Appendix B1 - BID ALTERNATES SCF Security Perimeter Improvements.pdf
PDF 162 KB Posted
- Solicitation number
- 2025-083M24
- Issued by
- Lincoln County, Colorado
About this file
This document is a Bid Alternates Form issued by the State of Colorado's Office of the State Architect for the Colorado Department of Corrections' Security Perimeter Improvements project at Sterling Correctional Facility (Project No. 2025-083M24). The form provides a structured template for bidders to indicate potential additive and deductive alternates for the project, with specific emphasis on a 5 Year Maintenance Agreement listed as Additive Alternate No. 1. The document allows for up to 10 different additive and 10 different deductive alternates, with space for bidders to specify the financial impact of each alternate on the base bid.
The form is designed to provide flexibility in the bidding process, allowing contractors to propose modifications to the base bid through various alternates. Notably, the document stipulates that additive alternates cannot be used simultaneously with deductive alternates, requiring bidders to choose between the two approaches. The form references specification section Drawing ES-1 Note 15 for detailed descriptions of the add alternates, and instructs bidders to enter the specific monetary amounts for each alternate. The document is part of the State Buildings Program and was issued in August 2023, indicating a current procurement process for the security perimeter improvements project at the correctional facility.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP –6.131
Issued 8/2023
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES FORM
Institution/Agency: Colorado Department of Corrections / Facility Management Services Project No./Name: 2025-083M24 / Security Perimeter Improvements, Sterling Correctional Facility
Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
Additive Alternates (If Applicable) Refer to specification section Drawing ES-1 Note 15 for descriptions of add alternates. If the add alternates are accepted, the base bid would be modified by the amount entered by the bidder.
A.A. No. 1 5 Year Maintenance Agreement Add $ A.A. No. 2 Add $ A.A. No. 3 Add $ A.A. No. 4 Add $ A.A. No. 5 Add $ A.A. No. 6 Add $ A.A. No. 7 Add $ A.A. No. 8 Add $ A.A. No. 9 Add $ A.A. No. 10 Add $
Deductive Alternates (If Applicable)
Refer to specification section for descriptions of the deductive alternates. If the deductive alternates are accepted, the base bid would be modified by the amount entered by the bidder.
D.A. No. 1 Deduct $ D.A. No. 2 Deduct $ D.A. No. 3 Deduct $ D.A. No. 4 Deduct $ D.A. No. 5 Deduct $ D.A. No. 6 Deduct $ D.A. No. 7 Deduct $ D.A. No. 8 Deduct $ D.A. No. 9 Deduct $ D.A. No. 10 Deduct $
THE BIDDER:
Company Name
Signature Date
| STATE OF COLORADO |
| OFFICE OF THE STATE ARCHITECT |
| BID ALTERNATES FORM |
| Colorado Department of Corrections / Facility Management Services |
| 2025-083M24 / Security Perimeter Improvements, Sterling Correctional Facility |
File details come from the government source that posted it. Updated .