Appendix 2 Lot Summary.pdf

PDF 529 KB Posted

Attached to
DARLINGTON TRADITIONAL MOWING
Solicitation number
5400026275
Issued by
Richland County, South Carolina

About this file

This is a Lot Summary appendix for the Darlington Traditional Mowing contract opportunity in South Carolina, detailing the scope and production requirements for routine roadside maintenance services across interstate, primary, and secondary highway routes. The contract encompasses eight line items covering routine mowing, guardrail mowing, ditch mowing, and bridge mowing activities across different road classifications. Routine mowing is required for 246.12 acres on interstate routes, 678.10 acres on primary routes, and 1,980.30 acres on secondary routes. Guardrail mowing spans 73,315 linear feet on interstate routes, 46,504 linear feet on primary routes, and 21,529 linear feet on secondary routes. Ditch mowing is specified at 168 acres on interstate routes. The contract requires a minimum of seven tractors, each with a minimum PTO output of 75 horsepower, to meet the production requirements.

The estimated annual costs for the routine mowing, guardrail mowing, and ditch mowing activities total $2,904,980 across the five-year contract term. Work cycles vary by route type, with interstate routes requiring 15 cycles annually, primary routes requiring 25 cycles, and secondary routes requiring 4 cycles. The production schedule indicates that routine mowing activities must achieve specific acreage targets per cycle, with the contractor responsible for maintaining equipment and meeting minimum daily production rates as specified in the contract requirements.

View the file

Other files

File Type Posted
Appendix 1.pdf PDF
Corrected Roads List.xlsx XLSX spreadsheet
Amendment #1 Q & A.docx DOCX document
Appendix 3.pdf PDF
Solicitation 5400026275.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2. LOT SUMMARY

1 Routine Mowing (Interstate: I, R, RS) 15 246.12 Acre 6 1,476.72 7,383.60

2 Guardrail Mowing (Interstate: I, R, RS) 15 73,315.00 Linear Feet 6 439,890.00 2,199,450.00

3 Ditch Mowing (Interstate: I, R, RS) 15 168.00 Acre 1 168.00 840.00

4 Bridge Mowing (Interstate: I, R, RS) 15 Acre 1 - -

5 Routine Mowing (Primary: US, SC) 25 678.10 Acre 6 4,068.60 20,343.00

6 Guardrail Mowing (Primary: US, SC) 25 46,504.00 Linear Feet 6 279,024.00 1,395,120.00

7 Routine Mowing (Secondary: S, SF) 25 1,980.30 Acre 4 7,921.20 39,606.00

8 Guardrail Mowing (Secondary: S, SF) 25 21,529.00 Linear Feet 4 86,116.00 430,580.00

2,904.52 Acre

50 Acre

7 Tractors*

DARLINGTON

Line

Item Annual Total

Estimated

Number of Cycles

Total Routine Acres (per cycle)

Cycle

Time Activity

Route

Type

I

P

S

*Each tractor shall have a minimum PTO output of 75 hp

Quantity Unit 5 Year Total

PRODUCTION & EQUIPMENT REQUIREMENTS

Minimum Daily Production Rate

Minimum Equipment Requirement

File details come from the government source that posted it. Updated .