Appendix A - Project Data Form.pdf

PDF 121 KB Posted

Attached to
UNH Dimond Library Elevator Upgrades
Solicitation number
2120271007
Issued by
New Hampshire

About this file

This file is an Appendix A Project Data Form template used by the University of New Hampshire Facilities Project Management (UNH FPM) to evaluate contractor qualifications for the Dimond Library Elevator Upgrades project. The form requests comprehensive information about the contractor's past experience, including project details, delivery method (design/bid/build, design/build, or CM at risk), and key personnel who will work on the proposed elevator replacement project. Contractors must provide detailed project descriptions emphasizing similarities to the proposed work, construction costs including original contract amounts and change orders, project complexity assessments, and scheduling information such as notice to proceed dates, substantial completion dates, and final completion dates. The form also requires contractors to identify coordination efforts with other contractors and to submit project photographs demonstrating relevant experience with comparable work.

The form emphasizes the importance of documenting past project performance, including explanations for any change orders exceeding 5% of the original contract amount. Contractors must list all employees who worked on referenced projects and specify their proposed roles on the Dimond Library Elevator Upgrades project. This template serves as a qualification and experience verification document, allowing UNH FPM to assess contractor capability to successfully execute the elevator cylinder and door replacement work. The form provides space for architects and engineers of record information, enabling verification of professional team experience and coordination on previous projects of similar scope and complexity.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A - PROJECT DATA FORM

CONTRACTOR: ___________________________________________________________________

DELIVERY METHOD: design/bid/build; design/build; CM at risk

Project Name: ______________________________________________________________________________

Project Address: ______________________________________________________________________________

Owner’s Name: _______________________________________________________________________________

Owner’s Address: ______________________________________________________________________________

Owner’s Contact: _________________________________ Phone Number: _________________________

Owner’s Contact E-mail Address: _________________________________________________________________

Architect of Record: __________________________________________________________________________

Architect’s Address: __________________________________________________________________________

Architect’s Contact: ________________________________ Phone Number: _________________________

Architect’s Contact E-mail Address: _______________________________________________________________

Engineer of Record: __________________________________________________________________________

Engineer’s Address: __________________________________________________________________________

Engineer’s Contact: ________________________________ Phone Number: _________________________

Engineer’s Contact E-mail Address: ________________________________________________________________

Contractor’s Employees who worked on this Project

(Note if these individuals will be working on the proposed project and in what capacity)

Employee Name Position Held on Project Will work on proposed project as (fill in the blank)

1. Project Description: (please emphasize similarities to proposed project):

2. Construction Costs:

Original Contract Amount: $____________________

Change Order Total: $____________________

Final Contract Amount: $____________________

If change order total exceeds 5% of the original contract amount, please explain:

3. Project Complexity: Attach additional page(s) if needed.

4. Project Schedule: Required/Contracted Construction Duration: _________________________________

Notice to Proceed Date: __________________________________________________

Date of Substantial Completion: ___________________________________________

Date of Final Completion (final payment): ___________________________________

5. Coordination: If applicable, describe specific circumstances surrounding the requirement that the general contractor coordinate work with other contractors hired separately by the Owner working in adjacent buildings or roads.

6. Additional Comments/Information: In addition to filling out this form completely, please feel free to attach other project information hereto.

7. Project Photograph(s): Please include one or more photographs of the subject project that emphasize project complexities, site constraints, architectural details and the like.

undefined:
designbidbuild: Off
designbuild: Off
CM at risk: Off
Project Name:
Project Address 1:
Project Address 2:
Owners Name:
Owners Address 1:
Owners Address 2:
Owners Contact:
Phone Number:
Owners Contact Email Address:
Architect of Record:
Architects Address 1:
Architects Address 2:
Architects Contact:
Phone Number_2:
Architects Contact Email Address:
Engineer of Record:
Engineers Address 1:
Engineers Address 2:
Engineers Contact:
Phone Number_3:
Engineers Contact Email Address:
Employee NameRow1:
Position Held on ProjectRow1:
Will work on proposed project as fill in the blankRow1:
Employee NameRow2:
Position Held on ProjectRow2:
Will work on proposed project as fill in the blankRow2:
Employee NameRow3:
Position Held on ProjectRow3:
Will work on proposed project as fill in the blankRow3:
Employee NameRow4:
Position Held on ProjectRow4:
Will work on proposed project as fill in the blankRow4:
Project Description please emphasize similarities to proposed project 1:
Project Description please emphasize similarities to proposed project 2:
Project Description please emphasize similarities to proposed project 3:
Project Description please emphasize similarities to proposed project 4:
Project Description please emphasize similarities to proposed project 5:
Project Description please emphasize similarities to proposed project 6:
Project Description please emphasize similarities to proposed project 7:
Project Description please emphasize similarities to proposed project 8:
Project Description please emphasize similarities to proposed project 9:
undefined_2:
undefined_3:
undefined_4:
If change order total exceeds 5 of the original contract amount please explain 1:
If change order total exceeds 5 of the original contract amount please explain 2:
If change order total exceeds 5 of the original contract amount please explain 3:
If change order total exceeds 5 of the original contract amount please explain 4:
Project Complexity Attach additional pages if needed 1:
Project Complexity Attach additional pages if needed 2:
Project Complexity Attach additional pages if needed 3:
Project Complexity Attach additional pages if needed 4:
RequiredContracted Construction Duration:
Notice to Proceed Date:
Date of Substantial Completion:
Date of Final Completion final payment:
or roads 1:
or roads 2:
or roads 3:
or roads 4:
or roads 5:
or roads 6:

File details come from the government source that posted it. Updated .