Appendix 1- Price Breakdown and Calculation of Self-Performed Work- 589A5-22-211 02.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C25526R0150
About this file
This is a Price Breakdown and Calculation Template for Self-Performed/Subcontracted Work specific to solicitation 36C25526R0150 for Project 589A5-22-122, which involves relocating the Office of Information Technology (OIT) from the 6th Floor of Building 1 to Building 21 at the Colmery O'Neil VA Medical Center in Topeka, Kansas. The template is designed for Commercial and Institutional Building Construction Contractors (NAICS code 236220) and enforces a Service-Disabled Veteran-Owned Small Business (SDVOSB) subcontracting limitation, whereby offerors may not pay more than 85% of the adjusted contract amount to non-certified SDVOSB firms. Offerors must itemize personnel costs and material/equipment costs across 30 specification divisions including general requirements, demolition, concrete, masonry, steel, carpentry, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying systems, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, transportation, waterway and marine construction, and process integration.
The template requires offerors to calculate the adjusted contract amount (grand total less material and equipment costs), determine the maximum allowable subcontracting amount (85% of adjusted contract amount), establish the total amount to be performed by SDVOSBs including the offeror's self-performed work plus profit, overhead, and bond, and verify that the percentage of adjusted contract amount paid to subcontractors does not exceed the applicable percentage limit. The authorized representative must certify the accuracy of all representations provided. This appendix must be completed for each bid item submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25526R0150 0002.docx | DOCX document | |
| S04- Pre-Bid Site Visit Sign In Sheet 589A5-22-122.pdf | ||
| S04- Pre-bid visit agenda 589A5-22-122-211 OIT Move to BLDG 21.pdf | ||
| 36C25526R0150 0001.docx | DOCX document | |
| Appendix 2- VAAR 852.219-75 VA Limitations on Subcontracting 02.docx | DOCX document | |
| 36C25526R0150_1.docx | DOCX document | |
| P01- Final DRAWINGS-20240522 589A5-22-122-RelocateOIT Final .pdf | ||
| P01- Bid Specs- 0240522 589A5-22-122 16662201 RelocateOIT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 1- PRICE BREAKDOWN AND CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK
Solicitation: 36C25526R0150 Project: 589A5-22-122, Relocate OIT from 6TH Floor to Building 21 Offerors for Commercial and Institutional Building Construction Contractors (NAICS code 236220) will not pay more than 85% ("Applicable %") of the amount paid by the government to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in VAAR 852.219-73.
Provide a breakdown of material and personnel costs, by specification division listed for the project. Home office overhead, profit/fee, and bond cost shall be added after a subtotal of personnel and material/equipment cost has been calculated. Clearly identify the personnel cost you will be self-performing, and the personnel cost of other similarly situated service-disabled veteran owned small business concerns. Below is the required format.
THIS DOCUMENT MUST BE COMPLETED FOR EACH BID ITEM.
Specification Section
SDVOSB
(Y or N)
Personnel Cost Material/ Equipment Costs
Total
Division 01 General Requirements
| $ |
| $ |
| $ |
Division 02 Demolition
| $ |
| $ |
| $ |
Division 03 Concrete
| $ |
| $ |
| $ |
Division 04 Masonry
| $ |
| $ |
| $ |
Division 05 Misc. Steel
| $ |
| $ |
| $ |
Division 06 Carpentry
| $ |
| $ |
| $ |
Division 07 Thermal and Moisture
| $ |
| $ |
| $ |
Division 08 Openings
| $ |
| $ |
| $ |
Division 09 Finishes
| $ |
| $ |
| $ |
Division 10 Specialties
| $ |
| $ |
| $ |
Division 11 Equipment
| $ |
| $ |
| $ |
Division 12 Furnishings
| $ |
| $ |
| $ |
Division 13 Special Construction
| $ |
| $ |
| $ |
Division 14 Conveying Systems
| $ |
| $ |
| $ |
Division 21 Fire Suppression
| $ |
| $ |
| $ |
Division 22 Plumbing
| $ |
| $ |
| $ |
Division 23 HVAC
| $ |
| $ |
| $ |
Division 25 Integrated Automation
| $ |
| $ |
| $ |
Division 26 Electrical
| $ |
| $ |
| $ |
Division 27 Communications
| $ |
| $ |
| $ |
Division 28 Electronic Safety and Security
| $ |
| $ |
| $ |
Division 31 Earthwork
| $ |
| $ |
| $ |
Division 32 Exterior Improvements
| $ |
| $ |
| $ |
Division 33 Utilities
| $ |
| $ |
| $ |
Division 34 Transportation
| $ |
| $ |
| $ |
Division 35 Waterway & Marine Construction
| $ |
| $ |
| $ |
Division 40 Process Integration
| $ |
| $ |
| $ |
Sub Totals:
| $ |
| $ |
| $ |
Sub Total (Personnel Costs and Material/Equipment Costs)
| Profit: |
| $ |
| Home Office Overhead: |
| $ |
| Bond: |
| $ |
| Grand Total |
| $ |
CALCULATION OF SELF PERFORMED WORK
1. Adjusted Contract Amount (Grand Total less Sub Total of All Material and Equipment Costs):
2. Maximum Subcontracting Amount (Not To Exceed Applicable % of Adjusted Contract Amount ): (Line 1 x Applicable %)
3. Total Amount to be performed by SDVOSB's (Self and any Similarly Situated Entities Personnel Cost + Profit, Overhead, Bond)
4. Total Amount Paid Out to Subcontractors (Line 1-Line 3)
| 5. Percentage of Adjusted Contract Amount considered to be Self Performed (Line 3/Line 1 x 100): |
| $ |
6. Percentage of Adjusted Contract Amount Paid to Subcontractors- Not to Exceed Applicable % (Line 4/ Line 1)
I certify the above representations are true and correct to the best of my knowledge.
Signed:
Date
(Typed Name of Authorized Representative)
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .