APPENDIX E-Contractor Responsibility.pdf

PDF 32 KB Posted

Attached to
ABSTRACT OF OFFERORS IFB- MAINTENANCE DREDGING AT STATION CAPE DISAPPOINTMENT, ILWACO, WA
Solicitation number
70Z08823R00000354
Issued by

About this file

This document includes an invitation for bid for maintenance dredging services at Station Cape Disappointment in Ilwaco, Washington. Major work items include conducting maintenance dredging, providing hydrographic and ecological surveys before and after dredging, disposing of dredge spoils at approved beneficial reuse sites, providing real-time internet monitoring of dredging operations and production, complying with all environmental permits, and submitting pre- and post-dredge project reports. The approved in-water work window is November 1, 2022 to February 28, 2023. Bids must be uploaded to DOD Safe between December 5-12, 2022. The procurement estimate is between $1,000,000 and $5,000,000, and the NAICS code for this project is 237990. The award will be a single firm fixed price contract issued by the U.S. Coast Guard.

View the file

Other files

File Type Posted
ABSTRACT OF OFFERS IFB 70Z08823R00000354.pdf PDF
Amendment 0009 - IFB_70Z08823R00000354_CAPE D MTC DREDGE.pdf PDF
APPENDIX C-SPECIFICATIONS_StaCapeDdredge_FinalRev15Dec2022.pdf PDF
Amendment 0008 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_09Dec22.pdf PDF
Amendment 0007 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_09Dec22.pdf PDF
Amendment 0006 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_09Dec22.pdf PDF
Amend 5 Attachment 1-63169GP Modified Authorization_08Dec22.pdf PDF
Amendment 0005 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_09Dec22.pdf PDF
Amendment 0004 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_09Dec22.pdf PDF
Amend 3 Attachment 1-DSL Permit Exp 28Apr23_63169GP RenewalAuthorization20220803.pdf PDF
Amendment 0003 - IFB_70Z08823R00000354_CAPE D MTC DREDGE_08Dec22.pdf PDF
Amendment 0002 - IFB_70Z08823R00000354_CAPE D MTC DREDGE.pdf PDF
Amendment 0001 - IFB_70Z08823R00000354_CAPE D MTC DREDGE-Map.pdf PDF
APPENDIX B1-Environmental Permits.pdf PDF
APPENDIX F-Clarification Request Form.docx DOCX document
IFB_70Z08823R00000354_MAINTENANCE DREDGING AT USCG STATION CAPE DISAPPOINTMENT.pdf PDF
APPENDIX C-SPECIFICATIONS_StaCapeDdredge_21 Sept 2022.pdf PDF
APPENDIX D-WAGE DETERMINATION_WA20220080_25Feb22.pdf PDF
APPENDIX G-CERT OF AUTHORIZATION TO BIND CORPORATION FAR 4.pdf PDF
APPENDIX B2-Dredge Prism Design-26Sept2022.pdf PDF
APPENDIX A-SF1442-STACAPED DREDGE_R0000354.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR’S RESPONSIBILITY QUESTIONNAIRE

It is the general policy of the United States Coast Guard that contracts shall be awarded only to contractors determined to be responsible in accordance with Part 9 of the Federal Acquisition Regulation (FAR).

No contract shall be awarded to any person or firm unless the Contracting Officer first makes an affirmative determination that the prospective contractor is responsible within the meaning of the FAR, Part 9.

Before making a determination of responsibility, the Contracting Officer shall have in his/her possession or obtain information sufficient to satisfy himself/herself that a prospective contractor currently meets the minimum FAR Part 9 standards.

In order to make the required determination and also to expedite the contract award, the following information must be submitted by the Contractor as directed. SEE SECTION L.10

A. Completed contractor experience data form with supplemental schedules A-D (Attached).

B. Latest financial statements. If the financial statement is more than 60 days old, submit a certificate stating that the firm's financial condition is substantially the same, or, if not the same, state the changes that have taken place.

C. Provide letters from banks or other financial institutions with which the contractor conducts business. The letters should contain information about your firm's accounts, loans, lines of credit, etc., providing information leading to a determination that your firm is "responsible" as defined in the federal acquisition regulation, part 9, "has the financial resources to perform the contract or the ability to obtain them". The government is interested in financial stability, timely payments, the length and nature of the relationship between the firm and the financial institution, etc. that reveals the firm's financial ability to perform the contract. The letters should also provide the name and telephone number of the bank representative the government may contact.

THESE DOCUMENTS SHALL BE TREATED BY THE GOVERNMENT AS

CONFIDENTIAL.

CONSTRUCTION CONTRACTOR EXPERIENCE DATA

DATE:

Firm Name and Telephone Number Main Office Address (Street, City, and State)

Branch Offices Services Rendered Construction Design Consultant

Organization Individual ∆ Joint Venture Partnership ∆ Corporation

Date Organized Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below) Partners:

Officers:

Other Key:

Remainder: Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED

III—FINANCIAL DATA AS OF

(DATE):

Present Value ($)

Current Assets:

Acquisition Cost ($) Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION

WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE

(LIST MOST RECENT FIRST)

V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$ LARGEST JOB IN PAST 6 YRS Contract Amount:

Description:

Owner:

$ Contract Amount:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE

NOTE: Use reverse side for explanations or detailed description of item(s) reported above.

SCHEDULE A

CONSTRUCTION CONTRACTOR

EXPERIENCE DATA

EXISTING COMMITMENTS: List below ongoing dredging project or projects including those on which you are presently the low bidder but have not received an award.

CONTRACT NUMBER:

AMOUNT:

DESCRIPTION OF WORK/LOCATION:

*FOR WHOM PERFORMED:

PERCENT COMPLETE:

* PROVIDE NAME OF ORGANIZATION, POINT OF CONTACT AND TELEPHONE

NUMBER FOR CONTACT.

SCHEDULE B

EXPERIENCE DATA: List below dredging projects your firm has completed within the past six (6) years.

CONTRACT NUMBER:

AMOUNT:

DESCRIPTION OF WORK/LOCATION:

COTACT PERSON/PHONE NUMBER:

SCHEDULE C

CONSTRUCTION AND/OR TECHNICAL EOUIPMENT: List total equipment and facilities owned for performing the work and present status as to whether or not it is committed to existing contracts.

DESCRIPTION:

QUANTITY:

CONDITION:

YEARS OF PRESENT SERVICE STATUS:

File details come from the government source that posted it. Updated .