This is an Asbestos Abatement Scope of Work document prepared for the Auraria Higher Education Center (AHEC) by Environmental Technical Solutions (ETS) for the Central Classroom Building located at 1055 10th Street Mall in Denver, Colorado. The project, designated as 2026 Project B Phase II Window Abatement (Project Number E25.103), involves the removal of approximately 763 square feet of trace asbestos-containing drywall systems with friable asbestos-containing joint compound to facilitate window demolition and replacement. The work is scheduled to commence on May 16, 2026, and must be completed by June 19, 2026, with access to the building available Monday through Sunday from 6:00 a.m. to 6:00 p.m. The scope includes removal of drywall at vertical window jambs (approximately 6 inches for Type 1 windows and 4 inches for Type 2 stairwell windows), with multiple abatement crews working in five separate areas simultaneously to meet the general contractor's schedule. The project requires compliance with Colorado Department of Public Health and Environment (CDPHE) Regulation #8, OSHA 29 CFR 1926.1101 Construction Industry Asbestos Standard, and EPA 40 CFR 61 Subpart M NESHAP Standard.

The scope of work requires the General Abatement Contractor (GAC) to provide unit pricing for linear feet of window caulking removal, linear feet of window glazing removal, square feet of drywall removal, and square feet of secondary containment construction, as well as hourly rates for workers, supervisors, and project managers. The building will remain occupied during abatement activities, with designated work areas unoccupied during operations. The GAC is responsible for all regulatory notifications to the Colorado Department of Public Health and Environment, decontamination facilities construction (minimum one-chamber direct unit inside secondary containment and remote three-chamber unit), negative pressure ventilation maintenance at minimum -0.02 inches of water column with four air exchanges per hour, and asbestos waste disposal at EPA-approved landfills. All waste must be double-bagged in 6 mil polyethylene bags with appropriate OSHA warning labels, and waste load-out activities must occur prior to 8:00 a.m. Monday through Friday. ETS will provide project oversight, air monitoring specialist services, final visual inspections, and background air sampling, with sample analysis conducted using Phase Contrast Microscopy in accordance with CDPHE regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2432 S. Downing Street, Denver, Colorado 80210 ● 303.722.2973 ● Fax: 303.722.2974

ASBESTOS ABATEMENT SCOPE OF WORK

AURARIA CAMPUS CENTRAL CLASSROOM BUILDING

1055 10TH STREET MALL

DENVER, COLORADO 80204

(2026 PROJECT B PHASE II WINDOW ABATEMENT)

PREPARED FOR:

AURARIA HIGHER EDUCATION CENTER

1156 7TH AVENUE

March 16, 2026

PROJECT NUMBER E25.103

Table of Contents

1.0 BACKGROUND

2.0 SCOPE OF WORK

3.0 SPECIAL CONDITIONS

3.1 Regulatory Notification and Variances

3.2 Building Occupancy Status

3.3 Site Security

3.4 Field Changes

4.0 PROJECT DESIGN

4.1 Standards & Primacy of Rules

4.2 Site Access

4.3 Equipment Staging Areas

4.4 Utilities Service

4.5 Decontamination Facilities

4.6 Load Out Facilities

4.7 Critical Barriers

4.8 Negative Pressure Ventilation

4.9 Containment Construction

4.10 Pre-Cleaning Activities

4.11 Asbestos Removal

4.12 Waste Removal

4.13 Final Clean Criteria

4.14 Final Air Clearance Monitoring

4.15 Routine Air Monitoring

4.16 Electrical Hazards Control

4.17 Emergency Egress and Fire Protection

4.18 Respiratory Protection

4.19 Documentation Submittal

Appendix A – Window Removal Table with Drywall Removal Locations and Quantities

Appendix B – Typical Window Layout Photo Log

Appendix C – Abatement Phase Drawings

Appendix D – Clear Consulting Central Classroom Pre-Renovation Building Inspection for Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated November 26, 2024

Appendix E – ETS’ Central Classroom Building Limited Asbestos-Containing Material

Inspection Report, dated February 11, 2025, within Appendix E for details

AHEC 2026 Project B Phase II Window Abatement March 16, 2026

ETS Project No. E25.103 Page 1

1.0 Background

Between July 11, 2024, and July 25, 2024, Clear Consulting performed limited asbestos building inspection services at the Auraria Campus Central Classroom Building located at 1055 10th Street Mall, Denver, Colorado 80204. Clear Consulting identified non-friable asbestos containing materials (ACMs) that will need to be abated to facilitate the 2026 window replacement project or Project C.

Clear Consulting identified non-friable asbestos containing window glazing on storefront doors and associated windows. However, removal of storefront doors and associated windows are not part of this scope of work. Additionally, non-friable drywall systems with friable asbestos containing joint compound were identified or presumed throughout the building. Composite drywall system bulk samples had analytical composite results of less than 1% asbestos content. The friable joint compounds contained an estimated 2-3%

Chrysotile asbestos.

See Clear Consulting Central Classroom Pre-Renovation Building Inspection for Suspect

Asbestos-Containing Materials, Window Unit Replacement Project Report, dated

November 26, 2024, in Appendix D for details.

On January 31, 2025 and February 6, 2025, Environmental Technical Solutions (ETS) performed limited bulk sampling of suspect asbestos containing window caulking and glazing. Both the window caulking and glazing bulk samples collected were none detected for asbestos. See ETS’ Central Classroom Building Limited Asbestos-

Containing Material Inspection Report, dated February 11, 2025, within Appendix E for details.

ETS will provide the building owner with project oversight and asbestos Air Monitoring

Specialist (AMS) services throughout abatement activities including final visual inspection and background air sampling within each containment work area.

2.0 Asbestos Scope of Work

1. Remove approximately 763 square feet of trace asbestos containing drywall systems with friable asbestos containing joint compound to facilitate window demolition.

Drywall will be removed in a straight line using manual removal methods or a mechanical means with a dustless shroud and a HEPA vacuum attached to the shroud inlet. Following removal, a light encapsulate will be applied using a spray bottle to the drywall edges. See the window removal table with window types, drywall removal locations, and quantities in Appendix A for details.

Type 1 Window Locations: The General Abatement Contractor (GAC) shall remove approximately 6 inches of drywall at the vertical window jambs back to the interior partition wall.

Type 2 Stairwell Window Locations: The GAC shall remove approximately 4 inches of drywall at the vertical jambs.

ETS Project No. E25.103 Page 2

See the Typical Window Layout Photo Log in Appendix B for details.

The window subcontractor will have 5 separate crews working in 5 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the

General Contractor’s schedule. See the abatement phase drawings within Appendix C for details.

Unit Pricing

1. Supply unit rate to remove one linear foot of non-friable asbestos containing window caulking.

2. Supply unit rate to remove one linear foot of non-friable asbestos containing window glazing.

3. Supply unit rate to remove one square foot of non-friable trace asbestos containing drywall system.

4. Supply unit rate to construct one 5’ x 5’ secondary containment.

5. Provide Worker hourly rate.

6. Provide Supervisor hourly rate.

7. Provide Project Manager hourly rate.

3.0 Special Conditions

3.1 Regulatory Notification and Variances

The GAC will make all mandatory notifications to Federal and State entities regulating their work as required by applicable rules, regulations, and standards. This includes, but is not limited, to the National Emission Standards for Hazardous Air Pollutants

(NESHAP) notification (notice provided to the Colorado Department of Public Health and Environment (CDPHE) with permit application).

The GAC is responsible for quantifying amounts of ACM to be reported on the

CDPHE Notification Form and submitting any variances necessary to properly complete the project. If applicable, the GAC to supply an asbestos abatement project design including a drawing with the decontamination unit, load out and negative air machine locations of each work area. It is anticipated that this project will not require a CDPHE asbestos abatement permit or notification.

ETS Project No. E25.103 Page 3

3.2 Facility Occupancy Status

This building will remain occupied during the scheduled work activities. All areas designated for abatement shall be unoccupied for the duration of abatement operations.

The GAC shall maintain all work areas and equipment storage areas in a clean, orderly, and dust-free condition at all times.

3.3 Site Security

Access to the work area shall be strictly regulated. Entry to the regulated area is by permission only to authorized personnel. The perimeter of the work area shall be monitored at all times during abatement by a competent person. Only asbestos certified/licensed personnel employed by the GAC or federal and state regulatory agency personnel will be allowed access to the work area.

3.4 Field Changes

Minor modifications to the project design or scope of work by CDPHE or the Project

Designer are allowed. Minor changes include but are not limited to, relocation of decontamination facility and waste load-out.

4.0 Project Design

4.1 Standards and Primacy of Rules

The following standards will be adopted as they pertain to asbestos abatement. In any instance where adopted standards are in conflict with each other, the most stringent shall apply.

1) Colorado Department of Public Health and Environment Regulation #8

2) 29 CFR 1926.1101, the OSHA Construction Industry Asbestos Standard

3) 40 CFR 61 Subpart M, EPA’s NESHAP Asbestos Standard

4) NIOSH/OSHA/USCG/EPA –“Occupational; Safety & Health Guidance

Manual for Hazardous Waste Site Activities”, Section 8-20; Heat Stress and

Other Physiological Factors.

5) All other applicable laws, rules, and regulations, including but not limited to those relating to:

6) Workers’ Compensation Insurance;

7) Liability Insurance

8) All contract specifications and documentation

4.2 Site Access

The project is anticipated to start May 16th, 2026, and must be completed by June 19th, 2026. The GAC has access to the building for the purpose of abatement Monday through

Sunday from 6:00am to 6:00pm.

ETS Project No. E25.103 Page 4

4.3 Equipment Staging Areas

The GAC shall schedule pick-up and delivery of equipment, supplies and waste dumpsters. Waste containers should not impede the flow of pedestrian and vehicular traffic.

4.4 Utilities Service

Electrical power and water will be supplied by the building owner. The GAC to provide temporary electrical panels if needed. The GAC will also provide a licensed electrician to connect building power to temporary panels.

4.5 Decontamination Facilities

At a minimum a direct one-chamber decontamination unit is to be constructed for trace asbestos containing drywall system abatement operations inside a secondary containment.

Additionally, a remote three-chamber decontamination unit will be set up adjacent to the work areas for the duration of the project. The decontamination facility will be constructed and prepared in accordance with CDPHE Regulation 8, Part B- Asbestos.

The decontamination facility is to be maintained in a clean and orderly condition throughout the duration of the project.

4.6 Load Out Facilities

All load-out and disposal procedures shall be in accordance with CDPHE Regulation 8, Part

B- Asbestos. At a minimum each secondary containment work area will require a one-chamber waste load-out.

4.7 Critical Barriers

All penetrations of the structure will be sealed with critical barriers. All critical barriers will be constructed in accordance with CDPHE Regulation 8 Part B- Asbestos. Personnel constructing the containment or installing/removing critical barriers will be in proper personal protective equipment (PPE) such as but not limited to respirators and Tyvek suits or similar.

4.8 Negative Pressure Ventilation

Each work area will be placed under negative pressure. The negative pressure device

(NPD) is to be vented to the exterior of the building. The exterior negative pressure exhaust opening will be secured using a hard barrier if necessary. Negative pressure shall be maintained at a minimum of -0.02 inches of water column as verified by a portable monometer device and visible confirmation of negative air flow using a smoke tube device. The negative air system shall exchange the volume of air inside the containment area a minimum of four (4) times per hour.

ETS Project No. E25.103 Page 5

4.9 Containment Construction

Each secondary containment utilized for the removal of trace asbestos containing drywall systems will include at a minimum a one-chamber decontamination unit/waste load out at each entrance to the containment. Each secondary containment for the asbestos removal shall be constructed in accordance with CDPHE Regulation 8, Part B-Asbestos and

OSHA 29 CFR 1926.1101 Asbestos Construction Standard. Each containment will require a pre-abatement visual inspection prior to the start of any removal activities. The

GAC will make every attempt to minimize the number of containments utilized for this project and will combine multiple rooms into a single secondary containment when feasible.

4.10 Pre-Cleaning Activities

The GAC shall perform pre-cleaning activities according to CDPHE, Regulation 8, Part

B- Asbestos. Personnel pre-cleaning will be in proper personal protective equipment

(PPE) such as but not limited to respirators and Tyvek suits or similar.

4.11 Asbestos Removal

Following approval of work area preparations by the Environmental Consultant/Project

Designer, the GAC may begin abatement activities. ACM removal will be performed in accordance with CDPHE Regulation 8, Part B – Asbestos.

Trace asbestos containing drywall systems with friable asbestos containing joint compound at a minimum will be removed within a secondary containment which will include a one-chamber decontamination unit/waste load out. OSHA 29 CFR 1926.1101

Asbestos Construction Standard will be followed during drywall removal activities.

The window subcontractor will have 5 separate crews working in 5 different areas of the building at one time. Therefore, multiple abatement crews will be needed to meet the

General Contractor’s schedule.

If non-friable asbestos containing window glazing or caulking are added to the scope of work during construction at a minimum will be removed according to CDPHE, Regulation 8, Part B- Asbestos, III.S.4 Abatement of Non-friable Asbestos Containing

Materials within a regulated work area.

The GAC will ensure that the work area is properly wetted or misted during abatement of

ACMs. The use of an airless sprayer will be used continuously to mist the work area. At the end of each shift the GAC shall ensure that all waste has been properly containerized prior to leaving the site.

ETS Project No. E25.103 Page 6

4.12 Asbestos Waste Removal

All ACM waste must be double-bagged in 6 mil polyethylene bags labeled with the appropriate OSHA warning label for asbestos and must also bear the generator label as required by EPA’s 40 CFR 61 Subpart M NESHAP Standard.

Containerizing and transport of asbestos wastes shall be in accordance with applicable regulations. It is the GAC responsibility to arrange for delivery and pickup of waste containers without impeding the flow of pedestrian and vehicular traffic.

All waste load out activities shall be performed prior to 8:00AM, Monday through

Friday. Waste load out activities performed on Saturday and Sunday may occur at any time, unless otherwise directed by the Owner or General Contractor.

The GAC will arrange for proper disposal of all waste materials at a landfill approved by the EPA to accept friable and non-friable asbestos waste. GAC employees are required to utilize protective coveralls and respirators when handling ACM waste that is double-bagged.

4.13 Final Clean/ Final Visual Inspection Criteria

All interior surfaces of the work areas will be free of visible dust and debris. Following completion of final cleaning, an encapsulant shall also be applied to any exposed edges of drywall where cuts were performed prior to final visual inspection. Each work area must pass a final visual inspection by a CDPHE certified AMS leaving only critical barriers in place.

4.14 Final Air Clearance Monitoring

Sample collection and analysis for background air monitoring within each containment work area following abatement shall be in accordance with CDPHE Regulation 8, Part B-

Asbestos and shall use Phase Contrast Microscopy (PCM).

Upon written notification that air monitoring levels are acceptable, the AMS shall authorize the GAC to remove critical barriers. Each secondary containment shall remain in place for a minimum of 6 hours following the final visual inspection and background air sampling to allow the General Contractor sufficient time to inspect and confirm that all work has been completed accurately and in accordance with the project specifications prior to dismantling the containment.

4.15 Personal Exposure Air Monitoring

The GAC shall be responsible for conducting personal exposure air monitoring as applicable in accordance with OSHA 29 CFR 1926.1101 Asbestos Construction

Standard.

ETS Project No. E25.103 Page 7

4.16 Electrical Hazards Control

All electrical power utilized during the project will be on ground fault circuit interrupters

(GFCI) whose power source is located outside the work area.

4.17 Emergency Egress, Fire Protection, and Fall Protection

A. Egress Points

1. The GAC shall develop an emergency egress plan and inform personnel of such plan.

B. Fire Protection Plan

1. No items capable of initiating or sustaining combustion (lighters, matches, torches, etc.) will be allowed in containment.

2. The use of flammable liquids is not permitted.

3. Any electricity utilized must be on Ground Fault Circuit Interrupters (GFCI).

4. A minimum of one, 2A:10B:C rated fire extinguishers will be maintained on-site. There must be available at least one 2A:10B:C rated fire extinguisher within a maximum travel distance of 50 feet from any point in the work area.

5. Workers will be trained in the use of fire extinguishers, emergency egress plans, basic fire safety, and emergency reporting procedures prior to work beginning.

6. All emergency exits will be labeled as such with tools available for breaching poly and keys in door locks where necessary.

7. The Contractor must implement an emergency action and fire prevention plan in accordance with 29 CFR 1910.38 Employee emergency plans and fire prevention plans.

C. Fall Protection Plan

1. The GAC shall comply with all applicable OSHA regulations, including but not limited to 29 CFR 1926 Subpart M – Fall Protection.

2. Fall protection shall be provided by the Contractor for all employees exposed to falls of 6 feet or greater to a lower level during stairwell abatement activities.

3. Temporary guardrail systems meeting OSHA strength and height requirements (top rail 42 inches ± 3 inches and capable of withstanding 200 pounds of force).

It is anticipated that the GAC will need scaffolding and proper fall protection for the stairwell window removal.

ETS Project No. E25.103 Page 8

4.18 Respiratory Protection

The GAC personnel shall provide proper respiratory protection with NIOSH approved HEPA filters during all pre-clean, removal and waste load out procedures.

The GAC shall provide proof of medical fitness to wear respiratory protection and current fit testing documentation for all employees.

4.19 Document Submittal

Following de-mobilization, the GAC shall provide the following submittals to the

Owner:

✓ Copies of all regulatory inspections, orders, citations, or other correspondence related to this project.

✓ Daily logs

✓ GAC certifications and worker certifications

✓ Copies of all asbestos waste shipment manifests.

Following de-mobilization, Environmental Technical Solutions, LLC shall provide the following submittals to the Owner:

✓ Copies of all required visual inspections, air and/or bulk sampling results.

Prepared by:

Mike Pozzi

Project Designer s

Appendix A – Window Removal Table with Drywall Removal Locations and Quantities

Room Window Type

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

119 Type 1 14' 10"x 7' (x2) 5

1. Remove drywall interior partition wall to window frame

119A Type 1 9' 10" x 7' (x2) 5

2. Remove 4” of drywall from the side of the window

119B Type 1 9' 10" x 7' (x2) 5 119C Type 1 9' 10" x 7' (x2) 5 119D Type 1 9' 10" x 7' (x2) 5 119E Type 1 9' 10" x 7' (x2) 5 119F Type 1 14' 10" x 7' (x2) 5 119G Type 1 9' 10" x 7' (x2) 5 119H Type 1 9' 10" x 7' (x2) 5 119J Type 1 9' 10" x 7' (x2) 5 119K Type 1 9' 10" x 7' (x2) 5 105H Type 1 9' 10" x 7' (x2) 5 105G Type 1 9' 10" x 7' (x2) 5 105F Type 1 9' 10" x 7' (x2) 5 105E Type 1 9' 10" x 7' (x2) 5 105D Type 1 18' 8" x 7' (x2) 10 C119 Type 1 5' 6" x 7' (x2) 5 105C Type 1 14' 10" x 7' (x2) 5 103 Type 1 24' 10"x 7' (x2) 5 101 Type 1 44' 8"x 7' (x4) 10 106N Type 1 4' 10" x 3' 11" (x2) 5 106M Type 1 14' 10" x 3' 11" (x2) 5 106L Type 1 9' 10" x 3' 11" (x2) 5 106K Type 1 9' 10" x 3' 11" (x2) 5 106J Type 1 9' 10" x 3' 11" (x2) 5 106H Type 1 9' 10" x 3' 11" (x2) 5 106G Type 1 9' 10" x 3' 11" (x2) 5

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

106F Type 1 9' 10" x 3' 11" (x2) 5

1. Remove drywall interior partition wall to window frame

106E Type 1 9' 10" x 3' 11" (x2) 5

2. Remove 4” of drywall from the side of the window

106D Type 1 9' 10" x 3' 11" (x2) 5 106C Type 1 9' 10" x 3' 11" (x2) 5 116A Type 1 14'5"x 3' 11" (x2) 5 116 Type 1 33' x 3' 11" (x2) 5 120T Type 1 9'10" x 7' (x2) 5 120S Type 1 9'10" x 7' (x2) 5 120R Type 1 9'10" x 7' (x2) 5 120Q Type 1 9'10" x 7' (x2) 5 120P Type 1 9'10" x 7' (x2) 5 120N Type 1 19' 10"x 3' 11" (x2) 5 120M Type 1 9' 10"x 3' 11" (x2) 5 120L Type 1 9' 10"x 3' 11" (x2) 5 120K Type 1 9' 10"x 3' 11" (x2) 5 120J Type 1 9' 10"x 3' 11" (x2) 5 120H Type 1 9' 10"x 3' 11" (x2) 5 120G Type 1 9' 10"x 3' 11" (x2) 5 120F Type 1 20' 8" 3' 11" (x2) 10 120E Type 1 9' 10"x 3' 11" (x2) 5 222 Type 1 N 23'3" x 3' 11"-W 24' 3"x 3' 11" 10

223 Type 1 9' 9"x 3'11" (x2) 5

Old drawings not matching current layout. New area is a small office suite

224 Type 1 9' 9"x 3'11" (x2) 5 202E Type 1 9' 7"x 3' 11" (x2) 5

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

S200A Type 1 & Type 2

T3 (14' 5"x7'). T2 (4' 8"x 3' 11") 12

Two different window types, north window type 2 and west window type 3

1. Remove drywall interior partition wall to window frame

201Y Type 1 4' 9" x 3' 11" (x2) 5

2. Remove 4” of drywall from the side of the window

201X Type 1 9' 8"x 3' 11" (x2) 5 201W Type 1 24' x 3' 11" (x2) 10 201V Type 1 24' x 3' 11" (x2) 10 201U Type 1 9' 7" x 3' 11" (x2) 5 201T Type 1 9' 7" x 3' 11" (x2) 5 201S Type 1 9' 7" x 3' 11" (x2) 5 201R Type 1 9' 7" x 3' 11" (x2) 5 201Q Type 1 9' 7" x 3' 11" (x2) 5 201P Type 1 9' 7" x 3' 11" (x2) 5 201N Type 1 9' 7" x 3' 11" (x2) 5 201M Type 1 9' 7" x 3' 11" (x2) 5 201L Type 1 9' 7" x 3' 11" (x2) 5 201K Type 1 9' 7" x 3' 11" (x2) 5 201J Type 1 9' 7" x 3' 11" (x2) 5 204 Type 1 24' 7" x 3' 11" (x2) 5 206D Type 1 9' 7" x 3' 11" (x2) 5 206C Type 1 9' 7" x 3' 11" (x2) 5 211U Type 1 14' 5" x 3' 11" (x2) 5 211T Type 1 9' 7" x 3' 11" (x2) 5 211S Type 1 9' 7" x 3' 11" (x2) 5 211R Type 1 9' 7" x 3' 11" (x2) 5 211Q Type 1 9' 7" x 3' 11" (x2) 5 211P Type 1 9' 7" x 3' 11" (x2) 5 211N Type 1 9' 7" x 3' 11" (x2) 5

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

211M Type 1 9' 7" x 3' 11" (x2) 5

1. Remove drywall interior partition wall to window frame

211L Type 1 9' 7" x 3' 11" (x2) 5

2. Remove 4” of drywall from the side of the window

211K Type 1 9' 7" x 3' 11" (x2) 5 211J Type 1 9' 7" x 3' 11" (x2) 5 211H Type 1 9' 7" x 3' 11" (x2) 5 211G Type 1 18' 8" x 3' 11" (x2) 10 211F Type 1 14' 5" x 3' 11" (x2) 5 211C Type 1 14' 5" x 3' 11" (x2) 5 211B Type 1 29' 2" x 3' 11" (x2) 10 211A Type 1 12' 1"X 3' 11" (x2) 5 211 Type 1 22' 4"x 3' 11" (x2) 5 212 Type 1 19' 5"x 3' 11" (x2) 5 S200B Type 2 14' 5" x 7' (x2) 8 213 Type 1 19' 7" 3' 11" (x2) 5 217 Type 1 24'4" x 3' 11" (x2) 5 218 Type 1 27'7" x 3'11" (x2) 5 301 Type 1 69' 3" x 3' 11" (x2) 15 303A Type 1 29' 11" x 3'11" (x2) 5 303B Type 1 9' 10" x 3' 11" (x2) 5 303C Type 1 9' 10" x 3' 11" (x2) 5 303D Type 1 9' 10" x 3' 11" (x2) 5 303E Type 1 9' 10" x 3' 11" (x2) 5 303F Type 1 9' 10" x 3' 11" (x2) 5 303G Type 1 9' 10" x 3' 11" (x2) 5 303H Type 1 14'x 3' 11" (x2) 5 307H Type 1 9' 10" x 3' 11" (X2) 5 307G Type 1 14'x 3' 11" (x2) 5

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

307F Type 1 9' 10" x 3' 11" (x2) 5

1. Remove drywall interior partition wall to window frame

307E Type 1 9' 10" x 3' 11" (x2) 5

2. Remove 4” of drywall from the side of the window

307D Type 1 9' 10" x 3' 11" (x2) 5 307C Type 1 9' 10" x 3' 11" (x2) 5 307B Type 1 14' 10" x 3' 11" (x2) 5 309 Type 1 24' 10" 3' 11" (x2) 5 311A Type 1 9' 7" x 3' 11" (x2) 5 311B Type 1 9' 7" x 3' 11" (x2) 5 311C Type 1 9' 7" x 3' 11" (x2) 5 311D Type 1 9' 7" x 3' 11" (x2) 5 311E Type 1 9' 7" x 3' 11" (x2) 5 311E1 Type 1 14' 10"x 3' 11" (x2) 5 311F Type 1 44' 5"x 3' 11" (x2) 10 311G Type 1 7' 3"x 3' 11" (x2) 5 311H Type 1 7' 2"x 3' 11" (x2) 5 313 Type 1 19' 7" x 3' 11" (x2) 5 315D Type 1 14' 7" x 3' 11" (x2) 5 315C Type 1 14' 7" x 3' 11" (x2) 5 315B Type 1 14' 7" x 3' 11" (x2) 5 S300B Type 2 14' 9" x 7' (x2) 8 312 Type 1 12'5"x3'11" (2) 5 314A Type 1 9'7"x3'11" (2) 5 314B Type 1 9'7"x3'11" (2) 5 314C Type 1 9'7"x3'11" (2) 5 314D Type 1 15'10"x3'11" (2) 5 308A Type 1 39' 11"x 3' 11" (x2) 5 306 Type 1 19' 10" x 3' 11 (x2) 5

Window Dimensions Drywall Quantity Removed SF

Additional Notes Window Types

304K Type 1 14' 10"x 3' 11 (x2) 5

1. Remove drywall interior partition wall to window frame

304J Type 1 9' 10" x 3' 11" (x2) 5

2. Remove 4” of drywall from the side of the window

304H Type 1 9' 10" x 3' 11" (x2) 5 304G Type 1 9' 10" x 3' 11" (x2) 5 304F Type 1 10'10"x 3'11" (x2) 5 304E Type 1 14' 10" X 3' 11" (x2) 5 304D Type 1 14' 10" X 3' 11" (x2) 5 304C Type 1 14' 10" X 3' 11" (x2) 5

Total Removal (SF) 763

Appendix B – Typical Window Layout Photo Log

TYPICAL WINDOW PHOTO LOG

AHEC Central Classroom Building, 1055 10th Street Mall, Denver, CO 80204

Type 1 – Remove drywall interior partition wall to window frame

Type 2 – Remove 4” of drywall from the side of the window

Appendix C – Abatement Phase Drawings

51 SF

106S1

651 SF

C120

309 SF

C105

861 SF

C119

173 SF

110 SF110 SF

110 SF110 SF110 SF166 SF109 SF110 SF

109 SF109 SF

66 SF

115 SF 115 SF

144 SF

119 SF 132 SF 119 SF 348 SF

989 SF

719 SF

1735 SF

921 SF

714 SF

212 SF

112 SF

111 SF

111 SF

108 SF

185 SF102 SF99 SF103 SF102 SF

102 SF

248 SF

117 SF102 SF

64 SF

695 SF

265 SF

424 SF

289 SF

111 SF

123 SF

78 SF

178 SF

111 SF

251 SF

107 SF

810 SF

C106

72 SF

90 SF

96 SF

697 SF

781 SF

176 SF

108 SF

108 SF

172 SF

110 SF

109 SF

109 SF

110 SF

109 SF

48 SF

71 SF

155 SF

491 SF

243 SF

126 SF

126 SF

46 SF

735 SF

354 SF

235 SF

881 SF

120W

P100G

P100F

R100A

R100B

C100B

S100B

V100C

P100H

E100B

C100A

L100A

V100A

S100A

E100A

P100C

P100B

P100A

119119A119B119C119D119E119F119G119H119J119K

119M

119N 119P 119Q 119R 119S 119T 119U

118A

120U

120V

120X

120Y 120Z

120A 120B 120C 120D 120E 120F

120G

120H

120J

120K

120L

120M

120N

120P120Q120R120S120T

V100B

P100R

112A

116A

106B

106A

P100E

106W

106V

106S

106U106T

106P

106R

106Q

106C106D106E106F106G106H106J106K106L

106M

106N

2276 SF

461 SF

70 SF

59 SF

110 SF

168 SF

139 SF

91 SF

109 SF

110 SF

109 SF

145 SF

17 SF

109 SF

110 SF

109 SF

109 SF

143 SF

76 SF

66 SF

422 SF

508 SF

1074 SF

84 SF

436 SF

350 SF

109 SF

95 SF

116B

91 SF

116C

85 SF

116D

100 SF

116E

140 SF

C116

110 SF131 SF

194 SF 141 SF 104 SF

105E105D

105C 105B 105A

109 SF

105G

109 SF

105F

110 SF

105H

Abatement Phasing

2026 AHEC Central Classroom Window Project

Central Classroom 1055 10th Street, Denver, Colorado 80204

Figure 1-1

2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net

Date: 03/03/2026 1st floor

5/

/2

5/

/2

5/16/26 - 5/18/26

5/

/2

5/

/2

5/22/26 - 5/27/265/28/26 - 6/2/266/3/26 - 6/9/26

5/19/26 - 5/26/26

6/10/26 - 6/12/26

6/

/2

6/

/2

5/27/26 - 6/2/26

6/ 3/

/5

/2

GAC Crew 1

GAC Crew 2

5/16/26 - 5/18/26

67 SF

201Z

92 SF

64 SF

202E 202D

206F

58 SF

206E

54 SF

C206A

31 SF

206B

62 SF

190 SF

206D

206C

206A

C206

135 SF

74 SF

121 SF

209 SF

864 SF

C211

95 SF

152 SF

93 SF

331 SF

93 SF

139 SF

64 SF

1042 SF

521 SF

221 SF

222 SF

261 SF

294 SF

158 SF

264 SF

88 SF

88 SF

92 SF

162 SF

243 SF

202 SF

109 SF

150 SF

562 SF

93 SF

94 SF93 SF

93 SF

94 SF93 SF

93 SF

94 SF

93 SF

128 SF

98 SF

98 SF

169 SF

151 SF

581 SF

C201

24 SF

122 SF

106 SF

94 SF

133 SF

110 SF

108 SF109 SF

110 SF

109 SF109 SF124 SF

127 SF

86 SF

188 SF

211Y

211X

211W

211B

211A

211DD

211C

211F

211E

211D

211CC

211BB

211Z 211AA

211G

211H

211J

211K211L211M211N211P211Q211R211S211T211U

211V

220L

220K220J

220M

220H

220E

P200B

220B

201H

201B 201C 201D

201E

201F

201G

201J201K201L201M201N201P201Q201R201S201T201U201V

201W 201X 201Y

201A

E200A

ADA

ADA

ADA

109 SF

110 SF

109 SF109 SF

133 SF

137 SF

173 SF

166 SF

72 SF

139 SF

513 SF

77 SF

14 SF

381 SF

2086 SF

43 SF

303 SF

238 SF

291 SF

520 SF

443 SF

579 SF

2220 SF

24 SF

453 SF

71 SF

82 SF

371 SF

365 SF

736 SF

840 SF

417 SF

547 SF

947 SF

312 SF

311 SF

386 SF

72 SF

57 SF

432 SF

60 SF

76 SF

22 SF

736 SF

P200E1

P200E

E200B

C200B

C200D

C200A

S200A

S200B

P200F

R200B

R200A

P200D

P200C

P200A

C200C

202F

202C

202B

202A

CLASSROOM

WEST

TO

142 SF

220F

98 SF

220G

189 SF

220A

242 SF

220C

274 SF

220D

Figure 1-2

Date: 03/03/2026 2nd floor

2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net

Abatement Phasing

2026 AHEC Central Classroom Window Project

Central Classroom 1055 10th Street, Denver, Colorado 80204

5/

/2

5/

/2

5/19/26 - 5/26/265/27/26 - 6/1/266/2/26 - 6/8/26

6/

/2

6/

/2

6/16/26 - 6/19/26

5/

/2

5/

/2

Fall Protection Plan Required

5/22/26 - 5/27/265/28/26 - 6/2/26

5/

/2

6/

2/

6/3/26 - 6/5/26 5/16/26 - 5/18/26

Fall Protection Plan Required

6/9/26 - 6/15/26

GAC Crew 3

GAC Crew 4

5/16/26 - 5/18/26

134 SF

311E1

118 SF

s i n k

69 SF

315A

8 SF

P300F

431 SF

C311

386 SF

C304

394 SF

C303

122 SF

424 SF

122 SF

235 SF

138 SF

375 SF

178 SF

178 SF

178 SF

123 SF

498 SF

16 SF

485 SF

123 SF

564 SF

164 SF

110 SF110 SF

110 SF110 SF

219 SF

772 SF

26 SF

168 SF108 SF109 SF

110 SF107 SF122 SF

108 SF

103 SF

109 SF

137 SF

315 SF

311G

311F

311E311D311C311B311A

311K

311J

311H

315D

315C

315B

315E

314A

314B

314C

314E

314D

304A 304B

304C

304D 304E 304F 304G

304L

304H 304J

304K

396 SF

173 SF

110 SF

463 SF

200 SF

55 SF

256 SF 171 SF 275 SF

181 SF

80 SF

141 SF

357 SF

ADA

ADA

ADA

6 SF

P300B

710 SF

19 SF

308B

308A

39 SF

51 SF52 SF

628 SF

109 SF

1968 SF

124 SF109 SF

125 SF

125 SF 122 SF

116 SF

123 SF

167 SF

123 SF 124 SF

124 SF

122 SF

125 SF

349 SF

124 SF

125 SF

124 SF

106 SF

204 SF

30 SF

54 SF

514 SF

532 SF

223 SF

124 SF

69 SF

R300A

P300D

P300C

307P

C300A

C300B

S300B

S300A

E300B

E300A

R300D

R300C

R300B

307N 307M

307F 307E

307D 307C

307B

C307

307A

303J303K 303L

303E

303F 303G

303H

307H 307G

307L307K 307J

303A 303D 303C

303B

303M303

P300E

738 SF

Figure 1-3

Date: 03/03/2026 3rd floor

2432 S. Downing Street Denver, CO 80210 303.722.2973 ets-us.net 5/26/26 - 6/2/26

Abatement Phasing

2026 AHEC Central Classroom Window Project

Central Classroom 1055 10th Street, Denver, Colorado 80204

5/

/2

5/

/2

5/16/26 - 5/18/265/19/26 - 5/22/266/3/26 - 6/10/26

6/ 3/

/1

0/

5/

/2

5/

/2

5/

/2

5/

/2

6/8/26 - 6/12/26

5/16/26 - 5/18/26

GAC Crew 5

GAC Crew 6Fall Protection Plan Required

5/

/2

6/

3/

Appendix D – Clear Consulting Central Classroom Pre-Renovation Building Inspection for

Suspect Asbestos-Containing Materials, Window Unit Replacement Project Report, Dated

November 26, 2024

PRE-RENOVATION BUILDING INSPECTION

FOR

SUSPECT ASBESTOS-CONTAINING MATERIALS

WINDOW UNIT REPLACEMENTS PROJECT

CENTRAL CLASSROOM

AURARIA CAMPUS

1055 10TH STREET MALL

Prepared for:

Auraria Higher Education Center Facilities Services

1156 7th Street Denver, Colorado 80217

Prepared by:

Clear Consulting, LLC 37159 Pheasant Run

Elizabeth, Colorado 80107

November 26, 2024

TABLE OF CONTENTS

SECTION PAGE

1.0 Project Scope of Work 1

2.0 Project Personnel 3

3.0 Regulatory Review – Asbestos-Containing Materials 4

4.0 Identified Asbestos-Containing Materials 4

5.0 Identified Non-Asbestos-Containing Materials 5

6.0 Identified Materials Containing “Trace” Amounts of Asbestos 11

7.0 Drywall Materials with ACM Joint Compound – Composite Analysis 12

8.0 Conclusions and Recommendations 17

9.0 Building Inspector Attestation and Signature 18

EXHIBIT A:

Suspect Asbestos-Containing Materials – Bulk Sample Log

EXHIBIT B:

Building Floor Plans

• Floor Plan No. 1: Floor 1

Approximate Bulk Sample Locations

• Floor Plan No. 2: Floor 2

• Floor Plan No. 3: Floor 3

• Floor Plan No. 4: Floor 1 Areas/Locations of Identified ACM

• Floor Plan No. 5: Floor 2

• Floor Plan No. 6: Floor 3

EXHIBIT C:

Analytical Laboratory Reports - Polarized Light Microscopy

EXHIBIT D: Consulting Firm and Personnel Certifications

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

1.0 PROJECT SCOPE OF WORK

Pre-renovation inspections of the Central Classroom Building (CN-1025) located on the Auraria Higher Education Center (AHEC) campus were conducted from Thursday, July 11, 2024 through Thursday, July 25, 2024 by Clear Consulting, LLC for suspect asbestos-containing materials (ACM) that will potentially be impacted by the scheduled replacement of window units located on Floors 1, 2, and 3 and storefront/exterior door units located on Floor 1. The purpose of the inspections was to locate and sample suspect materials associated with the specific areas of the building to be impacted in order to compile an inventory of identified ACMs.

The inspection was conducted for Auraria Higher Education Center (AHEC) and the building is located on the AHEC Campus at 1055 10th Street Mall in Denver, Colorado.

1.1 INSPECTION FOR SUSPECT ASBESTOS-CONTAINING MATERIALS (ACM)

During the inspection conducted by Clear Consulting, LLC, the following suspect ACMs were identified by homogeneous areas of presence for the collection of bulk samples:

• Drywall walls – non-textured with joint compound (50 homogeneous areas)

• Storefront/door unit glazing sealant material (1 homogeneous area)

• Interior window stool adhesive (1 homogeneous area)

For the identification of ACM, a sampling scheme was utilized that employed the selection of sample locations for suspect materials on a random basis and the quantity of samples collected were in compliance with the requirements of the U.S. Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA), 40 CFR 763, Subpart E, as required by Colorado Air Quality Control Commission (AQCC), Regulation No. 8 for the inspection of school and commercial buildings.

Each bulk sample collected has an identification number that begins with the following acronym sequence:

• CN-1025-

This acronym sequence is followed by the room/area number identifying the location of the sample collection.

This room/area number is followed by another acronym describing each suspect material, followed by a sequential homogeneous area number (if applicable), and last by a sequential individual sample number.

• CDW = non-textured drywall with joint compound

• EDG = storefront/door unit glazing sealant

• WSA = interior window stool adhesive

The fifty (50) homogeneous areas of non-textured drywall with joint compound (CDW) located throughout the exterior perimeter walls and associated with window/storefront/exterior door unit locations on Floors 1, 2, and 3 of the building were separated and identified as follows:

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

• CDW 01: Floor 3 – Exterior perimeter drywall walls – pink/tan drywall with white/off-white compound

• CDW 02: Floor 3 – 303C/303D - north drywall partition wall – pink/tan drywall with white compound

• CDW 03: Floor 3 – 311D/311G – drywall partition walls – grey/tan drywall with white compound

• CDW 04: Floor 3 – 311F – east drywall partition wall – grey/tan drywall with white compound

• CDW 05: Floor 3 – 315C/315D - drywall partition wall – grey/tan drywall with white compound

• CDW 06: Floor 3 – 312/314A - drywall partition wall – grey/white/tan drywall with white caulk

• CDW 07: Floor 3 – 304K/306 - drywall partition wall – grey/tan drywall with off-white compound

• CDW 08: Floor 3 – 306 – south drywall partition wall – grey/tan drywall with white compound

• CDW 09: Floor 3 – 304D/304F – drywall infill at column – white/grey/tan drywall with white compound

• CDW 10: Floor 3 – 309/311A – drywall partition wall – grey/pink/tan drywall with white compound

• CDW 11: Floor 3 – 304E/304F – drywall infill at column – grey/tan drywall with white compound

• CDW 12: Floor 3 – 304D/304H - drywall infill at column – white/tan drywall with white compound

• CDW 13: Floor 3 – 306 - drywall infill at column – grey/white/tan drywall with white compound

• CDW 14: Floor 3 – 314A/314D - drywall infill at column – grey/tan drywall with white compound

• CDW 15: Floor 3 – 314D/S300B - drywall infill at column – white/tan drywall with white compound

• CDW 16: Floor 3 – 315B/315D - drywall infill at column – white/grey/tan drywall with white compound

• CDW 17: Floor 3 – 313 - drywall infill at column – white/grey/tan drywall with white compound

• CDW 18: Floor 3 – 311F - drywall infill at column - white/tan drywall with white/off-white compound

• CDW 19: Floor 3 – 311A/311E - drywall infill at column – white/grey/tan drywall with white compound

• CDW 20: Floor 3 – 307D/307H - drywall infill at column – white/tan drywall with white compound

• CDW 21: Floor 3 – 303A/303H - drywall partition wall – white/pink/tan drywall with white compound

• CDW 22: Floor 3 – 301 - drywall partition wall – white/pink/tan drywall with white compound

• CDW 23: Floor 2 – Exterior perimeter drywall walls - white/pink/tan drywall with white compound

• CDW 24: Floor 2 – 202D/222 - drywall infill at column – pink/tan drywall with white compound

• CDW 25: Floor 2 – 201L/201V - drywall infill at column – pink/tan/white drywall with white compound

• CDW 26: Floor 2 – 211G/211R - drywall infill at column – pink/tan/white drywall with white compound

• CDW 27: Floor 2 – 221B/211F – drywall partition walls - pink/tan drywall with white compound

• CDW 28: Floor 2 – 217/S200B - drywall infill at column – pink/tan drywall with white compound

• CDW 29: Floor 2 – 201K/201P – drywall partition walls - white/tan drywall with white compound

• CDW 30: Floor 2 – 206C/206D - drywall partition walls - pink/tan drywall with white compound

• CDW 31: Floor 2 – 211G/211T - drywall partition walls - pink/tan drywall with white compound

• CDW 32: Floor 2 – 213/218 - drywall infill at column – pink/tan drywall with white compound

• CDW 33: Floor 2 – 222/S200A - drywall infill at column – pink/tan drywall with white compound

• CDW 34: Floor 2 – 223/224 - drywall infill at column – grey/tan drywall with white compound

• CDW 35: Floor 1 – Exterior perimeter drywall walls - pink/tan drywall with off-white compound

• CDW 36: Floor 1 – 105E/105G - drywall infill at column – pink/tan drywall with white compound

• CDW 37: Floor 1 – 120H/120N - drywall partition walls – white/pink/tan drywall with white compound

• CDW 38: Floor 1 – 106D/106F - drywall partition walls – white/tan drywall with white compound

• CDW 39: Floor 1 – 119D/119J - drywall partition walls – white/tan drywall with white compound

• CDW 40: Floor 1 – 105E - drywall partition walls – white/tan drywall with white compound

• CDW 41: Floor 1 – 116 – north drywall partition wall – white/tan drywall with white compound

• CDW 42: Floor 1 – 106J/106L - drywall partition walls – white/tan/pink drywall with white compound

• CDW 43: Floor 1 – 120K/120S - drywall partition walls – pink/white/tan drywall with white compound

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

• CDW 44: Floor 1 – 119D/119E - drywall partition walls – white/tan drywall with white compound

• CDW 45: Floor 1 – 106E/106J – drywall infill at window - pink/white/tan drywall with white compound

• CDW 46: Floor 1 – 120K/120R - drywall infill at column - pink/tan drywall with white compound

• CDW 47: Floor 1 - 119D/119J - drywall infill at column - grey/tan drywall with white compound

• CDW 48: Floor 1 – 120D - drywall infill at window - grey/tan drywall with white compound

• CDW 49: Floor 1 – 116A - drywall infill at window - pink/tan/purple drywall with white compound

• CDW 50: Floor 1 – 106L/106M - drywall infill at window - pink/tan/grey drywall with white compound

The one (1) homogeneous area of exterior storefront/door unit frame glazing sealant (EDG) located between the glass panes and fixed stops of storefront and exterior doors was identified as follows:

• EDG 01: Floor 1 - V100A/V100B – north and east storefront units – black resinous glazing sealant

The one (1) homogeneous area of interior window stool adhesive (WSA) located under metal window stool covers was identified as follows:

• WSA 01: Floor 1 – 311E1/315C – window stool cover adhesive – grey/brown resinous material

Bulk samples of the suspect materials encountered were collected and each sample was assigned a unique identification number. Bulk samples were collected by an EPA/State of Colorado certified building inspector.

All samples were submitted to Eurofins Reservoirs Environmental, Inc. (ERE), a third-party independent laboratory. ERE is accredited through the National Voluntary Laboratory Accreditation Program (NVLAP) as required by USEPA. Bulk samples were analyzed by Polarized Light Microscopy (PLM) in general compliance with guidelines established by 40 CFR 763, Subpart E. Asbestos concentrations were visually estimated and/or point counted and reported by percent for each layer of the sample.

The specific information regarding the identified ACM is presented in Section 4.0 of this report.

2.0 PROJECT PERSONNEL

The following representatives of Clear Consulting, LLC, certified as Building Inspectors as required by Colorado Department of Public Health and Environment (CDPHE), Air Pollution Control Division (APCD), conducted the building inspections for suspect ACMs at the Central Classroom Building:

Clear Consulting, LLC: ACF No. 14902

Name of Building Inspector: H. Kim Thiel

State of Colorado Certification No.: 668

Name of Building Inspector: Frank Hulce

State of Colorado Certification No.: 1849

Name of Building Inspector: Jayson Windle

State of Colorado Certification No.: 4266

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

3.0 REGULATORY REVIEW – ASBESTOS-CONTAINING MATERIALS

USEPA and Colorado Department of Public Health and Environment (CDPHE) regulate all building materials that contain greater than 1% asbestos as determined by polarized light microscopy (PLM) analysis. The Occupational Health and Safety Administration (OSHA) regulates any building materials containing greater than 1% asbestos as well as smaller amounts of asbestos (“trace” amounts of 1% or less but greater than 0%) that may result in an airborne asbestos exposure due to physical disturbance.

USEPA and CDPHE Regulation No. 8, Part B, requires that suspect ACM in buildings built prior to 1988 be assumed to be asbestos-containing or an inspection be conducted by an EPA-accredited/CDPHE-certified asbestos building inspector. CDPHE, Regulation No. 8, Part B, requires an asbestos inspection in compliance with the AHERA protocol be conducted prior to demolition or renovation activities that could disturb ACM.

The USEPA and CDPHE require all friable ACMs be removed prior to renovation or demolition and any non-friable ACMs that may be rendered friable by those same activities.

In some circumstances, “point count” analysis is required for bulk samples previously identified by PLM. Point counting is a more detailed method of analysis than standard PLM. Federal and state agencies define ACM as materials containing greater than 1% asbestos. The NESHAP regulation requires that if standard PLM analysis determines that a sample contains less than 10% asbestos, the material must be considered asbestos-containing or be point counted.

CDPHE Regulation No. 8 (Section III.A.1.c.) requires that if the asbestos content of a sample of friable asbestos is estimated to be 1% asbestos or less, but greater than 0%, by a method other than point counting, the determination shall be repeated using the point counting technique with PLM and if the result obtained is different from the PLM result, the point count result must be used.

4.0 IDENTIFIED ASBESTOS-CONTAINING MATERIALS

• Storefront/door unit glazing sealant material (1 homogeneous area)

4.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED ASBESTOS-CONTAINING MATERIALS

The following summary itemizes the locations of the identified ACM.

Identified ACM Description Location Approximate Quantity

Storefront Glazing Sealant (EDG 01) – 1 H.A. Floor 1

V100A/V100B Exterior Storefront Units

100 Ln. Ft.

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

5.0 IDENTIFIED NON-ASBESTOS-CONTAINING MATERIALS

The following suspect materials were sampled, analyzed, and identified as non-asbestos-containing materials:

• Drywall walls – non-textured with joint compound (28 homogeneous areas)

• Interior window stool adhesive (1 homogeneous area)

5.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED NON-ASBESTOS CONTAINING MATERIALS

The following samples of suspect material were collected during the current inspection and were identified as non-ACM:

Note: Due to the assumption that all drywall partition walls adjacent or perpendicular to exterior perimeter walls, drywall infills at columns, and drywall infills at window units are OSHA drywall (Refer to Section 8) based upon the visual homogeneity of these materials, the approximate quantities of the following identified non-ACM, non-textured drywall walls are irrelevant but reported as approximate below.

Identified Non-ACM Description Location Approximate Quantity

Non-Textured Drywall (CDW 02) – 1 H.A. Floor 3

303C/303D Partition Wall

240 Sq. Ft.

Non-Textured Drywall (CDW 03) – 1 H.A. Floor 3

Suite 311 Partition Walls

700 Sq. Ft.

Non-Textured Drywall (CDW 04) – 1 H.A. Floor 3

311F

600 Sq. Ft.

Non-Textured Drywall (CDW 05) – 1 H.A. Floor 3

315C/315D

Non-Textured Drywall (CDW 06) – 1 H.A. Floor 3

312/314A

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

Non-Textured Drywall (CDW 07) – 1 H.A. Floor 3

304K/306

Non-Textured Drywall (CDW 08) – 1 H.A. Floor 3

South Partition Wall

Non-Textured Drywall (CDW 09) – 1 H.A. Floor 3

Suite 304 Drywall Column Infills

50 Sq. Ft.

Non-Textured Drywall (CDW 11) – 1 H.A. Floor 3

Suite 304

30 Sq. Ft.

Non-Textured Drywall (CDW 12) – 1 H.A. Floor 3

Suite 304

30 Sq. Ft.

Non-Textured Drywall (CDW 13) – 1 H.A. Floor 3

Drywall Window Recesses

40 Sq. Ft.

Non-Textured Drywall (CDW 14) – 1 H.A. Floor 3

Suite 314

80 Sq. Ft.

Non-Textured Drywall (CDW 16) – 1 H.A. Floor 3

Suite 315

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

Non-Textured Drywall (CDW 17) – 1 H.A. Floor 3

Non-Textured Drywall (CDW 18) – 1 H.A. Floor 3

311F

20 Sq. Ft.

Non-Textured Drywall (CDW 19) – 1 H.A. Floor 3

Suite 311

160 Sq. Ft.

Non-Textured Drywall (CDW 20) – 1 H.A. Floor 3

Suite 307

130 Sq. Ft.

Non-Textured Drywall (CDW 29) – 1 H.A. Floor 2

Suite 201

220 Sq. Ft.

Non-Textured Drywall (CDW 34) – 1 H.A. Floor 2

223/224

Non-Textured Drywall (CDW 37) – 1 H.A. Floor 1

Suite 120 (Partial) Drywall Partition Walls

1,500 Sq. Ft.

Non-Textured Drywall (CDW 38) – 1 H.A. Floor 1

Suite 106 (Partial)

1,000 Sq. Ft.

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

Non-Textured Drywall (CDW 39) – 1 H.A. Floor 1

Suite 119 (Partial)

1,200 Sq. Ft.

Non-Textured Drywall (CDW 40) – 1 H.A. Floor 1

105E Drywall Partition Wall

Non-Textured Drywall (CDW 41) – 1 H.A. Floor 1

Non-Textured Drywall (CDW 47) – 1 H.A. Floor 1

Suite 119

Non-Textured Drywall (CDW 48) – 1 H.A. Floor 1

120D

Non-Textured Drywall (CDW 49) – 1 H.A. Floor 1

116A North Partition Wall

Non-Textured Drywall (CDW 50) – 1 H.A. Floor 1

106L/M/N

480 Sq. Ft.

Window Stool Adhesive (WSA 01) – 1 H.A. Floors 1/2/3

Window Stool Metal Caps Unknown

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

5.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF NON-ACM

Identified Non-ACM Description Classification Physical Assessment

Non-Textured Drywall (CDW 02) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 03) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 04) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 05) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 06) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 07) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 08) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 09) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 11) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 12) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 13) – 1 H.A. Miscellaneous – Non-Friable Good Condition

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

Non-Textured Drywall (CDW 14) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 16) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 17) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 18) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 19) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 20) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 29) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 34) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 37) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 38) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 39) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 40) – 1 H.A. Miscellaneous – Non-Friable Good Condition

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

Non-Textured Drywall (CDW 41) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 47) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 48) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 49) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Non-Textured Drywall (CDW 50) – 1 H.A. Miscellaneous – Non-Friable Good Condition

Window Stool Adhesive (WSA 01) – 1 H.A. Miscellaneous – Non-Friable Good Condition

6.0 IDENTIFIED MATERIALS CONTAINING “TRACE” AMOUNTS OF ASBESTOS

Suspect materials can yield results indicating “trace” amounts of asbestos (1% or less but greater than 0%).

These materials are not regulated as ACM but require removal methods to comply with the exposure limits stipulated by the OSHA Construction Standard for Asbestos (29 CFR 1926.1101) with regard to their disturbance and/or removal:

• No encountered suspect materials sampled were identified with “trace” amounts of asbestos.

6.1 LOCATIONS AND QUANTIFICATION OF IDENTIFIED “TRACE” MATERIALS

6.2 CLASSIFICATION AND PHYSICAL ASSESSMENT OF “TRACE” MATERIALS

6.3 POINT COUNT ANALYSES OF “TRACE” MATERIALS

AURARIA HIGHER EDUCATION CENTER CENTRAL CLASSROOM

PRE-RENOVATION BUILDING INSPECTION NOVEMBER 26, 2024

7.0 DRYWALL MATERIALS WITH ACM JOINT COMPOUND – COMPOSITE ANALYSIS

Drywall materials without applied texture containing asbestos in amounts greater than 1% in only the joint compound component of the drywall system may be subjected to “composite” analysis. This procedure as conducted by the Polarized Light Microscopy (PLM) analytical laboratory considers the percentage of the entire drywall system bulk sample that is asbestos-containing joint compound as compared to the rest of the bulk sample and, accordingly, yields a “composite” result indicating the percentage of asbestos within the entire drywall system bulk sample.

Composite analysis is only permissible for drywall systems that are non-textured and composite results yielding an asbestos content of 1% or less renders the abatement/demolition of the drywall system to a status of “OSHA” drywall.