APPENDIX A TECHNICAL QUESTIONS AND ANSWERS.docx
DOCX document 18 KB Posted
- Solicitation number
- ITB-04155
- Issued by
- Clay County, Florida
About this file
This document contains technical questions and answers regarding a state and local contract opportunity from the Florida Department of Transportation (FDOT) to Clean, Inspect, Video, and Map Storm Water Systems in District Two. The contract involves inspecting, videoing, and mapping storm water systems, with work orders ranging from 24 feet of pipe to over 1,500 feet. While the contract does not have a set annual budget, work orders will be provided to the contractor on an as-needed basis to support design efforts, with no guarantee of work volume. The contract requires specific video reporting and mapping requirements, as detailed in the FDOT specifications. The sealed bids for this contract will be received until 2:00 p.m. on Tuesday, December 6, 2022, and will be opened at 2:30 p.m. the same day.
The contract does not allow for debris box staging or equipment parking on FDOT properties or fenced-in pond locations within the project scope areas. The contract is subject to various nondiscrimination statutes and authorities, and the contractor must comply with the Florida Inspector General requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit C Bid Sheet.xlsx | XLSX spreadsheet | |
| EXHIBIT D 2023 Pipe Contracts Spec Package.pdf | ||
| EXHIBIT A SCOPE OF SERVICES PD vidoeing.doc | DOC document | |
| EXHIBIT B METHOD OF COMPENSATION.docx | DOCX document | |
| DOT-ITB-23-2026-KC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS & ANSWERS:
Clean, Inspect, Video, and Map Storm Water Systems in District Two, DOT-ITB-23-2026-KC
1.) Has the department previously let a project of this nature and or size for district two with similar scope and quantities? YES If so, can the previous bid tabulations be shared with the prospective bidders for this project bid? YES, THE TABULATION SHEET WILL BE PROVIDED.
2.) The bid documents state that contractors will be able to work between the hours of 8:00 AM and 5:00 PM. Will this hold true for all areas within the scope of the project? Many FDOT roads have work lane closure restrictions that require work to be performed between the hours of 9:00 AM and 3:00 PM depending on the locations for the work. Some areas also list work hours to be performed at nighttime due to heavy traffic situations. Please clarify. THE TIME FRAME WAS AN OVERSIGHT ON MY PART, WORK WILL NEED TO BE SCHEDULED TO AVOID PEAK HOURS AND BACKING UP TRAFFIC AND MAY HAVE RESTRICTIONS.
3.) Will the department allow debris box staging on any of its properties or fenced in pond locations within the project scope areas? NO 4.) Will the department allow equipment parking on any of its properties or fenced in pond locations within the project scope areas? NO 5.) Assuming this will be a work order driven project, can the department please provide an estimate on how large or small the work orders may be at any given time and how often will the work orders be provided to the contractor to mobilize and complete the work? ISSUED 24’ OF PIPE WITHIN AN LOA TO 1500’+ OF PIPE WITHIN IN AN LOA. THESE CONTRACTS ARE TO AID IN DESIGN. WORK COMES IN VERY DIFFERENT – COULD HAVE 6 IN A MONTH OR 1 IN A 2-3 MONTH TIME FRAME. AGAIN, THIS CONTRACT IS TO SUPPORT DESIGN EFFORTS. NO GUARANTEE OF WORK.
6.) Does the department have a set, per year budget in mind for this project that can be provided or an estimate of total cost for the quantities provided? NO 7.) It is mentioned in the documents Exhibit A, that “Mapping of the Storm system” is also required. How is this information to be presented to the department upon completion? There is no mention of formatting for this within the documents provided.
REQUIRESMENTS ARE BELOW: from FDOT Specifications 430-4.8.1 Video Report:
1. Provide video files via digital media (DVD, flash drive, or other) or by online digital distribution with a minimum standard resolution of 720 x 480. Use a camera with lighting suitable to allow a clear picture of the entire periphery of the pipe. Center the camera in the pipe both vertically and horizontally and be able to pan and tilt to a 90 degree angle with the axis of the pipe and rotating 360 degrees. Use equipment to move the camera through the pipe that will not obstruct the camera’s view or interfere with proper documentation of the pipe’s condition.
1. The video image shall be clear, focused, and relatively free from roll, static, or other image distortion qualities that would prevent the reviewer from evaluating the condition of the pipe. The video will include identification before each section of pipe filmed. The identification will include the project number, the structure number corresponding to the structure number in the Plans for the project, size of pipe, the date and time, and indicate which pipe is being filmed if multiple pipes are connected to the structure. Notes should be taken during the video recording process. Submit these notes along with the video.
1. Move the camera through the pipe at a speed not greater than 30 feet per minute. Mark the video with the distance down the pipe. The distance shall have an accuracy of one foot per 100 feet. Film the entire circumference at each joint. Stop the camera and pan when Return to Table of Contents 466 FY 2023-24 necessary to document and measure defects. Position the camera head perpendicular to all defects requiring measurement by the video micrometer.