Appendix B1 - Bid Alternates DRDC Fire Protection Repl.pdf
PDF 317 KB Posted
- Solicitation number
- IFB1 CBAA 2027000036 1
- Issued by
- El Paso County, Colorado
About this file
This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Department of Corrections Facility Management Services project 2026-012P25, titled DRDC Fire Protection System Replacement. The form provides a structured template for bidders to submit pricing for additive and deductive alternates to the base bid. Additive alternates listed include adding air aspirating smoke detection in lieu of spot detection, adding ERCES to provide additional radio coverage, and adding a fire alarm graphics workstation. The document specifies that additive and deductive alternates are mutually exclusive—only one category may be used per bid submission. Specification sections and pricing fields are provided for up to ten alternates in each category, with one additive alternate (AA1) showing a specification section reference of 2.13.B and a pricing amount of $275,129.17.
The form requires bidders to identify their company name and provide authorized signatures and dates upon submission. No specific response deadlines, site visit requirements, or award dates are detailed in this bid alternates document. The pricing structure allows the base bid to be modified by the amounts entered for selected alternates, providing flexibility in project scope and cost. Bidders must reference Item #8 in the Instructions to Bidders (SBP-6.12) and the contract documents for thorough descriptions of each alternate to ensure accurate pricing and submission.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Department of Corrections / Facility Managment Services |
| TextInput.173: 2026-012P25 / DRDC Fire Protection System Replacement |
| TextInput: |
| AA1: |
| 0: |
| 2: Add air aspirating smoke detection in lieu of spot |
| 3: Add ERCES to provide additional radio coverage |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: Add fire alarm graphics workstation |
| AA1S: |
| 0: |
| 2: 2.9 |
| 3: 275129.17 |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: 2.13.B |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .