Appendix E_Central Classroom (Project A) Abatement Scope of Work Document 03-16-2026 v2.pdf
PDF 7 MB Posted
- Solicitation number
- IFB1 GMAA 2026000154 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is an Asbestos Abatement Scope of Work document prepared for the Auraria Higher Education Center (AHEC) by Environmental Technical Solutions (ETS) for the Central Classroom Building located at 1055 10th Street Mall in Denver, Colorado. The project, designated as 2026 Project B Phase II Window Abatement (Project Number E25.103), involves the removal of approximately 763 square feet of trace asbestos-containing drywall systems with friable asbestos-containing joint compound to facilitate window demolition and replacement. The work is scheduled to commence on May 16, 2026, and must be completed by June 19, 2026, with access to the building available Monday through Sunday from 6:00 a.m. to 6:00 p.m. The scope includes removal of drywall at vertical window jambs (approximately 6 inches for Type 1 windows and 4 inches for Type 2 stairwell windows), with multiple abatement crews working in five separate areas simultaneously to meet the general contractor's schedule. The project requires compliance with Colorado Department of Public Health and Environment (CDPHE) Regulation #8, OSHA 29 CFR 1926.1101 Construction Industry Asbestos Standard, and EPA 40 CFR 61 Subpart M NESHAP Standard.
The scope of work requires the General Abatement Contractor (GAC) to provide unit pricing for linear feet of window caulking removal, linear feet of window glazing removal, square feet of drywall removal, and square feet of secondary containment construction, as well as hourly rates for workers, supervisors, and project managers. The building will remain occupied during abatement activities, with designated work areas unoccupied during operations. The GAC is responsible for all regulatory notifications to the Colorado Department of Public Health and Environment, decontamination facilities construction (minimum one-chamber direct unit inside secondary containment and remote three-chamber unit), negative pressure ventilation maintenance at minimum -0.02 inches of water column with four air exchanges per hour, and asbestos waste disposal at EPA-approved landfills. All waste must be double-bagged in 6 mil polyethylene bags with appropriate OSHA warning labels, and waste load-out activities must occur prior to 8:00 a.m. Monday through Friday. ETS will provide project oversight, air monitoring specialist services, final visual inspections, and background air sampling, with sample analysis conducted using Phase Contrast Microscopy in accordance with CDPHE regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2432 S. Downing Street, Denver, Colorado 80210 ● 303.722.2973 ● Fax: 303.722.2974
ASBESTOS ABATEMENT SCOPE OF WORK
AURARIA CAMPUS CENTRAL CLASSROOM BUILDING
1055 10TH STREET MALL
DENVER, COLORADO 80204
(2026 PROJECT B PHASE II WINDOW ABATEMENT)
PREPARED FOR:
AURARIA HIGHER EDUCATION CENTER
1156 7TH AVENUE
March 16, 2026
PROJECT NUMBER E25.103
Table of Contents
1.0 BACKGROUND
2.0 SCOPE OF WORK
3.0 SPECIAL CONDITIONS
3.1 Regulatory Notification and Variances
3.2 Building Occupancy Status
3.3 Site Security
3.4 Field Changes
4.0 PROJECT DESIGN
4.1 Standards & Primacy of Rules
4.2 Site Access
4.3 Equipment Staging Areas
4.4 Utilities Service
4.5 Decontamination Facilities
4.6 Load Out Facilities
4.7 Critical Barriers
4.8 Negative Pressure Ventilation
4.9 Containment Construction
4.10 Pre-Cleaning Activities
4.11 Asbestos Removal
4.12 Waste Removal
4.13 Final Clean Criteria
4.14 Final Air Clearance Monitoring
4.15 Routine Air Monitoring
4.16 Electrical Hazards Control
4.17 Emergency Egress and Fire Protection
4.18 Respiratory Protection
4.19 Documentation Submittal
Appendix A – Window Removal Table with Drywall Removal Locations and Quantities
Appendix B – Typical Window Layout Photo Log
Appendix C – Abatement Phase Drawings
Appendix D – Clear Consulting Central Classroom Pre-Renovation Building Inspection for Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated November 26, 2024
Appendix E – ETS’ Central Classroom Building Limited Asbestos-Containing Material
Inspection Report, dated February 11, 2025, within Appendix E for details
AHEC 2026 Project B Phase II Window Abatement March 16, 2026
ETS Project No. E25.103 Page 1
1.0 Background
Between July 11, 2024, and July 25, 2024, Clear Consulting performed limited asbestos building inspection services at the Auraria Campus Central Classroom Building located at 1055 10th Street Mall, Denver, Colorado 80204. Clear Consulting identified non-friable asbestos containing materials (ACMs) that will need to be abated to facilitate the 2026 window replacement project or Project C.
Clear Consulting identified non-friable asbestos containing window glazing on storefront doors and associated windows. However, removal of storefront doors and associated windows are not part of this scope of work. Additionally, non-friable drywall systems with friable asbestos containing joint compound were identified or presumed throughout the building. Composite drywall system bulk samples had analytical composite results of less than 1% asbestos content. The friable joint compounds contained an estimated 2-3%
Chrysotile asbestos.
See Clear Consulting Central Classroom Pre-Renovation Building Inspection for Suspect
Asbestos-Containing Materials, Window Unit Replacement Project Report, dated
November 26, 2024, in Appendix D for details.
On January 31, 2025 and February 6, 2025, Environmental Technical Solutions (ETS) performed limited bulk sampling of suspect asbestos containing window caulking and glazing. Both the window caulking and glazing bulk samples collected were none detected for asbestos. See ETS’ Central Classroom Building Limited Asbestos-
Containing Material Inspection Report, dated February 11, 2025, within Appendix E for details.
ETS will provide the building owner with project oversight and asbestos Air Monitoring
Specialist (AMS) services throughout abatement activities including final visual inspection and background air sampling within each containment work area.
2.0 Asbestos Scope of Work
1. Remove approximately 763 square feet of trace asbestos containing drywall systems with friable asbestos containing joint compound to facilitate window demolition.
Drywall will be removed in a straight line using manual removal methods or a mechanical means with a dustless shroud and a HEPA vacuum attached to the shroud inlet. Following removal, a light encapsulate will be applied using a spray bottle to the drywall edges. See the window removal table with window types, drywall removal locations, and quantities in Appendix A for details.
Type 1 Window Locations: The General Abatement Contractor (GAC) shall remove approximately 6 inches of drywall at the vertical window jambs back to the interior partition wall.
Type 2 Stairwell Window Locations: The GAC shall remove approximately 4 inches of drywall at the vertical jambs.
ETS Project No. E25.103 Page 2
See the Typical Window Layout Photo Log in Appendix B for details.
The window subcontractor will have 5 separate crews working in 5 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the
General Contractor’s schedule. See the abatement phase drawings within Appendix C for details.
Unit Pricing
1. Supply unit rate to remove one linear foot of non-friable asbestos containing window caulking.
2. Supply unit rate to remove one linear foot of non-friable asbestos containing window glazing.
3. Supply unit rate to remove one square foot of non-friable trace asbestos containing drywall system.
4. Supply unit rate to construct one 5’ x 5’ secondary containment.
5. Provide Worker hourly rate.
6. Provide Supervisor hourly rate.
7. Provide Project Manager hourly rate.
3.0 Special Conditions
3.1 Regulatory Notification and Variances
The GAC will make all mandatory notifications to Federal and State entities regulating their work as required by applicable rules, regulations, and standards. This includes, but is not limited, to the National Emission Standards for Hazardous Air Pollutants
(NESHAP) notification (notice provided to the Colorado Department of Public Health and Environment (CDPHE) with permit application).
The GAC is responsible for quantifying amounts of ACM to be reported on the
CDPHE Notification Form and submitting any variances necessary to properly complete the project. If applicable, the GAC to supply an asbestos abatement project design including a drawing with the decontamination unit, load out and negative air machine locations of each work area. It is anticipated that this project will not require a CDPHE asbestos abatement permit or notification.
ETS Project No. E25.103 Page 3
3.2 Facility Occupancy Status
This building will remain occupied during the scheduled work activities. All areas designated for abatement shall be unoccupied for the duration of abatement operations.
The GAC shall maintain all work areas and equipment storage areas in a clean, orderly, and dust-free condition at all times.
3.3 Site Security
Access to the work area shall be strictly regulated. Entry to the regulated area is by permission only to authorized personnel. The perimeter of the work area shall be monitored at all times during abatement by a competent person. Only asbestos certified/licensed personnel employed by the GAC or federal and state regulatory agency personnel will be allowed access to the work area.
3.4 Field Changes
Minor modifications to the project design or scope of work by CDPHE or the Project
Designer are allowed. Minor changes include but are not limited to, relocation of decontamination facility and waste load-out.
4.0 Project Design
4.1 Standards and Primacy of Rules
The following standards will be adopted as they pertain to asbestos abatement. In any instance where adopted standards are in conflict with each other, the most stringent shall apply.
1) Colorado Department of Public Health and Environment Regulation #8
2) 29 CFR 1926.1101, the OSHA Construction Industry Asbestos Standard
3) 40 CFR 61 Subpart M, EPA’s NESHAP Asbestos Standard
4) NIOSH/OSHA/USCG/EPA –“Occupational; Safety & Health Guidance
Manual for Hazardous Waste Site Activities”, Section 8-20; Heat Stress and
Other Physiological Factors.
5) All other applicable laws, rules, and regulations, including but not limited to those relating to:
6) Workers’ Compensation Insurance;
7) Liability Insurance
8) All contract specifications and documentation
4.2 Site Access
The project is anticipated to start May 16th, 2026, and must be completed by June 19th, 2026. The GAC has access to the building for the purpose of abatement Monday through
Sunday from 6:00am to 6:00pm.
ETS Project No. E25.103 Page 4
4.3 Equipment Staging Areas
The GAC shall schedule pick-up and delivery of equipment, supplies and waste dumpsters. Waste containers should not impede the flow of pedestrian and vehicular traffic.
4.4 Utilities Service
Electrical power and water will be supplied by the building owner. The GAC to provide temporary electrical panels if needed. The GAC will also provide a licensed electrician to connect building power to temporary panels.
4.5 Decontamination Facilities
At a minimum a direct one-chamber decontamination unit is to be constructed for trace asbestos containing drywall system abatement operations inside a secondary containment.
Additionally, a remote three-chamber decontamination unit will be set up adjacent to the work areas for the duration of the project. The decontamination facility will be constructed and prepared in accordance with CDPHE Regulation 8, Part B- Asbestos.
The decontamination facility is to be maintained in a clean and orderly condition throughout the duration of the project.
4.6 Load Out Facilities
All load-out and disposal procedures shall be in accordance with CDPHE Regulation 8, Part
B- Asbestos. At a minimum each secondary containment work area will require a one-chamber waste load-out.
4.7 Critical Barriers
All penetrations of the structure will be sealed with critical barriers. All critical barriers will be constructed in accordance with CDPHE Regulation 8 Part B- Asbestos. Personnel constructing the containment or installing/removing critical barriers will be in proper personal protective equipment (PPE) such as but not limited to respirators and Tyvek suits or similar.
4.8 Negative Pressure Ventilation
Each work area will be placed under negative pressure. The negative pressure device
(NPD) is to be vented to the exterior of the building. The exterior negative pressure exhaust opening will be secured using a hard barrier if necessary. Negative pressure shall be maintained at a minimum of -0.02 inches of water column as verified by a portable monometer device and visible confirmation of negative air flow using a smoke tube device. The negative air system shall exchange the volume of air inside the containment area a minimum of four (4) times per hour.
ETS Project No. E25.103 Page 5
4.9 Containment Construction
Each secondary containment utilized for the removal of trace asbestos containing drywall systems will include at a minimum a one-chamber decontamination unit/waste load out at each entrance to the containment. Each secondary containment for the asbestos removal shall be constructed in accordance with CDPHE Regulation 8, Part B-Asbestos and
OSHA 29 CFR 1926.1101 Asbestos Construction Standard. Each containment will require a pre-abatement visual inspection prior to the start of any removal activities. The
GAC will make every attempt to minimize the number of containments utilized for this project and will combine multiple rooms into a single secondary containment when feasible.
4.10 Pre-Cleaning Activities
The GAC shall perform pre-cleaning activities according to CDPHE, Regulation 8, Part
B- Asbestos. Personnel pre-cleaning will be in proper personal protective equipment
(PPE) such as but not limited to respirators and Tyvek suits or similar.
4.11 Asbestos Removal
Following approval of work area preparations by the Environmental Consultant/Project
Designer, the GAC may begin abatement activities. ACM removal will be performed in accordance with CDPHE Regulation 8, Part B – Asbestos.
Trace asbestos containing drywall systems with friable asbestos containing joint compound at a minimum will be removed within a secondary containment which will include a one-chamber decontamination unit/waste load out. OSHA 29 CFR 1926.1101
Asbestos Construction Standard will be followed during drywall removal activities.
The window subcontractor will have 5 separate crews working in 5 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the
General Contractor’s schedule.
If non-friable asbestos containing window glazing or caulking are added to the scope of work during construction at a minimum will be removed according to CDPHE, Regulation 8, Part B- Asbestos, III.S.4 Abatement of Non-friable Asbestos Containing
Materials within a regulated work area.
The GAC will ensure that the work area is properly wetted or misted during abatement of
ACMs. The use of an airless sprayer will be used continuously to mist the work area. At the end of each shift the GAC shall ensure that all waste has been properly containerized prior to leaving the site.
ETS Project No. E25.103 Page 6
4.12 Asbestos Waste Removal
All ACM waste must be double-bagged in 6 mil polyethylene bags labeled with the appropriate OSHA warning label for asbestos and must also bear the generator label as required by EPA’s 40 CFR 61 Subpart M NESHAP Standard.
Containerizing and transport of asbestos wastes shall be in accordance with applicable regulations. It is the GAC responsibility to arrange for delivery and pickup of waste containers without impeding the flow of pedestrian and vehicular traffic.
All waste load out activities shall be performed prior to 8:00AM, Monday through
Friday. Waste load out activities performed on Saturday and Sunday may occur at any time, unless otherwise directed by the Owner or General Contractor.
The GAC will arrange for proper disposal of all waste materials at a landfill approved by the EPA to accept friable and non-friable asbestos waste. GAC employees are required to utilize protective coveralls and respirators when handling ACM waste that is double-bagged.
4.13 Final Clean/ Final Visual Inspection Criteria
All interior surfaces of the work areas will be free of visible dust and debris. Following completion of final cleaning, an encapsulant shall also be applied to any exposed edges of drywall where cuts were performed prior to final visual inspection. Each work area must pass a final visual inspection by a CDPHE certified AMS leaving only critical barriers in place.
4.14 Final Air Clearance Monitoring
Sample collection and analysis for background air monitoring within each containment work area following abatement shall be in accordance with CDPHE Regulation 8, Part B-
Asbestos and shall use Phase Contrast Microscopy (PCM).
Upon written notification that air monitoring levels are acceptable, the AMS shall authorize the GAC to remove critical barriers. Each secondary containment shall remain in place for a minimum of 6 hours following the final visual inspection and background air sampling to allow the General Contractor sufficient time to inspect and confirm that all work has been completed accurately and in accordance with the project specifications prior to dismantling the containment.
4.15 Personal Exposure Air Monitoring
The GAC shall be responsible for conducting personal exposure air monitoring as applicable in accordance with OSHA 29 CFR 1926.1101 Asbestos Construction
Standard.
ETS Project No. E25.103 Page 7
4.16 Electrical Hazards Control
All electrical power utilized during the project will be on ground fault circuit interrupters
(GFCI) whose power source is located outside the work area.
4.17 Emergency Egress, Fire Protection, and Fall Protection
A. Egress Points
1. The GAC shall develop an emergency egress plan and inform personnel of such plan.
B. Fire Protection Plan
1. No items capable of initiating or sustaining combustion (lighters, matches, torches, etc.) will be allowed in containment.
2. The use of flammable liquids is not permitted.
3. Any electricity utilized must be on Ground Fault Circuit Interrupters (GFCI).
4. A minimum of one, 2A:10B:C rated fire extinguishers will be maintained on-site. There must be available at least one 2A:10B:C rated fire extinguisher within a maximum travel distance of 50 feet from any point in the work area.
5. Workers will be trained in the use of fire extinguishers, emergency egress plans, basic fire safety, and emergency reporting procedures prior to work beginning.
6. All emergency exits will be labeled as such with tools available for breaching poly and keys in door locks where necessary.
7. The Contractor must implement an emergency action and fire prevention plan in accordance with 29 CFR 1910.38 Employee emergency plans and fire prevention plans.
C. Fall Protection Plan
1. The GAC shall comply with all applicable OSHA regulations, including but not limited to 29 CFR 1926 Subpart M – Fall Protection.
2. Fall protection shall be provided by the Contractor for all employees exposed to falls of 6 feet or greater to a lower level during stairwell abatement activities.
3. Temporary guardrail systems meeting OSHA strength and height requirements (top rail 42 inches ± 3 inches and capable of withstanding 200 pounds of force).
It is anticipated that the GAC will need scaffolding and proper fall protection for the stairwell window removal.
ETS Project No. E25.103 Page 8
4.18 Respiratory Protection
The GAC personnel shall provide proper respiratory protection with NIOSH approved HEPA filters during all pre-clean, removal and waste load out procedures.
The GAC shall provide proof of medical fitness to wear respiratory protection and current fit testing documentation for all employees.
4.19 Document Submittal
Following de-mobilization, the GAC shall provide the following submittals to the
Owner:
✓ Copies of all regulatory inspections, orders, citations, or other correspondence related to this project.
✓ Daily logs
✓ GAC certifications and worker certifications
✓ Copies of all asbestos waste shipment manifests.
Following de-mobilization, Environmental Technical Solutions, LLC shall provide the following submittals to the Owner:
✓ Copies of all required visual inspections, air and/or bulk sampling results.
Prepared by:
Mike Pozzi
Project Designer s
Appendix A – Window Removal Table with Drywall Removal Locations and Quantities
Room Window Type
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
119 Type 1 14' 10"x 7' (x2) 5
1. Remove drywall interior partition wall to window frame
119A Type 1 9' 10" x 7' (x2) 5
2. Remove 4” of drywall from the side of the window
119B Type 1 9' 10" x 7' (x2) 5 119C Type 1 9' 10" x 7' (x2) 5 119D Type 1 9' 10" x 7' (x2) 5 119E Type 1 9' 10" x 7' (x2) 5 119F Type 1 14' 10" x 7' (x2) 5 119G Type 1 9' 10" x 7' (x2) 5 119H Type 1 9' 10" x 7' (x2) 5 119J Type 1 9' 10" x 7' (x2) 5 119K Type 1 9' 10" x 7' (x2) 5 105H Type 1 9' 10" x 7' (x2) 5 105G Type 1 9' 10" x 7' (x2) 5 105F Type 1 9' 10" x 7' (x2) 5 105E Type 1 9' 10" x 7' (x2) 5 105D Type 1 18' 8" x 7' (x2) 10 C119 Type 1 5' 6" x 7' (x2) 5 105C Type 1 14' 10" x 7' (x2) 5 103 Type 1 24' 10"x 7' (x2) 5 101 Type 1 44' 8"x 7' (x4) 10 106N Type 1 4' 10" x 3' 11" (x2) 5 106M Type 1 14' 10" x 3' 11" (x2) 5 106L Type 1 9' 10" x 3' 11" (x2) 5 106K Type 1 9' 10" x 3' 11" (x2) 5 106J Type 1 9' 10" x 3' 11" (x2) 5 106H Type 1 9' 10" x 3' 11" (x2) 5 106G Type 1 9' 10" x 3' 11" (x2) 5
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
106F Type 1 9' 10" x 3' 11" (x2) 5
1. Remove drywall interior partition wall to window frame
106E Type 1 9' 10" x 3' 11" (x2) 5
2. Remove 4” of drywall from the side of the window
106D Type 1 9' 10" x 3' 11" (x2) 5 106C Type 1 9' 10" x 3' 11" (x2) 5 116A Type 1 14'5"x 3' 11" (x2) 5 116 Type 1 33' x 3' 11" (x2) 5 120T Type 1 9'10" x 7' (x2) 5 120S Type 1 9'10" x 7' (x2) 5 120R Type 1 9'10" x 7' (x2) 5 120Q Type 1 9'10" x 7' (x2) 5 120P Type 1 9'10" x 7' (x2) 5 120N Type 1 19' 10"x 3' 11" (x2) 5 120M Type 1 9' 10"x 3' 11" (x2) 5 120L Type 1 9' 10"x 3' 11" (x2) 5 120K Type 1 9' 10"x 3' 11" (x2) 5 120J Type 1 9' 10"x 3' 11" (x2) 5 120H Type 1 9' 10"x 3' 11" (x2) 5 120G Type 1 9' 10"x 3' 11" (x2) 5 120F Type 1 20' 8" 3' 11" (x2) 10 120E Type 1 9' 10"x 3' 11" (x2) 5 222 Type 1 N 23'3" x 3' 11"-W 24' 3"x 3' 11" 10
223 Type 1 9' 9"x 3'11" (x2) 5
Old drawings not matching current layout. New area is a small office suite
224 Type 1 9' 9"x 3'11" (x2) 5 202E Type 1 9' 7"x 3' 11" (x2) 5
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
S200A Type 1 & Type 2
T3 (14' 5"x7'). T2 (4' 8"x 3' 11") 12
Two different window types, north window type 2 and west window type 3
1. Remove drywall interior partition wall to window frame
201Y Type 1 4' 9" x 3' 11" (x2) 5
2. Remove 4” of drywall from the side of the window
201X Type 1 9' 8"x 3' 11" (x2) 5 201W Type 1 24' x 3' 11" (x2) 10 201V Type 1 24' x 3' 11" (x2) 10 201U Type 1 9' 7" x 3' 11" (x2) 5 201T Type 1 9' 7" x 3' 11" (x2) 5 201S Type 1 9' 7" x 3' 11" (x2) 5 201R Type 1 9' 7" x 3' 11" (x2) 5 201Q Type 1 9' 7" x 3' 11" (x2) 5 201P Type 1 9' 7" x 3' 11" (x2) 5 201N Type 1 9' 7" x 3' 11" (x2) 5 201M Type 1 9' 7" x 3' 11" (x2) 5 201L Type 1 9' 7" x 3' 11" (x2) 5 201K Type 1 9' 7" x 3' 11" (x2) 5 201J Type 1 9' 7" x 3' 11" (x2) 5 204 Type 1 24' 7" x 3' 11" (x2) 5 206D Type 1 9' 7" x 3' 11" (x2) 5 206C Type 1 9' 7" x 3' 11" (x2) 5 211U Type 1 14' 5" x 3' 11" (x2) 5 211T Type 1 9' 7" x 3' 11" (x2) 5 211S Type 1 9' 7" x 3' 11" (x2) 5 211R Type 1 9' 7" x 3' 11" (x2) 5 211Q Type 1 9' 7" x 3' 11" (x2) 5 211P Type 1 9' 7" x 3' 11" (x2) 5 211N Type 1 9' 7" x 3' 11" (x2) 5
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
211M Type 1 9' 7" x 3' 11" (x2) 5
1. Remove drywall interior partition wall to window frame
211L Type 1 9' 7" x 3' 11" (x2) 5
2. Remove 4” of drywall from the side of the window
211K Type 1 9' 7" x 3' 11" (x2) 5 211J Type 1 9' 7" x 3' 11" (x2) 5 211H Type 1 9' 7" x 3' 11" (x2) 5 211G Type 1 18' 8" x 3' 11" (x2) 10 211F Type 1 14' 5" x 3' 11" (x2) 5 211C Type 1 14' 5" x 3' 11" (x2) 5 211B Type 1 29' 2" x 3' 11" (x2) 10 211A Type 1 12' 1"X 3' 11" (x2) 5 211 Type 1 22' 4"x 3' 11" (x2) 5 212 Type 1 19' 5"x 3' 11" (x2) 5 S200B Type 2 14' 5" x 7' (x2) 8 213 Type 1 19' 7" 3' 11" (x2) 5 217 Type 1 24'4" x 3' 11" (x2) 5 218 Type 1 27'7" x 3'11" (x2) 5 301 Type 1 69' 3" x 3' 11" (x2) 15 303A Type 1 29' 11" x 3'11" (x2) 5 303B Type 1 9' 10" x 3' 11" (x2) 5 303C Type 1 9' 10" x 3' 11" (x2) 5 303D Type 1 9' 10" x 3' 11" (x2) 5 303E Type 1 9' 10" x 3' 11" (x2) 5 303F Type 1 9' 10" x 3' 11" (x2) 5 303G Type 1 9' 10" x 3' 11" (x2) 5 303H Type 1 14'x 3' 11" (x2) 5 307H Type 1 9' 10" x 3' 11" (X2) 5 307G Type 1 14'x 3' 11" (x2) 5
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
307F Type 1 9' 10" x 3' 11" (x2) 5
1. Remove drywall interior partition wall to window frame
307E Type 1 9' 10" x 3' 11" (x2) 5
2. Remove 4” of drywall from the side of the window
307D Type 1 9' 10" x 3' 11" (x2) 5 307C Type 1 9' 10" x 3' 11" (x2) 5 307B Type 1 14' 10" x 3' 11" (x2) 5 309 Type 1 24' 10" 3' 11" (x2) 5 311A Type 1 9' 7" x 3' 11" (x2) 5 311B Type 1 9' 7" x 3' 11" (x2) 5 311C Type 1 9' 7" x 3' 11" (x2) 5 311D Type 1 9' 7" x 3' 11" (x2) 5 311E Type 1 9' 7" x 3' 11" (x2) 5 311E1 Type 1 14' 10"x 3' 11" (x2) 5 311F Type 1 44' 5"x 3' 11" (x2) 10 311G Type 1 7' 3"x 3' 11" (x2) 5 311H Type 1 7' 2"x 3' 11" (x2) 5 313 Type 1 19' 7" x 3' 11" (x2) 5 315D Type 1 14' 7" x 3' 11" (x2) 5 315C Type 1 14' 7" x 3' 11" (x2) 5 315B Type 1 14' 7" x 3' 11" (x2) 5 S300B Type 2 14' 9" x 7' (x2) 8 312 Type 1 12'5"x3'11" (2) 5 314A Type 1 9'7"x3'11" (2) 5 314B Type 1 9'7"x3'11" (2) 5 314C Type 1 9'7"x3'11" (2) 5 314D Type 1 15'10"x3'11" (2) 5 308A Type 1 39' 11"x 3' 11" (x2) 5 306 Type 1 19' 10" x 3' 11 (x2) 5
Window Dimensions Drywall Quantity Removed SF
Additional Notes Window Types
304K Type 1 14' 10"x 3' 11 (x2) 5
1. Remove drywall interior partition wall to window frame
304J Type 1 9' 10" x 3' 11" (x2) 5
2. Remove 4” of drywall from the side of the window
304H Type 1 9' 10" x 3' 11" (x2) 5 304G Type 1 9' 10" x 3' 11" (x2) 5 304F Type 1 10'10"x 3'11" (x2) 5 304E Type 1 14' 10" X 3' 11" (x2) 5 304D Type 1 14' 10" X 3' 11" (x2) 5 304C Type 1 14' 10" X 3' 11" (x2) 5
Total Removal (SF) 763
Appendix B – Typical Window Layout Photo Log
TYPICAL WINDOW PHOTO LOG
AHEC Central Classroom Building, 1055 10th Street Mall, Denver, CO 80204
Type 1 – Remove drywall interior partition wall to window frame
Type 2 – Remove 4” of drywall from the side of the window
Appendix C – Abatement Phase Drawings
51 SF
106S1
651 SF
C120
309 SF
C105
861 SF
C119
173 SF
110 SF110 SF
110 SF110 SF110 SF166 SF109 SF110 SF
109 SF109 SF
66 SF
115 SF 115 SF
144 SF
119 SF 132 SF 119 SF 348 SF
989 SF
719 SF
1735 SF
921 SF
714 SF
212 SF
112 SF
111 SF
111 SF
108 SF
185 SF102 SF99 SF103 SF102 SF
102 SF
248 SF
117 SF102 SF
64 SF
695 SF
265 SF
424 SF
289 SF
111 SF
123 SF
78 SF
178 SF
111 SF
251 SF
107 SF
810 SF
C106
72 SF
90 SF
96 SF
697 SF
781 SF
176 SF
108 SF
108 SF
172 SF
110 SF
109 SF
109 SF
110 SF
109 SF
48 SF
71 SF
155 SF
491 SF
243 SF
126 SF
126 SF
46 SF
735 SF
354 SF
235 SF
881 SF
120W
P100G
P100F
R100A
R100B
C100B
S100B
V100C
P100H
E100B
C100A
L100A
V100A
S100A
E100A
P100C
P100B
P100A
119119A119B119C119D119E119F119G119H119J119K
119M
119N 119P 119Q 119R 119S 119T 119U
118A
120U
120V
120X
120Y 120Z
120A 120B 120C 120D 120E 120F
120G
120H
120J
120K
120L
120M
120N
120P120Q120R120S120T
V100B
P100R
112A
116A
106B
106A
P100E
106W
106V
106S
106U106T
106P
106R
106Q
106C106D106E106F106G106H106J106K106L
106M
106N
2276 SF
461 SF
70 SF
59 SF
110 SF
168 SF
139 SF
91 SF
109 SF
110 SF
109 SF
145 SF
17 SF
109 SF
110 SF
109 SF
109 SF
143 SF
76 SF
66 SF
422 SF
508 SF
1074 SF
84 SF
436 SF
350 SF
109 SF
95 SF
116B
91 SF
116C
85 SF
116D
100 SF
116E
140 SF
C116
110 SF131 SF
194 SF 141 SF 104 SF
105E105D
105C 105B 105A
109 SF
105G
109 SF
105F
110 SF
105H
Abatement Phasing
2026 AHEC Central Classroom Window Project
Central Classroom 1055 10th Street, Denver, Colorado 80204
Figure 1-1
2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net
Date: 03/03/2026 1st floor
5/
/2
5/
/2
5/16/26 - 5/18/26
5/
/2
5/
/2
5/22/26 - 5/27/265/28/26 - 6/2/266/3/26 - 6/9/26
5/19/26 - 5/26/26
6/10/26 - 6/12/26
6/
/2
6/
/2
5/27/26 - 6/2/26
6/ 3/
/5
/2
GAC Crew 1
GAC Crew 2
5/16/26 - 5/18/26
67 SF
201Z
92 SF
64 SF
202E 202D
206F
58 SF
206E
54 SF
C206A
31 SF
206B
62 SF
190 SF
206D
206C
206A
C206
135 SF
74 SF
121 SF
209 SF
864 SF
C211
95 SF
152 SF
93 SF
331 SF
93 SF
139 SF
64 SF
1042 SF
521 SF
221 SF
222 SF
261 SF
294 SF
158 SF
264 SF
88 SF
88 SF
92 SF
162 SF
243 SF
202 SF
109 SF
150 SF
562 SF
93 SF
94 SF93 SF
93 SF
94 SF93 SF
93 SF
94 SF
93 SF
128 SF
98 SF
98 SF
169 SF
151 SF
581 SF
C201
24 SF
122 SF
106 SF
94 SF
133 SF
110 SF
108 SF109 SF
110 SF
109 SF109 SF124 SF
127 SF
86 SF
188 SF
211Y
211X
211W
211B
211A
211DD
211C
211F
211E
211D
211CC
211BB
211Z 211AA
211G
211H
211J
211K211L211M211N211P211Q211R211S211T211U
211V
220L
220K220J
220M
220H
220E
P200B
220B
201H
201B 201C 201D
201E
201F
201G
201J201K201L201M201N201P201Q201R201S201T201U201V
201W 201X 201Y
201A
E200A
ADA
ADA
ADA
109 SF
110 SF
109 SF109 SF
133 SF
137 SF
173 SF
166 SF
72 SF
139 SF
513 SF
77 SF
14 SF
381 SF
2086 SF
43 SF
303 SF
238 SF
291 SF
520 SF
443 SF
579 SF
2220 SF
24 SF
453 SF
71 SF
82 SF
371 SF
365 SF
736 SF
840 SF
417 SF
547 SF
947 SF
312 SF
311 SF
386 SF
72 SF
57 SF
432 SF
60 SF
76 SF
22 SF
736 SF
P200E1
P200E
E200B
C200B
C200D
C200A
S200A
S200B
P200F
R200B
R200A
P200D
P200C
P200A
C200C
202F
202C
202B
202A
CLASSROOM
WEST
TO
142 SF
220F
98 SF
220G
189 SF
220A
242 SF
220C
274 SF
220D
Figure 1-2
Date: 03/03/2026 2nd floor
2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net
Abatement Phasing
2026 AHEC Central Classroom Window Project
Central Classroom 1055 10th Street, Denver, Colorado 80204
5/
/2
5/
/2
5/19/26 - 5/26/265/27/26 - 6/1/266/2/26 - 6/8/26
6/
/2
6/
/2
6/16/26 - 6/19/26
5/
/2
5/
/2
Fall Protection Plan Required
5/22/26 - 5/27/265/28/26 - 6/2/26
5/
/2
6/
2/
6/3/26 - 6/5/26 5/16/26 - 5/18/26
Fall Protection Plan Required
6/9/26 - 6/15/26
GAC Crew 3
GAC Crew 4
5/16/26 - 5/18/26
134 SF
311E1
118 SF
s i n k
69 SF
315A
8 SF
P300F
431 SF
C311
386 SF
C304
394 SF
C303
122 SF
424 SF
122 SF
235 SF
138 SF
375 SF
178 SF
178 SF
178 SF
123 SF
498 SF
16 SF
485 SF
123 SF
564 SF
164 SF
110 SF110 SF
110 SF110 SF
219 SF
772 SF
26 SF
168 SF108 SF109 SF
110 SF107 SF122 SF
108 SF
103 SF
109 SF
137 SF
315 SF
311G
311F
311E311D311C311B311A
311K
311J
311H
315D
315C
315B
315E
314A
314B
314C
314E
314D
304A 304B
304C
304D 304E 304F 304G
304L
304H 304J
304K
396 SF
173 SF
110 SF
463 SF
200 SF
55 SF
256 SF 171 SF 275 SF
181 SF
80 SF
141 SF
357 SF
ADA
ADA
ADA
6 SF
P300B
710 SF
19 SF
308B
308A
39 SF
51 SF52 SF
628 SF
109 SF
1968 SF
124 SF109 SF
125 SF
125 SF 122 SF
116 SF
123 SF
167 SF
123 SF 124 SF
124 SF
122 SF
125 SF
349 SF
124 SF
125 SF
124 SF
106 SF
204 SF
30 SF
54 SF
514 SF
532 SF
223 SF
124 SF
69 SF
R300A
P300D
P300C
307P
C300A
C300B
S300B
S300A
E300B
E300A
R300D
R300C
R300B
307N 307M
307F 307E
307D 307C
307B
C307
307A
303J303K 303L
303E
303F 303G
303H
307H 307G
307L307K 307J
303A 303D 303C
303B
303M303
P300E
738 SF
Figure 1-3
Date: 03/03/2026 3rd floor
2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net 5/26/26 - 6/2/26
Abatement Phasing
2026 AHEC Central Classroom Window Project
Central Classroom 1055 10th Street, Denver, Colorado 80204
5/
/2
5/
/2
5/16/26 - 5/18/265/19/26 - 5/22/266/3/26 - 6/10/26
6/ 3/
/1
0/
5/
/2
5/
/2
5/
/2
5/
/2
6/8/26 - 6/12/26
5/16/26 - 5/18/26
GAC Crew 5
GAC Crew 6Fall Protection Plan Required
5/
/2
6/
3/
Appendix D – Clear Consulting Central Classroom Pre-Renovation Building Inspection for
Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated
November 26, 2024
PRE-RENOVATION BUILDING INSPECTION
FOR
SUSPECT ASBESTOS-CONTAINING MATERIALS
WINDOW UNIT REPLACEMENTS PROJECT
CENTRAL CLASSROOM
AURARIA CAMPUS
1055 10TH STREET MALL
Prepared for:
Auraria Higher Education Center Facilities Services
1156 7th Street Denver, Colorado 80217
Prepared by:
Clear Consulting, LLC 37159 Pheasant Run
Elizabeth, Colorado 80107
November 26, 2024
TABLE OF CONTENTS
SECTION PAGE
1.0 Project Scope of Work 1
2.0 Project Personnel 3
3.0 Regulatory Review – Asbestos-Containing Materials 4
4.0 Identified Asbestos-Containing Materials 4
5.0 Identified Non-Asbestos-Containing Materials 5
6.0 Identified Materials Containing “Trace” Amounts of Asbestos 11
7.0 Drywall Materials with ACM Joint Compound – Composite Analysis 12
8.0 Conclusions and Recommendations 17
9.0 Building Inspector Attestation and Signature 18
EXHIBIT A:
Suspect Asbestos-Containing Materials – Bulk Sample Log
EXHIBIT B:
Building Floor Plans
• Floor Plan No. 1: Floor 1
Approximate Bulk Sample Locations
• Floor Plan No. 2: Floor 2
• Floor Plan No. 3: Floor 3
• Floor Plan No. 4: Floor 1 Areas/Locations of Identified ACM
• Floor Plan No. 5: Floor 2
• Floor Plan No. 6: Floor 3
EXHIBIT C:
Analytical Laboratory Reports - Polarized Light Microscopy
EXHIBIT D: Consulting Firm and Personnel Certifications
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
1.0 PROJECT SCOPE OF WORK
Pre-renovation inspections of the Central Classroom Building (CN-1025) located on the Auraria Higher Education Center (AHEC) campus were conducted from Thursday, July 11, 2024 through Thursday, July 25, 2024 by Clear Consulting, LLC for suspect asbestos-containing materials (ACM) that will potentially be impacted by the scheduled replacement of window units located on Floors 1, 2, and 3 and storefront/exterior door units located on Floor 1. The purpose of the inspections was to locate and sample suspect materials associated with the specific areas of the building to be impacted in order to compile an inventory of identified ACMs.
The inspection was conducted for Auraria Higher Education Center (AHEC) and the building is located on the AHEC Campus at 1055 10th Street Mall in Denver, Colorado.
1.1 INSPECTION FOR SUSPECT ASBESTOS-CONTAINING MATERIALS (ACM)
During the inspection conducted by Clear Consulting, LLC, the following suspect ACMs were identified by homogeneous areas of presence for the collection of bulk samples:
• Drywall walls – non-textured with joint compound (50 homogeneous areas)
• Storefront/door unit glazing sealant material (1 homogeneous area)
• Interior window stool adhesive (1 homogeneous area)
For the identification of ACM, a sampling scheme was utilized that employed the selection of sample locations for suspect materials on a random basis and the quantity of samples collected were in compliance with the requirements of the U.S. Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, Subpart E, as required by Colorado Air Quality Control Commission (AQCC), Regulation No. 8 for the inspection of school and commercial buildings.
Each bulk sample collected has an identification number that begins with the following acronym sequence:
• CN-1025-
This acronym sequence is followed by the room/area number identifying the location of the sample collection.
This room/area number is followed by another acronym describing each suspect material, followed by a sequential homogeneous area number (if applicable), and last by a sequential individual sample number.
• CDW = non-textured drywall with joint compound
• EDG = storefront/door unit glazing sealant
• WSA = interior window stool adhesive
The fifty (50) homogeneous areas of non-textured drywall with joint compound (CDW) located throughout the exterior perimeter walls and associated with window/storefront/exterior door unit locations on Floors 1, 2, and 3 of the building were separated and identified as follows:
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
• CDW 01: Floor 3 – Exterior perimeter drywall walls – pink/tan drywall with white/off-white compound
• CDW 02: Floor 3 – 303C/303D - north drywall partition wall – pink/tan drywall with white compound
• CDW 03: Floor 3 – 311D/311G – drywall partition walls – grey/tan drywall with white compound
• CDW 04: Floor 3 – 311F – east drywall partition wall – grey/tan drywall with white compound
• CDW 05: Floor 3 – 315C/315D - drywall partition wall – grey/tan drywall with white compound
• CDW 06: Floor 3 – 312/314A - drywall partition wall – grey/white/tan drywall with white caulk
• CDW 07: Floor 3 – 304K/306 - drywall partition wall – grey/tan drywall with off-white compound
• CDW 08: Floor 3 – 306 – south drywall partition wall – grey/tan drywall with white compound
• CDW 09: Floor 3 – 304D/304F – drywall infill at column – white/grey/tan drywall with white compound
• CDW 10: Floor 3 – 309/311A – drywall partition wall – grey/pink/tan drywall with white compound
• CDW 11: Floor 3 – 304E/304F – drywall infill at column – grey/tan drywall with white compound
• CDW 12: Floor 3 – 304D/304H - drywall infill at column – white/tan drywall with white compound
• CDW 13: Floor 3 – 306 - drywall infill at column – grey/white/tan drywall with white compound
• CDW 14: Floor 3 – 314A/314D - drywall infill at column – grey/tan drywall with white compound
• CDW 15: Floor 3 – 314D/S300B - drywall infill at column – white/tan drywall with white compound
• CDW 16: Floor 3 – 315B/315D - drywall infill at column – white/grey/tan drywall with white compound
• CDW 17: Floor 3 – 313 - drywall infill at column – white/grey/tan drywall with white compound
• CDW 18: Floor 3 – 311F - drywall infill at column - white/tan drywall with white/off-white compound
• CDW 19: Floor 3 – 311A/311E - drywall infill at column – white/grey/tan drywall with white compound
• CDW 20: Floor 3 – 307D/307H - drywall infill at column – white/tan drywall with white compound
• CDW 21: Floor 3 – 303A/303H - drywall partition wall – white/pink/tan drywall with white compound
• CDW 22: Floor 3 – 301 - drywall partition wall – white/pink/tan drywall with white compound
• CDW 23: Floor 2 – Exterior perimeter drywall walls - white/pink/tan drywall with white compound
• CDW 24: Floor 2 – 202D/222 - drywall infill at column – pink/tan drywall with white compound
• CDW 25: Floor 2 – 201L/201V - drywall infill at column – pink/tan/white drywall with white compound
• CDW 26: Floor 2 – 211G/211R - drywall infill at column – pink/tan/white drywall with white compound
• CDW 27: Floor 2 – 221B/211F – drywall partition walls - pink/tan drywall with white compound
• CDW 28: Floor 2 – 217/S200B - drywall infill at column – pink/tan drywall with white compound
• CDW 29: Floor 2 – 201K/201P – drywall partition walls - white/tan drywall with white compound
• CDW 30: Floor 2 – 206C/206D - drywall partition walls - pink/tan drywall with white compound
• CDW 31: Floor 2 – 211G/211T - drywall partition walls - pink/tan drywall with white compound
• CDW 32: Floor 2 – 213/218 - drywall infill at column – pink/tan drywall with white compound
• CDW 33: Floor 2 – 222/S200A - drywall infill at column – pink/tan drywall with white compound
• CDW 34: Floor 2 – 223/224 - drywall infill at column – grey/tan drywall with white compound
• CDW 35: Floor 1 – Exterior perimeter drywall walls - pink/tan drywall with off-white compound
• CDW 36: Floor 1 – 105E/105G - drywall infill at column – pink/tan drywall with white compound
• CDW 37: Floor 1 – 120H/120N - drywall partition walls – white/pink/tan drywall with white compound
• CDW 38: Floor 1 – 106D/106F - drywall partition walls – white/tan drywall with white compound
• CDW 39: Floor 1 – 119D/119J - drywall partition walls – white/tan drywall with white compound
• CDW 40: Floor 1 – 105E - drywall partition walls – white/tan drywall with white compound
• CDW 41: Floor 1 – 116 – north drywall partition wall – white/tan drywall with white compound
• CDW 42: Floor 1 – 106J/106L - drywall partition walls – white/tan/pink drywall with white compound
• CDW 43: Floor 1 – 120K/120S - drywall partition walls – pink/white/tan drywall with white compound
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
• CDW 44: Floor 1 – 119D/119E - drywall partition walls – white/tan drywall with white compound
• CDW 45: Floor 1 – 106E/106J – drywall infill at window - pink/white/tan drywall with white compound
• CDW 46: Floor 1 – 120K/120R - drywall infill at column - pink/tan drywall with white compound
• CDW 47: Floor 1 - 119D/119J - drywall infill at column - grey/tan drywall with white compound
• CDW 48: Floor 1 – 120D - drywall infill at window - grey/tan drywall with white compound
• CDW 49: Floor 1 – 116A - drywall infill at window - pink/tan/purple drywall with white compound
• CDW 50: Floor 1 – 106L/106M - drywall infill at window - pink/tan/grey drywall with white compound
The one (1) homogeneous area of exterior storefront/door unit frame glazing sealant (EDG) located between the glass panes and fixed stops of storefront and exterior doors was identified as follows:
• EDG 01: Floor 1 - V100A/V100B – north and east storefront units – black resinous glazing sealant
The one (1) homogeneous area of interior window stool adhesive (WSA) located under metal window stool covers was identified as follows:
• WSA 01: Floor 1 – 311E1/315C – window stool cover adhesive – grey/brown resinous material
Bulk samples of the suspect materials encountered were collected and each sample was assigned a unique identification number. Bulk samples were collected by an EPA/State of Colorado certified building inspector.
All samples were submitted to Eurofins Reservoirs Environmental, Inc. (ERE), a third-party independent laboratory. ERE is accredited through the National Voluntary Laboratory Accreditation Program (NVLAP) as required by USEPA. Bulk samples were analyzed by Polarized Light Microscopy (PLM) in general compliance with guidelines established by 40 CFR 763, Subpart E. Asbestos concentrations were visually estimated and/or point counted and reported by percent for each layer of the sample.
The specific information regarding the identified ACM is presented in Section 4.0 of this report.
2.0 PROJECT PERSONNEL
The following representatives of Clear Consulting, LLC, certified as Building Inspectors as required by Colorado Department of Public Health and Environment (CDPHE), Air Pollution Control Division (APCD), conducted the building inspections for suspect ACMs at the Central Classroom Building:
Clear Consulting, LLC: ACF No. 14902
Name of Building Inspector: H. Kim Thiel
State of Colorado Certification No.: 668
Name of Building Inspector: Frank Hulce
State of Colorado Certification No.: 1849
Name of Building Inspector: Jayson Windle
State of Colorado Certification No.: 4266
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
3.0 REGULATORY REVIEW – ASBESTOS-CONTAINING MATERIALS
USEPA and Colorado Department of Public Health and Environment (CDPHE) regulate all building materials that contain greater than 1% asbestos as determined by polarized light microscopy (PLM) analysis. The Occupational Health and Safety Administration (OSHA) regulates any building materials containing greater than 1% asbestos as well as smaller amounts of asbestos (“trace” amounts of 1% or less but greater than 0%) that may result in an airborne asbestos exposure due to physical disturbance.
USEPA and CDPHE Regulation No. 8, Part B, requires that suspect ACM in buildings built prior to 1988 be assumed to be asbestos-containing or an inspection be conducted by an EPA-accredited/CDPHE-certified asbestos building inspector. CDPHE, Regulation No. 8, Part B, requires an asbestos inspection in compliance with the AHERA protocol be conducted prior to demolition or renovation activities that could disturb ACM.
The USEPA and CDPHE require all friable ACMs be removed prior to renovation or demolition and any non-friable ACMs that may be rendered friable by those same activities.
In some circumstances, “point count” analysis is required for bulk samples previously identified by PLM. Point counting is a more detailed method of analysis than standard PLM. Federal and state agencies define ACM as materials containing greater than 1% asbestos. The NESHAP regulation requires that if standard PLM analysis determines that a sample contains less than 10% asbestos, the material must be considered asbestos-containing or be point counted.
CDPHE Regulation No. 8 (Section III.A.1.c.) requires that if the asbestos content of a sample of friable asbestos is estimated to be 1% asbestos or less, but greater than 0%, by a method other than point counting, the determination shall be repeated using the point counting technique with PLM and if the result obtained is different from the PLM result, the point count result must be used.
4.0 IDENTIFIED ASBESTOS-CONTAINING MATERIALS
• Storefront/door unit glazing sealant material (1 homogeneous area)
4.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED ASBESTOS-CONTAINING MATERIALS
The following summary itemizes the locations of the identified ACM.
Identified ACM Description Location Approximate Quantity
Storefront Glazing Sealant (EDG 01) – 1 H.A. Floor 1
V100A/V100B Exterior Storefront Units
100 Ln. Ft.
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
5.0 IDENTIFIED NON-ASBESTOS-CONTAINING MATERIALS
The following suspect materials were sampled, analyzed, and identified as non-asbestos-containing materials:
• Drywall walls – non-textured with joint compound (28 homogeneous areas)
• Interior window stool adhesive (1 homogeneous area)
5.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED NON-ASBESTOS CONTAINING MATERIALS
The following samples of suspect material were collected during the current inspection and were identified as non-ACM:
Note: Due to the assumption that all drywall partition walls adjacent or perpendicular to exterior perimeter walls, drywall infills at columns, and drywall infills at window units are OSHA drywall (Refer to Section 8) based upon the visual homogeneity of these materials, the approximate quantities of the following identified non-ACM, non-textured drywall walls are irrelevant but reported as approximate below.
Identified Non-ACM Description Location Approximate Quantity
Non-Textured Drywall (CDW 02) – 1 H.A. Floor 3
303C/303D Partition Wall
240 Sq. Ft.
Non-Textured Drywall (CDW 03) – 1 H.A. Floor 3
Suite 311 Partition Walls
700 Sq. Ft.
Non-Textured Drywall (CDW 04) – 1 H.A. Floor 3
311F
600 Sq. Ft.
Non-Textured Drywall (CDW 05) – 1 H.A. Floor 3
315C/315D
Non-Textured Drywall (CDW 06) – 1 H.A. Floor 3
312/314A
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
Non-Textured Drywall (CDW 07) – 1 H.A. Floor 3
304K/306
Non-Textured Drywall (CDW 08) – 1 H.A. Floor 3
South Partition Wall
Non-Textured Drywall (CDW 09) – 1 H.A. Floor 3
Suite 304 Drywall Column Infills
50 Sq. Ft.
Non-Textured Drywall (CDW 11) – 1 H.A. Floor 3
Suite 304
30 Sq. Ft.
Non-Textured Drywall (CDW 12) – 1 H.A. Floor 3
Suite 304
30 Sq. Ft.
Non-Textured Drywall (CDW 13) – 1 H.A. Floor 3
Drywall Window Recesses
40 Sq. Ft.
Non-Textured Drywall (CDW 14) – 1 H.A. Floor 3
Suite 314
80 Sq. Ft.
Non-Textured Drywall (CDW 16) – 1 H.A. Floor 3
Suite 315
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
Non-Textured Drywall (CDW 17) – 1 H.A. Floor 3
Non-Textured Drywall (CDW 18) – 1 H.A. Floor 3
311F
20 Sq. Ft.
Non-Textured Drywall (CDW 19) – 1 H.A. Floor 3
Suite 311
160 Sq. Ft.
Non-Textured Drywall (CDW 20) – 1 H.A. Floor 3
Suite 307
130 Sq. Ft.
Non-Textured Drywall (CDW 29) – 1 H.A. Floor 2
Suite 201
220 Sq. Ft.
Non-Textured Drywall (CDW 34) – 1 H.A. Floor 2
223/224
Non-Textured Drywall (CDW 37) – 1 H.A. Floor 1
Suite 120 (Partial) Drywall Partition Walls
1,500 Sq. Ft.
Non-Textured Drywall (CDW 38) – 1 H.A. Floor 1
Suite 106 (Partial)
1,000 Sq. Ft.
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
Non-Textured Drywall (CDW 39) – 1 H.A. Floor 1
Suite 119 (Partial)
1,200 Sq. Ft.
Non-Textured Drywall (CDW 40) – 1 H.A. Floor 1
105E Drywall Partition Wall
Non-Textured Drywall (CDW 41) – 1 H.A. Floor 1
Non-Textured Drywall (CDW 47) – 1 H.A. Floor 1
Suite 119
Non-Textured Drywall (CDW 48) – 1 H.A. Floor 1
120D
Non-Textured Drywall (CDW 49) – 1 H.A. Floor 1
116A North Partition Wall
Non-Textured Drywall (CDW 50) – 1 H.A. Floor 1
106L/M/N
480 Sq. Ft.
Window Stool Adhesive (WSA 01) – 1 H.A. Floors 1/2/3
Window Stool Metal Caps Unknown
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
5.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF NON-ACM
Identified Non-ACM Description Classification Physical Assessment
Non-Textured Drywall (CDW 02) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 03) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 04) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 05) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 06) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 07) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 08) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 09) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 11) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 12) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 13) – 1 H.A. Miscellaneous – Non-Friable Good Condition
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
Non-Textured Drywall (CDW 14) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 16) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 17) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 18) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 19) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 20) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 29) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 34) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 37) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 38) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 39) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 40) – 1 H.A. Miscellaneous – Non-Friable Good Condition
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
Non-Textured Drywall (CDW 41) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 47) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 48) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 49) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Non-Textured Drywall (CDW 50) – 1 H.A. Miscellaneous – Non-Friable Good Condition
Window Stool Adhesive (WSA 01) – 1 H.A. Miscellaneous – Non-Friable Good Condition
6.0 IDENTIFIED MATERIALS CONTAINING “TRACE” AMOUNTS OF ASBESTOS
Suspect materials can yield results indicating “trace” amounts of asbestos (1% or less but greater than 0%).
These materials are not regulated as ACM but require removal methods to comply with the exposure limits stipulated by the OSHA Construction Standard for Asbestos (29 CFR 1926.1101) with regard to their disturbance and/or removal:
• No encountered suspect materials sampled were identified with “trace” amounts of asbestos.
6.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED “TRACE” MATERIALS
6.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF “TRACE” MATERIALS
6.3 POINT COUNT ANALYSES OF “TRACE” MATERIALS
AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM
PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024
7.0 DRYWALL MATERIALS WITH ACM JOINT COMPOUND – COMPOSITE ANALYSIS
Drywall materials without applied texture containing asbestos in amounts greater than 1% in only the joint compound component of the drywall system may be subjected to “composite” analysis. This procedure as conducted by the Polarized Light Microscopy (PLM) analytical laboratory considers the percentage of the entire drywall system bulk sample that is asbestos-containing joint compound as compared to the rest of the bulk sample and, accordingly, yields a “composite” result indicating the percentage of asbestos within the entire drywall system bulk sample.
Composite analysis is only permissible for drywall systems that are non-textured and composite results yielding an asbestos content of 1% or less renders the abatement/demolition of the drywall system to a status of “OSHA” drywall.