This document is an Addendum Number Four for the Centennial Airport Taxiway Rehabilitation project, issued by the Arapahoe County Public Airport Authority in Englewood, Colorado. The addendum modifies the bid opening date to March 29, 2024, at 10:00 a.m. local time, and updates the electronic proposal form on the bidnet website. The project involves rehabilitating Taxiways C and D at Centennial Airport under AIP (Airport Improvement Program) numbers 3-08-0029-061-2024, 0XX-2025, and 0XX-2026.
The addendum includes specific changes to contract drawings, notably modifying the Taxiway D Typical Sections by increasing the Subbase Course (P-154) thickness from 12-inch to 20-inch minimum, and updating Taxiway D1 Joint Details with revised specifications for concrete area removal and replacement. Bidders are required to acknowledge these clarifications and revisions in their proposal submission. The total addendum consists of 3 pages and a revised Addendum Four Proposal Form excel spreadsheet, with detailed technical specifications for pavement rehabilitation, joint repairs, and construction methodologies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTENNIAL AIRPORT
AIP 3-08-0029-061-2024, 0XX-2025, 0XX-2026
REHABILITATE TAXIWAYS C AND D
ADDENDUM NUMBER FOUR
CENTENNIAL AIRPORT
AIP 3-08-0029-061-2024, 0XX-2025, 0XX-2026
REHABILITATE TAXIWAYS C AND D
ADDENDUM NUMBER FOUR
March 25, 2024
GENERAL
1. The Bid Opening date has changed. The updated Proposal Form included in this Addendum #4 shall be used for bidding.
Sealed bids for AIP No. 3-08-0029-061-2024, 0XX-2025, 0XX-206 at Centennial Airport, Englewood, Colorado, will be received by the Arapahoe County Public Airport Authority, 7565
South Peoria Street, Englewood, Colorado 80112, until 10:00 a.m., local time, on March 29, 2024, and then opened, read aloud and canvassed.
2. An updated electronic proposal form titled Addendum #4 has been uploaded to the bidnet website. Please only use this form for bidding.
CONTRACT DRAWINGS
1. PLAN SHEET: TD-C301 TAXIWAY D TYPICAL SECTIONS
REPLACE Drawing TD-C301 dated February 28, 2024, with Drawing TD-C301 dated March 25, 2024. Modify Detail 4 for Construct Taxiway S3 Typical Section by changing the thickness of
Subbase Course (P-154) from 12-inch minimum to 20-inch minimum.
2. PLAN SHEET: TD-CP501 TAXIWAY D1 JOINT DETAILS
REPLACE Drawing TD-CP501 dated February 28, 2024, with Drawing TD-CP501 dated March
25, 2024. Modify Detail 4 stating “CONCRETE AREA TO BE REMOVED AND REPLACED
ACCORDING TO SPECIFICATION P-101” Modify Note 3 to state “THE CAVITY SHALL BE
FILLED WITH MATERIAL PER SPECIFICATION P-101. ANY SPALL REPAIR
MATERIAL ON THE SURROUNDING SURFACES OFTHE EXISTING CONCRETE SHALL
BE REMOVED BEFORE HARDENING HAPPENS. COAT ALL SURFACES WITH TWO-
PART EPOXY JUST PRIOR TO PLACING MATERIAL.”
Total Pages of Addendum Number Four with Enclosures – 3 pages and a revised Addendum Four
Proposal Form excel spreadsheet.
Your acknowledgment that these clarifications/revisions have been incorporated must be noted in the
PROPOSAL submitted with your bid.
END OF ADDENDUM NUMBER FOUR
1 REHABILITATE TAXIWAY D TYPICAL SECTION
NTS
3 T-CAP CONNECTION TO EXISTING ASPHALT
NTS
EXISTING
ASPHALT
5'
NEW PAVEMENT EXISTING PAVEMENT
T-CAP CONNECTION TO MATCH
THICKNESS OF TOP LIFT
MILL EXISTING PAVEMENT TO A
DEPTH TO MATCH THICKNESS
OF TOP LIFT. VERTICAL SAWCUT
EDGE. PAVE NEW SURFACE
COURSE IN ONE CONTINUOUS
LIFT. PROTECT EXISTING
PAVEMENT TO REMAIN.
TYPICAL SECTION NOTES:
1. SURVEY WILL BE REQURIED BEFORE AND AFTER LIFT OF P-401
AT THE POINTS SHOWN ON THE PAVING PLANS.
2. TOP LIFT SHALL BE MIN 2" LIFT.
4 CONSTRUCT TAXIWAY S3 TYPICAL SECTION
NTS
A PAVEMENT EDGE GRADING DETAIL
NTS
PA
VE
M
EN
T
ED
G E
VARIES VARIES℄ TAXIWAY S3
1.5'
(TYP)
1.5'
(TYP)
TD-CU501
TD-CU501
CRUSHED AGGREGATE BASE COURSE
(12-INCH DEPTH) (P-209)
2 RAISE TAXIWAY D TYPICAL SECTION
NTS
VARIES VARIES
VARIES
RECONDITION AND RECOMPACT
EXISTING BASE COURSE (P-209)
ADDITIONAL CRUSHED AGGREGATE
BASE COURSE (DEPTH VARIES) (P-209)
VARIESVARIES
VARIES
VARIES VARIES
12.00' ± SHOULDERING
(SEE NOTE 1)
VARIESVARIES
NOTE:
1. ANY GRADING ALONG THE SHOULDER NECESSARY TO MATCH NEW PAVEMENT
EDGE SHALL MEET THE REQUIREMENTS OF THIS DETAIL AND T-905.
SHOULDERING TO MATCH PAVEMENT EDGE WILL BE PAID FOR UNDER T-905.
℄ TAXIWAY D
℄ TAXIWAY D
A
VARIES
5% MAX
VARIES
5:1 MAX
VARIES5:1 MAX
22.00' TSA
VARIES5% MAX
VARIES5:1 MAX
VARIES
5:1 MAX
22.00' TSA
VARIES
5:1 MAX
VARIES5:1 MAX
22.00' TSA
VARIES5% MAX
VARIES5:1 MAX
VARIES
5:1 MAX
22.00' TSA
TACK COAT BETWEEN LIFTS AND MILLED
SURFACE (P-603)
ASPHALT COURSE (6-INCH OVERALL DEPTH)
(P-401) (MINIMUM 2-INCH LIFT, MAXIMUM 3-INCH
LIFT THICKNESS)
ASPHALT
PAVEMENT
SEEDED
AREA
1.5" VERTICAL
DROP
SEPARATION GEOTEXTILE
(P-209)
UNDERDRAIN
TRENCH,
SEE DETAIL
(TYP)
UNDERDRAIN
TRENCH,
SEE DETAIL
(TYP)
TACK COAT BETWEEN LIFTS (P-603)
ASPHALT COURSE (6-INCH OVERALL
DEPTH) (P-401) (MINIMUM 2-INCH LIFT,
MAXIMUM 3-INCH LIFT THICKNESS)
ASPHALT COURSE (6-INCH OVERALL
DEPTH) (P-401) (MINIMUM 2-INCH LIFT,
MAXIMUM 3-INCH LIFT THICKNESS)TACK COAT BETWEEN LIFTS
AND MILLED SURFACE (P-603)
EDGE LIGHTS
MATCH
EXISTING
(SEE NOTE 1)
ASPHALT COURSE (6-INCH OVERALL
DEPTH) (P-401) (MINIMUM 2-INCH LIFT,
MAXIMUM 3-INCH LIFT THICKNESS)TACK COAT BETWEEN LIFTS
AND MILLED SURFACE (P-603)
12.00' ± SHOULDERING
(SEE NOTE 1)
A
A
5 ASPHALT WIDENING DETAIL
NTS
5' -0
" NEW PAVEMENT
GEOMETRIC EDGE
EXISTING PAVEMENT TO REMAIN
EDGE OF ASPHALT
12" MIN 12" MIN
RECONDITION AND RECOMPACT
EXISTING BASE COURSE (P-209)
VARIES
5% MAX
VARIES5% MAX
EDGE LIGHTS
EDGE LIGHTS
VARIES
5% MAX
NEW PAVEMENT
PROTECT EXISTING
UNDERDRAIN TO
REMAIN (TYP)
SUBBASE COURSE
(20-INCH MINIMUM DEPTH) (P-154)
(SEE NOTE 1)
PROTECT EXISTING
UNDERDRAIN TO
REMAIN (TYP)
NOTE:
1. ANY GRADING ALONG THE SHOULDER NECESSARY TO MATCH NEW PAVEMENT
EDGE SHALL MEET THE REQUIREMENTS OF THIS DETAIL AND T-905.
SHOULDERING TO MATCH PAVEMENT EDGE WILL BE PAID FOR UNDER T-905.
NOTE:
1. ANY GRADING ALONG THE SHOULDER NECESSARY TO MATCH NEW PAVEMENT
EDGE SHALL MEET THE REQUIREMENTS P-152 WITH THE TOP 6-INCHES OF
MATERIAL MEETING REQUIREMENTS OF T-905.
NOTE:
1. ADDITIONAL BORROW MATERIAL UNDER AREAS TO BE PAVED SHALL MEET THE REQUIREMENTS OF P-154.
2. ANY GRADING ALONG THE SHOULDER NECESSARY TO MATCH NEW PAVEMENT EDGE SHALL MEET THE REQUIREMENTS P-152 WITH THE TOP 6-INCHES OF MATERIAL MEETING REQUIREMENTS OF T-905.
UNCLASSIFED EXCAVATION (P-152)
(SEE NOTE 1)
FILENAME: PLOT DATE: PLOT TIME:
JA
C
O
BS
4.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
R
EU
SE
O F
D O
C U
M
EN
TS
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
SHEET
DWG
A
IS
SU
ED
F
O R
B
ID
FEBRUARY 28, 2024
WXYA8401
3/25/2024 10:52 AMWXYA8401-TD-C301
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
JA
C
O
BS
A N
D
IS
N O
T
TO
B E
U
SE
D , I
N W
H O
LE
O
R
IN
P
AR
T, F
O R
A N
Y O
TH
ER
P R
O
JE
C T
W
IT
H O
U T
TH
E
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
JA
C
O
BS
R
EH
AB
IL
IT
AT
E
TA
XI
W
AY
S
C A
N D
D
AI
P 3-
-0
9-
1-
, 0
XX
-2
5, XX
-2
C
EN
TE
N
N
IA
L
AI
R
PO
R T
EN
G
LE
W
O O
D C
O
LO
R
AD
O
TA
XI
W
AY
D
TY
PI
C
AL
S
EC
TI
O N
S
TD-C301
K.
W
IL
SO
N K.
W
IL
SO
N
C . M
C
LA
IN
M
. M C
G U
IR
E
KW
M
D
EN
D U
M
/2 5/
2" MIN
2" M
IN
CONCRETE AREA TO BE
REMOVED AND REPLACED
ACCORDING TO
SPECIFICATION P-101
SAWCUT TO 2" MIN DEPTH.
SAWCUTS TO BE PARALLEL
WITH AND PERPENDICULAR
TO JOINTS
EXISTING CONCRETE
JOINT
3 SPALL REPAIR AT EDGE - PLAN
NOT TO SCALE
2" M
IN
SA
W C
U T
2" M
IN
C
O
VE
R
WIDTH
VARIES
EXISTING CONCRETE
PAVEMENT
CONCRETE AREA TO BE REMOVED
AND REPLACED ACCORDING TO
SPECIFICATION P-101
#4 HORIZONTAL BAR AT 12" O.C.,
TIED TO BENT BARS (SEE NOTE 5)
#4 VERTICAL BAR, BENT
AT TOP, DRILLED AND
EPOXIED INTO EXISTING
CONCRETE MINIMUM OF
6" (SEE NOTE 5)
SEE NOTE 4
WIDTH SHALL BE AT LEAST 2"
BEYOND THE WIDEST PART
OF THE SPALL BEING REPLACED
2" MIN
2" M
IN
CONCRETE AREA TO BE REMOVED
AND REPLACED ACCORDING TO
SPECIFICATION P-101
SAWCUT TO 2" MIN DEPTH.
SAWCUTS TO BE PARALLEL WITH
AND PERPENDICULAR TO JOINTS
4 SPALL REPAIR AT CORNER - PLAN
NOT TO SCALE
EXISTING CONCRETE
JOINTSPALL
SPALL
2" M
IN
SA
W C
U T
2" M
IN
C
O
VE
R
WIDTH
VARIES
2"
MIN
2" M
IN
SPALL
SAWCUT TO 4"
MIN DEPTH.
SAWCUTS TO BE
PARALLEL WITH
AND
PERPENDICULAR
TO JOINTS
EXISTING CONCRETE
JOINT
CONCRETE AREA TO BE REMOVED AND
REPLACED ACCORDING TO
SPECIFICATION P-101
C SPALL REPAIR AT CENTER PANEL - SECTION
NOT TO SCALE
5 SPALL REPAIR AT CENTER PANEL- PLAN
NOT TO SCALE
#4 HORIZONTAL BAR AT 12" O.C.,
TIED TO BENT BARS (SEE NOTE 6)
CONCRETE AREA TO BE REMOVED
AND REPLACED ACCORDING TO
SPECIFICATION SECTION P-101
WIDTH SHALL BE AT LEAST 2"
BEYOND THE WIDEST PART OF
THE SPALL BEING REPLACED
#4 VERTICAL BAR, BENT
AT TOP, DRILLED AND
EPOXIED INTO EXISTING
CONCRETE MINIMUM OF
6" (SEE NOTE 5)
B SPALL REPAIR AT EDGE/ CORNER - SECTION
NOT TO SCALE
B
B
C
SEAL JOINT JOINT SHALL BE SAWED
PER P-605, REMOVING
ALL EXISTING FILLER
1 CONCRETE JOINT SEAL REPAIR
NOT TO SCALE
A
6 JOINT DETAIL - CONCRETE TO ASPHALT
NOT TO SCALE
NOTES:
1. SILICONE SEALANT SHALL BE COMPATIBLE WITH PORTLAND CEMENT
CONCRETE AND ASPHALT CEMENT PAVEMENT.
EXISTING CONCRETE PAVEMENT
1/4" BEVELED EDGE (TYP)
REMOVE ALL CURING
COMPOUND AFTER
SAWCUTTING
4" ASPHALT
SURFACE COURSE
JOINT SEALANT (P-605) MATERIAL
1/4" ± 1/16" BELOW BEVEL
SEE JOINT DETAIL NOTE 1
BACKER ROD MUST BE COMPATIBLE
WITH TYPE OF SEALANT USED AND
SIZED TO PROVIDE THE DESIRED
SHAPE FACTOR AND SIZED FOR THE
JOINT WIDTH
SILCONE SEALANT (P-605)
DEPTH PER MANUFACTURE'S
RECOMMENDATIONS
1- 1/
4" M
IN
1/2" ±1/16" 0" TO -1/8"
REPAIR NOTES:
1. MAKE VERTICAL SAWCUT AT LEAST 2" OUTSIDE
THE SPALLED AREA AND TO A DEPTH OF AT
LEAST 2". SAWCUTS SHALL BE STRAIGHT LINES
FORMING RECTANGULAR AREAS. THE CONCRETE
BETWEEN THE SAWCUT AND THE JOINT OR LIGHT
CAN SHALL BE CHIPPED OUT TO REMOVE ALL
UNSOUND CONCRETE AND AT LEAST 1/2" OF
VISUALLY SOUND CONCRETE. OVERCUTTING IN
ANY DIRECTION IS NOT ALLOWED.
2. THE CAVITY FORMED FROM CONCRETE REMOVAL
SHALL BE THOROUGHLY CLEANED TO REMOVE
ALL LOOSE MATERIAL IMMEDIATELY BEFORE
FILLING THE CAVITY.
3. THE CAVITY SHALL BE FILLED WITH MATERIAL
PER SPECIFICATION P-101. ANY SPALL REPAIR
MATERIAL ON THE SURROUNDING SURFACES OF
THE EXISTING CONCRETE SHALL BE REMOVED
BEFORE HARDENING HAPPENS. COAT ALL
SURFACES WITH TWO-PART EPOXY JUST PRIOR
TO PLACING MATERIAL.
4. WHERE THE SPALL REPAIR ABUTS A JOINT, AN
INSERT OR OTHER BONDBREAKING MEDIUM
SHALL BE USED TO PREVENT BOND AT THE JOINT
FACE. A RESERVOIR FOR THE SEALANT SHALL BE
SAWED TO THE DIMENSIONS REQUIRED. THE
RESERVOIR SHALL BE THOROUGHLY CLEANED
AND SEALED. WHEN THE SPALL IS AT A JOINT, IT
SHALL BE SEALED PER SPECIFICATION SECTION
P-605.
5. SPALL REPAIRS WITH MORE THAN 1 SQUARE
FOOT OF AREA SHALL REQUIRE INSTALLATION OF
REINFORCING BARS. VERTICAL REINFORCEMENT
SHALL HAVE A MINIMUM PENETRATION OF 6" INTO
EXISTING PAVEMENT. EPOXY USED FOR
REINFORCEMENT SHALL MEET THE
REQUIREMENTS OF P-101 SPECIFICATIONS, AND
SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS.
6. THE CONTRACTOR SHALL USE A TEMPLATE THAT
WILL PROTECT EXISTING PAVEMENT TO REMAIN
AND SHALL BE APPROVED BY THE RPR.
7. ALL JOINT THAT REQUIRE REPAIR /
RECONDITIONING SHALL BE WIDENED TO THE
FOLLOWING TOLERANCES:
1/2" EXISTING WIDENED TO 5/8" (+/- 1/8")
5/8" EXISTING WIDENED TO 3/4" (+/- 1/8")
3/4" EXISTING WIDENED TO 7/8" (+/- 1/8")
SEALANT MATERIAL 1/4" TO
3/8" BELOW SURFACE
PCC PAVEMENT SURFACE
BACKER ROD MUST BE COMPATIBLE
WITH TYPE OF SEALANT USED AND
SIZED TO PROVIDE THE DESIRED
SHAPE FACTOR
P-605 SILICONE SEALANT
PER MANUFACTURER'S
RECOMMENDATIONS
JOINT SEALANT RECESSED
1/8" ±1/16" BELOW TOP OF PCC
A CONCRETE JOINT SEALANT DETAIL
NOT TO SCALE
CONSTRUCTION JOINT
1/
4" M
IN
1/4" BEVEL
1/4"
1/ 4"
EXISTING
PCC PAVEMENT SURFACE
JOINT
1/4" BEVEL
2 1/4-INCH BEVEL DETAIL
NOT TO SCALE
FILENAME: PLOT DATE: PLOT TIME:
JA
C
O
BS
4.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
R
EU
SE
O F
D O
C U
M
EN
TS
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D
AT
E N
O
D
SG
N D
R R
EV
IS
IO
N
C H
K
AP
VD
BY
AP
VD
SHEET
DWG
A
IS
SU
ED
F
O R
B
ID
FEBRUARY 28, 2024
WXYA8401
3/25/2024 10:24 AMWXYA8401-TD-CP501
TH
IS
D O
C U
M
EN
T, A
N D
T H
E
ID
EA
S
AN
D
D
ES
IG
N
S
IN
C O
R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U
M
EN
T O
F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C
E, IS
T H
E
PR
O
PE
R
TY
O F
JA
C
O
BS
A N
D
IS
N O
T
TO
B E
U
SE
D , I
N W
H O
LE
O
R
IN
P
AR
T, F
O R
A N
Y O
TH
ER
P R
O
JE
C T
W
IT
H O
U T
TH
E
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
JA
C
O
BS
R
EH
AB
IL
IT
AT
E
TA
XI
W
AY
S
C A
N D
D
AI
P 3-
-0
9-
1-
, 0
XX
-2
5, XX
-2
C
EN
TE
N
N
IA
L
AI
R
PO
R T
EN
G
LE
W
O O
D C
O
LO
R
O
TD-CP501
K.
W
IL
SO
N K.
W
IL
SO
N
C . M
C
LA
IN
M
. M C
G U
IR
E
KW
D
EN
D U
M
/2 5/
TA
XI
W
AY
D
JO
IN
T D
ET
AI
LS
File details come from the government source that posted it. Updated .