A

136W

136V

136U

136T

136S

136R136Q

136P136N

136D

823 SF

926 SF

48 SF

170 SF

103 SF 109 SF

108 SF

221 SF

165 SF

1128 SF

101 SF

93 SF

126 SF

191 SF

141 SF

93 SF

142 SF

116 SF116 SF

115 SF

114 SF

114 SF

110 SF

109 SF

873 SF

864 SF

875 SF

158 SF

26 SF

137 SF 137 SF

191 SF 162 SF

167 SF

148 SF

137 SF 94 SF

95 SF

88 SF 83 SF

88 SF 88 SF

118 SF

16 SF

117 SF

183 SF

165 SF113 SF131 SF

141 SF

130 SF

160 SF140 SF

153A 153B

153C

295 SF

C162

C136

642 SF

852 SF

119 SF

124 SF

121 SF131 SF

62 SF

177 SF

103 SF

R100D

284 SF

R100C

328 SF

P100K

42 SF

P100L

79 SF

Abatement Phasing

2026 AHEC West Classroom Window Project

West Classroom 1050 10th Street, Denver, Colorado 80204

Figure 1-1

2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net

Date: 02/26/2026 1st floor

6/3/26 - 6/5/26 5/27/26 - 6/2/26 5/19/26 - 5/26/26 5/16/26 - 5/18/26

5/16/26 - 5/18/265/19/26 - 5/26/265/27/26 - 6/2/26

GAC Crew 1

GAC Crew 2

247A

247B

247C 247D

247E

247F

247G

247K

247H

247J

P200N

S200AA

C200AA

CLASSROOM

TO

CENTRAL

P200K

P200W

244A

247M

127 SF

724 SF

8 SF

10 SF

418 SF

562 SF

583 SF

132 SF

110 SF

14 SF

312 SF

311 SF

416 SF

1429 SF

420 SF

462 SF

20 SF

1000 SF

1113 SF

379 SF

595 SF

379 SF

630 SF

133 SF117 SF

209 SF

791 SF

BUILDING

TO

ARTS

BUILDING

TO

ARTS

C200BB

1546 SF

247L

247N 247P

139 SF

139 SF

138 SF

157 SF

123 SF

126 SF

110 SF

109 SF

123 SF

247Q

22 SF

632 SF

266D

266D1

266C

266B

266A

262A

254L

254K 254J 254G 254F 254E

254M 254N

254P 254Q 254R 254S 254T

254U

254V

254A254B 254C

254D

236N236M

236L

236K

236J

236H

236G

236F

236B2

236A1

236E

236D

236C

113 SF

117 SF 117 SF

105 SF 110 SF

119 SF 124 SF

125 SF 125 SF

127 SF

101 SF

185 SF

158 SF

158 SF

146 SF

533 SF

342 SF

141 SF

152 SF

118 SF118 SF

178 SF

117 SF

118 SF117 SF117 SF

894 SF

13 SF

142 SF

150 SF

158 SF

104 SF

336 SF

31 SF

C236B

256 SF

C

A

S

F

70 SF

152 SF

152 SF

70 SF

151 SF

165 SF

100 SF

142 SF

C254

C247

560 SF

556 SF

236A

236A2

70 SF

236B1

70 SF

82 SF

240E

282 SF

240F

160 SF

240B

55 SF

240A

138 SF

240A1

55 SF

240D

1837 SF

240C

1842 SF

S200BB

99 SF

C

S

F

C200DD

1980 SF

254H

117 SF

254W

26 SF

223 SF

P200L

P J

59 SF

4880 SF

339 SF

S

F

121 SF

205 SF

R200CR200D

379 SF

295 SF

242DD

242FF

242Z

252 SF

242Y

166 SF

242W

165 SF

242T

509 SF

242S

509 SF

242P

251 SF

242M

251 SF

242L

165 SF

240G

303 SF

240G2A

70 SF

240G2

163 SF

242K

76 SF

242N

94 SF

242J

84 SF

242A

91 SF

242H

76 SF

242G

104 SF

242Q

241 SF

242R

242 SF

242U

242 SF

242V

240 SF

242BB

73 SF

242X

94 SF

242F1

94 SF

242CC

73 SF

240H

533 SF

242E

153 SF

242D

143 SF

242B

104 SF

242A

104 SF

V242F1

74 SF

124 SF

242HH

240 SF

242GG

242 SF

242F

855 SF

242EE

256 SF

242AA

108 SF

V242F2

71 SF

C242A

697 SF

C D

S

F

242C

323 SF

C B

S

F

C242C

1221 SF

P200G

34 SF

P200M

240G1

41 SF

Figure 1-2

Date: 02/26/2026 2nd floor

2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net

5/26/26 - 5/29/26 5/16/26 - 5/18/26

6/1/26 - 6/5/266/8/26 - 6/12/26

Fall Protection Plan Required

Abatement Phasing

2026 AHEC West Classroom Window Project

West Classroom 1050 10th Street, Denver, Colorado 80204

5/16/26 - 5/18/265/19/26 - 5/26/265/27/26 - 6/3/26

5/19/26 - 5/22/26

GAC Crew 3

GAC Crew 4

Appendix D – Clear Consulting West Classroom Pre-Renovation Building Inspection for

Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated

PRE-RENOVATION BUILDING INSPECTION

FOR

SUSPECT ASBESTOS-CONTAINING MATERIALS

WINDOW UNIT REPLACEMENTS PROJECT

WEST CLASSROOM

AURARIA CAMPUS

1050 10TH STREET MALL

Prepared for:

Auraria Higher Education Center Facilities Services

1156 7th Street Denver, Colorado 80217

Prepared by:

Clear Consulting, LLC 37159 Pheasant Run

Elizabeth, Colorado 80107

TABLE OF CONTENTS

SECTION PAGE

1.0 Project Scope of Work 1

2.0 Project Personnel 3

3.0 Regulatory Review – Asbestos-Containing Materials 3

4.0 Identified Asbestos-Containing Materials 4

5.0 Identified Non-Asbestos-Containing Materials 4

6.0 Identified Materials Containing “Trace” Amounts of Asbestos 9

7.0 Drywall Materials with ACM Joint Compound – Composite Analysis 9

8.0 Conclusions and Recommendations 13

9.0 Building Inspector Attestation and Signature 13

EXHIBIT A:

Suspect Asbestos-Containing Materials – Bulk Sample Log

EXHIBIT B:

Building Floor Plans

• Floor Plan No. 1: Floor 1

Approximate Bulk Sample Locations

• Floor Plan No. 2: Floor 2 Approximate Bulk Sample Locations

• Floor Plan No. 3: Floor 1 Areas/Locations of Identified ACM

• Floor Plan No. 4: Floor 2 Areas/Locations of Identified ACM

EXHIBIT C:

Analytical Laboratory Reports - Polarized Light Microscopy

EXHIBIT D: Consulting Firm and Personnel Certifications

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

1.0 PROJECT SCOPE OF WORK

Pre-renovation inspections of the West Classroom Building (WC-1139) located on the Auraria Higher Education Center (AHEC) campus were conducted from Tuesday, July 2, 2024 through Wednesday, July 10, 2024 by Clear Consulting, LLC for suspect asbestos-containing materials (ACM) that will potentially be impacted by the scheduled replacement of window units located on Floors 1 and 2 and storefront/exterior door units located on Floor 1. The purpose of the inspections was to locate and sample suspect materials associated with the specific areas of the building to be impacted in order to compile an inventory of identified ACMs.

The inspection was conducted for Auraria Higher Education Center (AHEC) and the building is located on the AHEC Campus at 1050 10th Street Mall in Denver, Colorado.

1.1 INSPECTION FOR SUSPECT ASBESTOS-CONTAINING MATERIALS (ACM)

During the inspection conducted by Clear Consulting, LLC, the following suspect ACMs were identified by homogeneous areas of presence for the collection of bulk samples:

• Drywall walls – non-textured with joint compound (31 homogeneous areas)

• Interior window stool adhesive (1 homogeneous area)

For the identification of ACM, a sampling scheme was utilized that employed the selection of sample locations for suspect materials on a random basis and the quantity of samples collected were in compliance with the requirements of the U.S. Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, Subpart E, as required by Colorado Air Quality Control Commission (AQCC), Regulation No. 8 for the inspection of school and commercial buildings.

Each bulk sample collected has an identification number that begins with the following acronym sequence:

• WC-1139-

This acronym sequence is followed by the room/area number identifying the location of the sample collection.

This room/area number is followed by another acronym describing each suspect material, followed by a sequential homogeneous area number (if applicable), and last by a sequential individual sample number.

• CDW = non-textured drywall with joint compound

• WSA = interior window stool adhesive

The thirty-one (31) homogeneous areas of non-textured drywall with joint compound (CDW) located throughout the exterior perimeter walls and associated with window/storefront/exterior door unit locations on Floors 1 and 2 of the building were separated and identified as follows:

• CDW 01-01 to 01-07 - Floor 2 – exterior perimeter drywall walls – pink/tan drywall w/ off-white compound

• CDW 01-08 to 01-14 – Floor 1 – exterior perimeter drywall walls - pink/tan drywall w/ off-white compound

• CDW 02: Floor 2 – 266D - south drywall partition wall – tan/grey drywall with white compound

• CDW 03: Floor 2 – 254K – south drywall partition wall – tan/off-white drywall with cream compound

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

• CDW 04: Floor 2 – 254H/254J – south drywall partition walls – tan/grey/ drywall with cream compound

• CDW 05: Floor 2 – 254C/254D – south drywall partition walls – tan/grey drywall with cream compound

• CDW 06: Floor 2 – 229/236 - drywall infill at columns – tan/off-white drywall with off-white compound

• CDW 07: Floor 2 – 238 - drywall infill at columns – tan/off-white drywall with off-white compound

• CDW 08: Floor 2 – 254B/254K – drywall infill at windows – grey/tan drywall with cream compound

• CDW 09: Floor 1 – 147 – south drywall partition wall – tan/off-white drywall with white compound

• CDW 10: Floor 1 – 136H/136J – drywall partition wall – tan/off-white drywall with off-white compound

• CDW 11: Floor 1 – 147 – drywall infill at column – tan/off-white drywall with off-white compound

• CDW 12: Floor 1 – P100JJ - drywall partition walls – tan/grey drywall with cream compound

• CDW 13: Floor 1 – 162N/162P - drywall partition wall – tan/off-white drywall with cream compound

• CDW 14: Floor 1 – 136G/136L - drywall partition walls – tan/off-white drywall with off-white compound

• CDW 15: Floor 1 – 132F/136R - drywall partition walls – white/tan drywall with cream compound

• CDW 16: Floor 1 – 150 - drywall infill at column – tan/off-white drywall with cream compound

• CDW 17: Floor 1 – 152/156 - drywall partition walls – grey/tan drywall with cream compound

• CDW 18: Floor 1 – 136G/K/R - drywall partition walls - pink/tan drywall with off-white compound

• CDW 19: Floor 1 – 132D/133F - drywall infill at windows – white/grey/tan drywall with white compound

• CDW 20: Floor 1 – 152/156 - drywall infill at columns – grey/tan drywall with white compound

• CDW 21: Floor 1 – 162L/P/T - drywall infill at columns – off-white/tan drywall with white compound

• CDW 22: Floor 2 – 236E/236H - drywall partition walls – off-white/tan drywall with off-white compound

• CDW 23: Floor 2 – 237 – east drywall partition wall - grey/tan drywall with white compound

• CDW 24: Floor 2 – 240C/240D – exterior perimeter/lower wall – grey/tan drywall with white compound

Note: building area completely renovated/reconfigured – original 244A/259 and south to Suite 239

• CDW 25: Floor 2 – 242L/242T - drywall partition walls – grey/tan drywall with white compound

• Note: building area completely renovated/reconfigured – original 244A/259 and south to Suite 239

• CDW 26: Floor 2 – 247G/247H - drywall partition walls – pink/tan drywall w/white/off-white compound

• CDW 27: Floor 2 – 266C/268 – drywall infill at windows - pink/tan drywall w/white/off-white compound

• CDW 28: Floor 2 – 254B/254K - drywall infill at windows – pink/tan/off-white drywall w/white compound

• CDW 29: Floor 2 – 236E/236G – drywall infill at windows – off-white/tan drywall with white compound

• CDW 30: Floor 2 – 229/233 - drywall partition walls - pink/tan drywall with white compound

• CDW 31: Floor 2 – 247J/247K - drywall partition wall - pink/tan drywall with white compound

The one (1) homogeneous area of interior window stool adhesive (WSA) located under metal window stool covers was identified as follows:

• WSA 01: Floor 1 – 145/151 – window stool cover adhesive – brown resinous material

Bulk samples of the suspect materials encountered were collected and each sample was assigned a unique identification number. Bulk samples were collected by an EPA/State of Colorado certified building inspector.

All samples were submitted to Eurofins Reservoirs Environmental, Inc. (ERE), a third-party independent laboratory. ERE is accredited through the National Voluntary Laboratory Accreditation Program (NVLAP) as required by USEPA. Bulk samples were analyzed by Polarized Light Microscopy (PLM) in general compliance with guidelines established by 40 CFR 763, Subpart E. Asbestos concentrations were visually estimated and/or point counted and reported by percent for each layer of the sample.

The specific information regarding the identified ACM is presented in Section 4.0 of this report.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

2.0 PROJECT PERSONNEL

The following representatives of Clear Consulting, LLC, certified as Building Inspectors as required by Colorado Department of Public Health and Environment (CDPHE), Air Pollution Control Division (APCD), conducted the building inspections for suspect ACMs at the West Classroom Building:

Clear Consulting, LLC: ACF No. 14902

Name of Building Inspector: H. Kim Thiel

State of Colorado Certification No.: 668

Name of Building Inspector: Frank Hulce

State of Colorado Certification No.: 1849

Name of Building Inspector: Jayson Windle

State of Colorado Certification No.: 4266

3.0 REGULATORY REVIEW – ASBESTOS-CONTAINING MATERIALS

USEPA and Colorado Department of Public Health and Environment (CDPHE) regulate all building materials that contain greater than 1% asbestos as determined by polarized light microscopy (PLM) analysis. The Occupational Health and Safety Administration (OSHA) regulates any building materials containing greater than 1% asbestos as well as smaller amounts of asbestos (“trace” amounts of 1% or less but greater than 0%) that may result in an airborne asbestos exposure due to physical disturbance.

USEPA and CDPHE Regulation No. 8, Part B, requires that suspect ACM in buildings built prior to 1988 be assumed to be asbestos-containing or an inspection be conducted by an EPA-accredited/CDPHE-certified asbestos building inspector. CDPHE, Regulation No. 8, Part B, requires an asbestos inspection in compliance with the AHERA protocol be conducted prior to demolition or renovation activities that could disturb ACM.

The USEPA and CDPHE require all friable ACMs be removed prior to renovation or demolition and any non-friable ACMs that may be rendered friable by those same activities.

In some circumstances, “point count” analysis is required for bulk samples previously identified by PLM. Point counting is a more detailed method of analysis than standard PLM. Federal and state agencies define ACM as materials containing greater than 1% asbestos. The NESHAP regulation requires that if standard PLM analysis determines that a sample contains less than 10% asbestos, the material must be considered asbestos-containing or be point counted.

CDPHE Regulation No. 8 (Section III.A.1.c.) requires that if the asbestos content of a sample of friable asbestos is estimated to be 1% asbestos or less, but greater than 0%, by a method other than point counting, the determination shall be repeated using the point counting technique with PLM and if the result obtained is different from the PLM result, the point count result must be used.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

4.0 IDENTIFIED ASBESTOS-CONTAINING MATERIALS

• No encountered suspect materials sampled were identified as ACM.

4.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED ASBESTOS-CONTAINING MATERIALS

The following summary itemizes the locations of the identified ACM.

• No encountered suspect materials sampled were identified as ACM.

5.0 IDENTIFIED NON-ASBESTOS-CONTAINING MATERIALS

The following suspect materials were sampled, analyzed, and identified as non-asbestos-containing materials:

• Drywall walls – non-textured with joint compound (19 homogeneous areas)

• Interior window stool adhesive (1 homogeneous area)

5.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED NON-ASBESTOS CONTAINING MATERIALS

The following samples of suspect material were collected during the current inspection and were identified as non-ACM:

Note: Due to the assumption that all drywall partition walls adjacent or perpendicular to exterior perimeter walls, drywall infills at columns, and drywall infills at window units are OSHA drywall (Refer to Section 8) based upon the visual homogeneity of these materials, the approximate quantities of the following identified non-ACM, non-textured drywall walls are irrelevant but reported as approximate below.

Identified Non-ACM Description Location Approximate Quantity

Non-Textured Drywall (CDW 02) – 1 H.A. Floor 2

266D Partition Wall

800 Sq. Ft.

Non-Textured Drywall (CDW 03) – 1 H.A. Floor 2

254K South Partition Wall

300 Sq. Ft.

Non-Textured Drywall (CDW 04) – 1 H.A. Floor 2

Suite 254 (Partial) Partition Walls

1,500 Sq. Ft.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 05) – 1 H.A. Floor 2

Suite 254 (Partial)

1,500 Sq. Ft.

Non-Textured Drywall (CDW 08) – 1 H.A. Floor 2

Suite 254 Window Recesses

200 Sq. Ft.

Non-Textured Drywall (CDW 09) – 1 H.A. Floor 1

South Partition Wall

850 Sq. Ft.

Non-Textured Drywall (CDW 12) – 1 H.A. Floor 1

P100JJ

450 Sq. Ft.

Non-Textured Drywall (CDW 17) – 1 H.A. Floor 1

150/151/152/156

3,200 Sq. Ft.

Non-Textured Drywall (CDW 20) – 1 H.A. Floor 1

150/151/152/156 Drywall Column Infills

60 Sq. Ft.

Non-Textured Drywall (CDW 21) – 1 H.A. Floor 1

Suite 162 Column/Window Infills

300 Sq. Ft.

Non-Textured Drywall (CDW 23) – 1 H.A. Floor 2

East Drywall Partition Wall

600 Sq. Ft.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 24) – 1 H.A. Floor 2

Southwest Remodeled Area Exterior Perimeter

Lower Walls

1,800 Sq. Ft.

Non-Textured Drywall (CDW 25) – 1 H.A. Floor 2

Southwest Remodeled Area Drywall Partition Walls

15,000 Sq. Ft.

Non-Textured Drywall (CDW 26) – 1 H.A. Floor 2

Suite 247 (Partial)

2,800 Sq. Ft.

Non-Textured Drywall (CDW 27) – 1 H.A. Floor 2

268/Suite 266 Drywall Window Recesses

60 Sq. Ft.

Non-Textured Drywall (CDW 28) – 1 H.A. Floor 2

Suite 254

Non-Textured Drywall (CDW 29) – 1 H.A. Floor 2

Suite 236

50 Sq. Ft.

Non-Textured Drywall (CDW 30) – 1 H.A. Floor 2

229 through 237

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 31) – 1 H.A. Floor 2

Suite 247

100 Sq. Ft.

Window Stool Adhesive (WSA 01) – 1 H.A. Floors 1 and 2

Window Stool Metal Caps Unknown

5.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF NON-ACM

Identified Non-ACM Description Classification Physical Assessment

Non-Textured Drywall (CDW 02) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 03) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 04) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 05) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 08) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 09) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 12) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 17) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 20) – 1 H.A. Miscellaneous – Non-Friable Good Condition

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 21) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 23) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 24) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 25) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 26) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 27) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 28) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 29) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 30) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 31) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Window Stool Adhesive (WSA 01) – 1 H.A. Miscellaneous – Non-Friable Good Condition

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

6.0 IDENTIFIED MATERIALS CONTAINING “TRACE” AMOUNTS OF ASBESTOS

Suspect materials can yield results indicating “trace” amounts of asbestos (1% or less but greater than 0%).

These materials are not regulated as ACM but require removal methods to comply with the exposure limits stipulated by the OSHA Construction Standard for Asbestos (29 CFR 1926.1101) with regard to their disturbance and/or removal:

• No encountered suspect materials sampled were identified with “trace” amounts of asbestos.

6.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED “TRACE” MATERIALS

6.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF “TRACE” MATERIALS

6.3 POINT COUNT ANALYSES OF “TRACE” MATERIALS

7.0 DRYWALL MATERIALS WITH ACM JOINT COMPOUND – COMPOSITE ANALYSIS

Drywall materials without applied texture containing asbestos in amounts greater than 1% in only the joint compound component of the drywall system may be subjected to “composite” analysis. This procedure as conducted by the Polarized Light Microscopy (PLM) analytical laboratory considers the percentage of the entire drywall system bulk sample that is asbestos-containing joint compound as compared to the rest of the bulk sample and, accordingly, yields a “composite” result indicating the percentage of asbestos within the entire drywall system bulk sample.

Composite analysis is only permissible for drywall systems that are non-textured and composite results yielding an asbestos content of 1% or less renders the abatement/demolition of the drywall system to a status of “OSHA” drywall. These materials may therefore be removed/demolished employing limited engineering controls and by utilizing removal methods that meet the requirements for protecting employees/personnel from airborne asbestos fibers through compliance with the exposure limits stipulated by the OSHA Construction Standard for Asbestos (29 CFR 1926.1101) regarding the disturbance and/or removal of asbestos-containing materials.

• Drywall walls – non-textured with joint compound (12) homogeneous areas)

Note: Due to the assumption that all drywall partition walls adjacent or perpendicular to exterior perimeter walls are OSHA drywall (Refer to Section 8) based upon the visual homogeneity of these materials, the approximate quantities of the following identified non-ACM, non-textured drywall walls are irrelevant but reported as approximate below.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

7.1 LOCATIONS AND QUANTIFICATION OF OSHA DRYWALL MATERIALS

Identified OSHA Drywall Description Location Approximate Quantity

Non-Textured Drywall (CDW 01) – 1 H.A. Floors 1 and 2

Exterior Perimeter Walls 15,000 Sq. Ft.

Non-Textured Drywall (CDW 06) – 1 H.A. Floor 2

Southeast Section

100 Sq. Ft.

Non-Textured Drywall (CDW 07) – 1 H.A. Floor 2

50 Sq. Ft.

Non-Textured Drywall (CDW 10) – 1 H.A. Floor 1

Suite 136 (Partial)

1,200 Sq. Ft.

Non-Textured Drywall (CDW 11) – 1 H.A. Floor 1

30 Sq. Ft.

Non-Textured Drywall (CDW 13) – 1 H.A. Floor 1

162N/162P

240 Sq. Ft.

Non-Textured Drywall (CDW 14) – 1 H.A. Floor 1

Suite 136 (Partial)

Non-Textured Drywall (CDW 15) – 1 H.A. Suites 132/133 (Partial)

1,100 Sq. Ft.

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 16) – 1 H.A. Floor 1

80 Sq. Ft.

Non-Textured Drywall (CDW 18) – 1 H.A. Floor 1

Suite 136 (Partial)

Non-Textured Drywall (CDW 19) – 1 H.A. Floor 1

Suites 132/133

1,100 Sq. Ft.

Non-Textured Drywall (CDW 22) – 1 H.A. Floor 2

Suite 236 (Partial)

1,400 Sq. Ft.

CLASSIFICATION AND PHYSICAL ASSESSMENT OF OSHA DRYWALL MATERIAL

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 01) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 06) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 07) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 10) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 11) – 1 H.A. Miscellaneous – Non-Friable Good Condition

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

Non-Textured Drywall (CDW 13) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 14) – 1 H.A. Miscellaneous – Non-Friable Good Condition Identified Non-ACM Description Classification Physical Assessment

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 15) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 16) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 18) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Identified OSHA Drywall Description Classification Physical Assessment

Non-Textured Drywall (CDW 19) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 22) – 1 H.A. Miscellaneous – Non-Friable Good Condition

7.3 COMPOSITE ANALYSIS OF OSHA DRYWALL

• Non-Textured Drywall Walls (CDW 01) – Composite Analysis = 0.23%

• Non-Textured Drywall Walls (CDW 06) – Composite Analysis = 0.74%

• Non-Textured Drywall Walls (CDW 07) – Composite Analysis = 0.18%

• Non-Textured Drywall Walls (CDW 10) – Composite Analysis = 0.06%

• Non-Textured Drywall Walls (CDW 11) – Composite Analysis = 0.19%

• Non-Textured Drywall Walls (CDW 13) – Composite Analysis = 0.12%

• Non-Textured Drywall Walls (CDW 14) – Composite Analysis = 0.27%

• Non-Textured Drywall Walls (CDW 15) – Composite Analysis = 0.16%

• Non-Textured Drywall Walls (CDW 16) – Composite Analysis = 0.10%

• Non-Textured Drywall Walls (CDW 18) – Composite Analysis = 0.06%

• Non-Textured Drywall Walls (CDW 19) – Composite Analysis = 0.13%

• Non-Textured Drywall Walls (CDW 22) – Composite Analysis = 0.20%

AURARIA HIGHER EDUCATION CENTER WEST CLASSROOM

PRE-RENOVATION BUILDING INSPECTION DECEMBER 11, 2024

8.0 CONCLUSIONS AND RECOMMENDATIONS

• The identified ACM in the form of joint compound associated with twelve (12) drywall window recesses, concrete column recesses, and partition walls attached (adjacent or perpendicular) to or in contact with window/storefront/exterior door unit frames have been subjected to composite analyses thereby rendering them non-regulated by U.S. Environmental Protection Agency (EPA) and Colorado Department of Public Health and Environment (CDPHE). However, all materials identified with less than 1% but greater than 0% asbestos content are regulated by U.S. Occupational Safety and Health Administration (OSHA) due to the potential exposure to airborne asbestos fibers upon physical disturbance, such as demolition. As such, unprotected construction/demolition personnel should not conduct physical impact-causing activities on these less than 1% but greater than 0% asbestos content materials and it is therefore recommended that these drywall components should be demolished/removed by a CDPHE-licensed GAC to facilitate the removal of the window unit frames by the GC. Any resultant generated waste materials may be disposed as general construction waste.

Note: There are a total of thirty-one (31) homogenous…