Appendix_E_Previous_GES_Contract_Tasks.pdf

PDF 56 KB Posted

Attached to
General Engineering Services XV
Solicitation number
2025-RFP-089
Issued by
Cuyahoga County, Ohio

About this file

Appendix E is a document listing previous General Engineering Services (GES) contract tasks for the Cleveland Water Department (CWD), specifically detailing tasks completed under GES 14. The document provides a comprehensive inventory of past engineering projects and services, which include water infrastructure, technology, and facility-related tasks such as water resiliency plan updates, HVAC assessments, pump tests, meter calibrations, hydraulic modeling, storage tank inspections, RF propagation studies, and various construction and technical support services.

The listed tasks demonstrate the broad scope of engineering services provided, ranging from technical assessments like water audits, cathodic protection training, and GIS data corrections to specific infrastructure projects including raw water main renewal, pump station HVAC upgrades, electrical improvements, and model calibrations for different water system zones. Highlighted tasks include water treatment feasibility analyses (such as PFAS treatment), vertical asset reviews, generator demand response, and construction support for multiple facilities. The document suggests a complex and multifaceted approach to water infrastructure engineering, indicating the technical depth and versatility of the engineering services contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

PREVIOUS GENERAL ENGINEERING SERVICES

CONTRACT TASKS

PREVIOUS GENERAL ENGINEERING SERVICE CONTRACT TASKS

FROM GES 14

Akron Water Resiliency Plan UpdateTwinsburg HVAC

Pleasant Valley Ground Storage Tank Conceptual

Westlake RF Propogation Study for AMR

Fairmont PS Pump Tests and Meter Calibration

Water Audit

Low Service Model and Crown Analysis

Tanks and tower inspections for cathodic protection

Comprehensive Distribution Model Roadmap

Crown Vertical Asset Review

Engle/Pearl Controls Support

Crown Pump Tests and DP calibration

Broadway Pump Tests

On-call hydraulic Modeling Assistance

PFAS Treatment Feasability Analysis

Second High West Model Calibration

Washwater Tank Covers

Cathodic Protection Training

First High Hydraulic and Surge Model

Kirtland Raw Water Main Renewal

Generatior Demand Response

Engle Programming

GIS Data Corrections Support

Second High East and Third High Cedar Model

2024-2025 Modeling Gap Assessment Summary

Roof Replacement at 1201 Lakeside

Crown Fluctuation

1201 Lakeside elevators evaluation

Baldwin Construction Support

Aurora pump station HVAC

Harvard Denison Construction Services

1825 Lakeside Electrical Improvements

Hydraulic Modeling

File details come from the government source that posted it. Updated .