About this file

This is a Bid Alternates form from the State of Colorado's Office of the State Architect for the Colorado Department of Corrections, specifically for Project No. 2023-054M22 titled "Replace Roofs, DCC PH III". The document provides a structured template for bidders to specify additive and deductive alternates for the project, with space for up to 10 alternate options in each category. The form includes specific instructions about how alternates should be used, noting that additive and deductive alternates are mutually exclusive and that bidders should refer to contract documents for detailed alternate descriptions.

The form has two primary additive alternate options already specified: A.A.1 involves adding a Recreation Building (DE33) Roof to the project, and A.A.2 involves adding a Chapel Building (DE40) Roof to the project, both under Specification Section 01 23 00. The document is designed for bidders to fill in specific pricing for these and potentially other alternates, with the understanding that if alternates are accepted, the base bid will be modified accordingly. The form is part of the State Buildings Program's standard bidding process and is revision dated 7/2025 R1, indicating it is a current template for state construction projects.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.131

Rev 7/2025 R1

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

BID ALTERNATES

Institution or Agency:

Project No./Project Name:

INSTRUCTIONS:

1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.

2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.

3. Refer to the contract documents for thorough description(s) of the alternates.

4. If alternates are accepted, the base bid will be modified by the amount entered below.

ADDITIVE ALTERNATES

Alt. # Description of Additive Alternate Spec. Section Pricing

A.A.1 $

A.A.2 $

A.A.3 $

A.A.4 $

A.A.5 $

A.A.6 $

A.A.7 $

A.A.8 $

A.A.9 $

A.A.10 $ lanexxTX Line lanexxTX Line

SBP-6.131

Rev 7/2025 R1

DEDUCTIVE ALTERNATES

Alt. # Description of Deductive Alternate Spec. Section Pricing

D.A.1

D.A.2 $

D.A.3 $

D.A.4 $

D.A.5 $

D.A.6 $

D.A.7 $

D.A.8 $

D.A.9 $

D.A.10 $

THE BIDDER

BY_________________________________________________________________

Company Name

BY__________________________________________________________________

Signature Date

BID ALTERNATES
INSTRUCTIONS:
ADDITIVE ALTERNATES
DEDUCTIVE ALTERNATES
THE BIDDER
TextInput.127: Colorado Department of Corrections
TextInput.173: 2023-054M22 / Replace Roofs, DCC PH III
TextInput:
AA1:
0:
2: Add Chapel Bldg. (DE40) Roof to Project
3:
4:
5:
6:
7:
8:
9:
1: Add Recreation Bldg. (DE33) Roof to Project
AA1S:
0:
2: 01 23 00
3:
4:
5:
6:
7:
8:
9:
1: 01 23 00
AA1P:
0:
2:
3:
4:
5:
6:
7:
8:
9:
1:
DA1:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1S:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
DA1P:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:

Company Name:

File details come from the government source that posted it. Updated .