Appendix 3_ELINs_IDIQ Temporary Relocatable Facility.xls
XLS spreadsheet 167 KB Posted
- Attached to
- Temporary Relocatable Facilities, Marianas Guam Federal contract opportunity
- Solicitation number
- N40192-23-R-9001
About this file
This solicitation is for a competitive HUBZone small business set-aside contract to provide Temporary Relocatable Facilities at various military facilities on Guam, including Naval Base Guam and Andersen Air Force Base. The acquisition will result in the award of a firm-fixed price indefinite delivery/indefinite quantity contract for one base year with four optional one-year periods and a six-month extension option. The North American Industry Classification System code is 531120 and Product Service Code is X1AZ. The contractor will provide all labor, management, tools, material, supplies, equipment and transportation to lease and maintain relocatable facilities in accordance with DoD and Navy regulations. The place of performance is military installations in Guam, the Northern Marianas Islands and other locations as ordered.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0003_N4019223R9001.pdf | ||
| Encl (1) Notice 1_Answers to RFI_AMD 0002.pdf | ||
| Amend 0002_N4019223R9001.pdf | ||
| Amend 0001_N40192-23-R-9001.pdf | ||
| N40192-23-R-9001_Temporary Relocatable Facilities_Pre-Proposal Slides_final 24FEB2023.pdf | ||
| N40192-23-R-9001_Temporary Relocatable Facilities_Pre-Proposal Sign-in Sheet 24FEB2023.pdf | ||
| Appendix 1_PWS Annex 0100000_0200000_1501001.pdf | ||
| Appendix 2_Service Contract Act Wage Determination No 2015 5693 Rev18.pdf | ||
| Appendix 5_Questions_Request for Information RFI.pdf | ||
| N40192-23-R-9001_SF1449 Temp Relocatable Facilities RFP.pdf | ||
| Appendix 6_Base Access Forms.pdf | ||
| Appendix 4_NAVFAC Past Performance Questionnaire (FORM PPQ-0).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs Base Period Non Recurring
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT A - CLIN 9000 | |||||||
| Line Item 0001 Non-Recurring Work - Base Period | |||||||
| PROVIDE PRICES FOR FACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A700 through A703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| A700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| A700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | |
| A700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | |
| A700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| A700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ |
| A700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| A700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| A700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ |
| A700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit, 8' x 20' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| A700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | |||
| A701 | Install Optional Items | |||||||
| A701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | ||
| A701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | |||
| A701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 25,000 | SF | $ | $ | ||
| A701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 20 | EA | 3 | $ | $ | |
| A702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | $ | $ | ||
| A703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 150,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - BASE PERIOD | $ |
ELINs 1st Opt Period Non Recur
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT B - CLIN 9001 | |||||||
| Line Item 0002 Non-Recurring Work - First Option Period | |||||||
| PROVIDE PRICES FOR FACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B700 through B703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| B700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| B700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | |
| B700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | |
| B700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| B700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ |
| B700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| B700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| B700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ |
| B700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| B700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | |||
| B701 | Install Optional Items | |||||||
| B701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | ||
| B701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | |||
| B701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 25,000 | SF | $ | $ | ||
| B701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 20 | EA | 3 | $ | $ | |
| B702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | $ | $ | ||
| B703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 150,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - FIRST OPTION PERIOD | $ |
ELINs 2nd Opt Period Non Re
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT C - CLIN 9002 | |||||||
| Line Item 0003 Non-Recurring Work - Second Option Period | |||||||
| PROVIDE PRICES FORFACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C700 through C703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| C700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| C700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | |
| C700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | |
| C700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| C700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ |
| C700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| C700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| C700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ |
| C700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| C700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | |||
| C701 | Install Optional Items | |||||||
| C701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | ||
| C701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | |||
| C701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 25,000 | SF | $ | $ | ||
| C701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 20 | EA | 3 | $ | $ | |
| C702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | $ | $ | ||
| C703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 150,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - SECOND OPTION PERIOD | $ |
ELINs 3rd Opt Period Non Re
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT D - CLIN 9003 | |||||||
| Line Item 0004 Non-Recurring Work - Third Option Period | |||||||
| PROVIDE PRICES FORFACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D700 through D703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| D700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| D700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | |
| D700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | |
| D700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| D700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ |
| D700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| D700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| D700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ |
| D700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| D700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | |||
| D701 | Install Optional Items | |||||||
| D701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | ||
| D701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | |||
| D701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 25,000 | SF | $ | $ | ||
| D701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 20 | EA | 3 | $ | $ | |
| D702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | $ | $ | ||
| D703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 150,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - THIRD OPTION PERIOD | $ |
ELINs 4th Opt Period Non Re
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT E - CLIN 9004 | |||||||
| Line Item 0005 Non-Recurring Work - Fourth Option Period | |||||||
| PROVIDE PRICES FORFACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E700 through E703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| E700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| E700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | |
| E700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | |
| E700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| E700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ |
| E700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ |
| E700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| E700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ |
| E700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ |
| E700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | |||
| E701 | Install Optional Items | |||||||
| E701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | ||
| E701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | |||
| E701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 25,000 | SF | $ | $ | ||
| E701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 20 | EA | 3 | $ | $ | |
| E702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 1,500 | HR | $ | $ | ||
| E703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 150,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - FOURTH OPTION PERIOD | $ |
ELINs Ext Opt Period Non Rec
| ATTACHMENT J-0200000-09 / Appendix 3 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | |||||||
| EXHIBIT F - CLIN 9005 | |||||||
| Line Item 0006 Non-Recurring Work - Extension Option Period (6 mos) | |||||||
| PROVIDE PRICES FORFACILITY MANAGEMENT (RELOCATABLE FACILITY) - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs F700 through F703 | |||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| F700 | Delivery, Setup, Lease and Removal of Relocatable Facility | ||||||
| F700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 55 | UN | $ | $ | |
| F700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 55 | UN | $ | $ | |
| F700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 8 | UN | 6 | $ | $ |
| F700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 10 | UN | 6 | $ | $ |
| F700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 8 | UN | 6 | $ | $ |
| F700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 9 | UN | 6 | $ | $ |
| F700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 3 | EA | 6 | $ | $ |
| F700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 9 | UN | 6 | $ | $ |
| F700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 10 | UN | 3 | $ | $ | |||
| F701 | Install Optional Items | |||||||
| F701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 10,000 | SF | $ | $ | ||
| F701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 84 | EA | $ | $ | |||
| F701AC | Install Insulation/Sound Barrier to Relocatable Temporary Building Unit | Install additional insulation/sound barrier. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 12,500 | SF | $ | $ | ||
| F701AD | Delivery, Setup, 7 CF Refrigerator | Install a 7cu ft refrigerator. Ensure that electrical installation is isolated for refrigerator. | 10 | EA | 3 | $ | $ | |
| F702 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | 750 | HR | $ | $ | ||
| F703 | Material Costs- MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. | Not to Exceed | $ 75,000.00 | ||||
| TOTAL NON-RECURRING WORK PRICE - EXTENSION OPTION PERIOD | $ |
Non Recurring All
| EXHIBIT LINE ITEM NUMBERS | ||||||||||||||||||||||||||||||||||||||||||
| SOLICITATION/CONTRACT #N40192-23-R-9001 | ||||||||||||||||||||||||||||||||||||||||||
| EXHIBIT A - CLIN 9000 | EXHIBIT B - CLIN 9001 | EXHIBIT C - CLIN 9002 | EXHIBIT D - CLIN 9003 | EXHIBIT E - CLIN 9004 | EXHIBIT F - CLIN 9004 | |||||||||||||||||||||||||||||||||||||
| Line Item 0001 Non-Recurring Work - Base Period | Line Item 0002 Non-Recurring Work - First Option Period | Line Item 0003 Non-Recurring Work - Second Option Period | Line Item 0004 Non-Recurring Work - Third Option Period | Line Item 0005 Non-Recurring Work - Fourth Option Period | Line Item 0006 Non-Recurring Work - Extension Option Period | |||||||||||||||||||||||||||||||||||||
| ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | ELIN | DESCRIPTION | Quantity | Unit of Issue | Total Months | Unit Price | Total | |
| A700 | Delivery, Setup, Lease and Removal of Relocatable Facility | B700 | Delivery, Setup, Lease and Removal of Relocatable Facility | C700 | Delivery, Setup, Lease and Removal of Relocatable Facility | D700 | Delivery, Setup, Lease and Removal of Relocatable Facility | E700 | Delivery, Setup, Lease and Removal of Relocatable Facility | F700 | Delivery, Setup, Lease and Removal of Relocatable Facility | |||||||||||||||||||||||||||||||
| A700AA | Delivery/Set-Up Installation, Spec Item 4.2 | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Relocatable facilities are delivered clean, operable and ready for use 30 days after KO direction. | 109 | UN | $ | $ | B700AA | Delivery/Set-Up Installation, Spec Item 3.2 | 109 | UN | $ | $ | C700AA | Delivery/Set-Up Installation, Spec Item 3.2 | 109 | UN | $ | $ | D700AA | Delivery/Set-Up Installation, Spec Item 3.2 | 109 | UN | $ | $ | E700AA | Delivery/Set-Up Installation, Spec Item 3.2 | 109 | UN | $ | $ | F700AA | Delivery/Set-Up Installation, Spec Item 3.2 | 55 | UN | $ | $ | ||||||
| A700AB | Removal of Relocatable Facilities, Spec Item 4.3 | Contractor to remove unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Removal of relocatable facilities and area restoration shall be completed within 15 days after known completion date. | 109 | UN | $ | $ | B700AB | Removal of Relocatable Facilities, Spec Item 3.3 | 109 | UN | $ | $ | C700AB | Removal of Relocatable Facilities, Spec Item 3.3 | 109 | UN | $ | $ | D700AB | Removal of Relocatable Facilities, Spec Item 3.3 | 109 | UN | $ | $ | E700AB | Removal of Relocatable Facilities, Spec Item 3.3 | 109 | UN | $ | $ | F700AB | Removal of Relocatable Facilities, Spec Item 3.3 | 55 | UN | $ | $ | ||||||
| A700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ | B700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | 15 | UN | 12 | $ | $ | C700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | 15 | UN | 12 | $ | $ | D700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | 15 | UN | 12 | $ | $ | E700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | 15 | UN | 12 | $ | $ | F700AC | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 8' x 20'. INTENT: OFFICE SPACE, 8' X 20 ' | 8 | UN | 6 | $ | $ |
| A700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 19 | UN | 12 | $ | $ | B700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | 19 | UN | 12 | $ | $ | C700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | 19 | UN | 12 | $ | $ | D700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | 19 | UN | 12 | $ | $ | E700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | 19 | UN | 12 | $ | $ | F700AD | Monthly Lease of One Story Relocatable Temporary Building Unit Sized 16' X 20'. INTENT: OFFICE SPACE | 10 | UN | 6 | $ | $ |
| A700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 15 | UN | 12 | $ | $ | B700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | 15 | UN | 12 | $ | $ | C700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | 15 | UN | 12 | $ | $ | D700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | 15 | UN | 12 | $ | $ | E700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | 15 | UN | 12 | $ | $ | F700AE | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 8' X 45' INTENT: SMALL CONFERENCE AREA | 8 | UN | 6 | $ | $ |
| A700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ | B700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | 17 | UN | 12 | $ | $ | C700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | 17 | UN | 12 | $ | $ | D700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | 17 | UN | 12 | $ | $ | E700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | 17 | UN | 12 | $ | $ | F700AF | Monthly Lease Service of One Story Relocatable Temporary Building Unit 16' X 45'. INTENT: LARGE CONFERENCE AREA | 9 | UN | 6 | $ | $ |
| A700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 6 | EA | 12 | $ | $ | B700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | 6 | EA | 12 | $ | $ | C700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | 6 | EA | 12 | $ | $ | D700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | 6 | EA | 12 | $ | $ | E700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | 6 | EA | 12 | $ | $ | F700AG | Monthly Lease Service of One Story Relocatable Temporary Building Unit Sized 16'X45' INTENT: SHOP AREA (ROLL-UP DOOR REQUIRED) | 3 | EA | 6 | $ | $ |
| A700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit, 8' x 20' | Contractor to provide unit or similar relocatable as identified per Section C 1501001 and Section J 1501001 -04 & 05 per contract requirements. Delivery scheduled should be completed 30 days after award. Removal shall be completed 15 days after known completion date. | 17 | UN | 12 | $ | $ | B700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | 17 | UN | 12 | $ | $ | C700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | 17 | UN | 12 | $ | $ | D700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | 17 | UN | 12 | $ | $ | E700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | 17 | UN | 12 | $ | $ | F700AH | Monthly Lease Service of One Story Relocatable Temporary Restroom Unit | 9 | UN | 6 | $ | $ |
| A700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | Monthly lease service of a refrigerator 20 feet container. The unit size is approximately length 20 FT × width 8 FT × height 8.5 FT, Power supply: three-phase 200V/400V, Power consumption 12.8 kW, operating temperature: Fahrenheit -68 between |
+68 degrees. Delivery location is designated by ordered the Government. The setup work shall be completed within 30 calendar days after ordered, unless designated date by the Government.
| Removal service shall be completed within 15 days after completion of lease period, unless 3 months extend lease service ordered. | 20 | UN | 3 | $ | $ | B700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | 20 | UN | 3 | $ | $ | C700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | 20 | UN | 3 | $ | $ | D700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | 20 | UN | 3 | $ | $ | E700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | 20 | UN | 3 | $ | $ | F700AJ | Monthly Lease Service of Refrigerator 20 Ft Container | 10 | UN | 3 | $ | $ | ||||||||
| A701 | Install Optional Items | B701 | Install Optional Items | C701 | Install Optional Items | D701 | Install Optional Items | E701 | Install Optional Items | F701 | Install Optional Items | |||||||||||||||||||||||||||||||||||||
| A701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | Install floor carpet tile. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 20,000 | SF | $ | $ | B701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | 20,000 | SF | $ | $ | C701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | 20,000 | SF | $ | $ | D701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | 20,000 | SF | $ | $ | E701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | 20,000 | SF | $ | $ | F701AA | Install Floor Carpet Tile to Relocatable Temporary Building Unit | 10,000 | SF | $ | $ | ||||||||||||
| A701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||||||||||||||||||||||||||||||||||||||||||
| Unit | Install swing door with combination key system. Install location is designated by ordered the Government. The install work shall be completed within 15 calendar days after ordered, unless designated date by the Government. | 168 | EA | $ | $ | B701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | |||||||||||||||||||||||||||||||||||||||||
| Unit | 168 | EA | $ | $ | C701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building | ||||||||||||||||||||||||||||||||||||||||||
| Unit | 168 | EA | $ | $ | D701AB | Install Swing Door with Combination Key System to Relocatable Temporary Building |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .