ADDENDUM FOUR_APA_BID_Rehabilitate Taxiways C and D_Proposal Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
REHABILITATE TAXIWAYS C AND D
Solicitation number
AIP NO. 3-08-0029-060-2024 and 061-2024
Issued by
Arapahoe County, Eagle Town, Colorado

About this file

This document is an Addendum Four Bid Proposal Form for the Rehabilitation of Taxiways C and D at Centennial Airport in Colorado, funded through AIP (Airport Improvement Program) grants for federal fiscal years 2024-2026. The project encompasses six distinct schedules involving comprehensive airport infrastructure rehabilitation, including work on Taxiways C and D, constructing Taxiway S3, electrical rehabilitation, and reconstructing Taxilane C2. The detailed bid schedule includes multiple line items covering activities such as pavement milling, excavation, asphalt course installation, drainage improvements, electrical work, edge lighting replacement, guidance sign installations, and landscaping tasks. Specific quantities are provided for each task, ranging from linear feet of pipe installation to square yards of pavement work and tonnage of asphalt materials.

The bid proposal is structured as a federal and non-federal cost breakdown, with separate schedules for different project components. While the unit prices are not filled in, the document provides comprehensive quantitative details for each scheduled work item. The project appears to be federally funded through airport improvement grants, with potential cost-sharing between federal and non-federal sources. The rehabilitation work seems extensive, involving multiple phases of taxiway and infrastructure improvements, suggesting a significant airport modernization effort. The document is prepared as a detailed bid schedule that would allow contractors to precisely understand the scope of work and provide competitive pricing for the airport infrastructure project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Estimate

Centennial Airport
Rehabilitate Taxiways C and D
AIP 3-08-0029-061-2024, 0XX-2025, 0XX-2026
Issued for Bid - Addendum #4
PROPOSAL FORM
3/25/24
SCHEDULE I: REHABILITATE TAXIWAYS C & D (FEDERAL)
No.Item No.DescriptionUnitQuantityUnit PriceCost Estimate
1C-100-14.1Contractor Quality Control Program (CQCP)LS1$ - 0
2C-102-5.1Check DamLF72$ - 0
3C-102-5.2Concrete Washout AreaEA3$ - 0
4C-102-5.3Construction MarkersLF4,210$ - 0
5C-102-5.4Erosion Control BlanketSY199$ - 0
6C-102-5.5Inlet ProtectionEA6$ - 0
7C-102-5.6Reinforced Rock Berm for Culvert ProtectionLF75$ - 0
8C-102-5.7Sediment Control LogLF4,803$ - 0
9C-102-5.8Stabilized Staging AreaSY4,900$ - 0
10C-102-5.9Surface RoughingAC0.45$ - 0
11C-102-5.10Vehicle Tracking ControlEA3$ - 0
12C-102-5.11Street MaintenanceLS2$ - 0
13C-105-5.1MobilizationLS1$ - 0
14C-105-5.2Traffic ControlLS1$ - 0
15P-101-5.1Cold Milling (2-inch Depth)SY5,260$ - 0
16P-101-5.2Cold Milling (Variable ~4-inch Depth)SY43,530$ - 0
17P-101-5.3Cold Milling (Variable ~6-inch Depth)SY19,655$ - 0
18P-101-5.4Type 1 Crack RepairLF4,975$ - 0
19P-101-5.5Type 2 Crack RepairLF2,485$ - 0
20P-101-5.6Full-Depth Pavement RemovalSY1,645$ - 0
21P-101-5.7Placement and Compaction of Asphalt MillingsSY8,405$ - 0
22P-101-5.8Concrete Spall RepairSF230$ - 0
23P-101-5.9Asphalt PatchingSY6,845$ - 0
24P-101-5.10Removal of Asphalt MillingsSY925$ - 0
25P-101-5.11Adjust Underdrain CleanoutEA1$ - 0
26P-101-5.18Excess Millings (Haul Off-Site)CY4,800$ - 0
27P-152-4.1Unclassified ExcavationCY35$ - 0
28P-152-4.2Subgrade Mitigation (Unstable Material)SY1,645$ - 0
29P-152-4.4Waste Excavation (Stockpile On-Site)CY5,825$ - 0
30P-152-4.5Waste Excavation (Haul Off-Site)CY330$ - 0
31P-209-5.1Recondition and Recompact Base CourseSY16,925$ - 0
32P-401-8.1Asphalt CourseTON16,830$ - 0
33P-401-8.2Asphalt Binder (76-28)TON1,010$ - 0
34P-603-5.1Emulsified Asphalt Tack CoatGAL4,355$ - 0
35P-605-5.1Route and Reseal Existing Concrete JointsLF3,335$ - 0
36P-605-5.2Concrete to Asphalt Joint SealingLF1,230$ - 0
37P-608-8.1Seal Asphalt MillingsSY4,400$ - 0
38P-608R-8.1Seal Coat with AggregateSY4,045$ - 0
39P-608R-8.2Seal Coat without AggregateSY10,410$ - 0
40P-620-5.1Removal of Pavement MarkingSF2,770$ - 0
41P-620-5.2Temporary Pavement MarkingSF15,640$ - 0
42P-620-5.3Permanent Pavement MarkingSF15,640$ - 0
43P-620-5.4Preformed Thermoplastic Pavement MarkingSF2,800$ - 0
44D-701-5.336-Inch Reinforced Concrete Pipe (Class III)LF24$ - 0
45D-701-5.4Reset 36-inch Flared End SectionEA1$ - 0
46D-701-5.6Riprap - Type LCY65$ - 0
47D-701-5.7Install Restrictor Plate in ARFF Pond Outlet StructureEA1$ - 0
48D-752-5.1Headwall Structure with GuardrailLS1$ - 0
49T-901-5.1SeedingAC0.70$ - 0
50T-905-5.1TopsoilCY570$ - 0
51T-908-5.1MulchingAC0.70$ - 0
Schedule I Total$ - 0
SCHEDULE II: CONSTRUCT TAXIWAY S3 (FEDERAL)
No.Item No.DescriptionUnitQuantityUnit PriceTotal
1C-100-14.1Contractor Quality Control Program (CQCP)LS1$ - 0
2C-102-5.1Check DamLF15$ - 0
3C-102-5.2Concrete Washout AreaEA1$ - 0
4C-102-5.5Inlet ProtectionEA2$ - 0
5C-102-5.6Reinforced Rock Berm for Culvert ProtectionLF15$ - 0
6C-102-5.7Sediment Control LogLF600$ - 0
7C-102-5.8Stabilized Staging AreaSY1,200$ - 0
8C-102-5.9Surface RougheningAC2.00$ - 0
9C-102-5.10Vehicle Tracking ControlEA2$ - 0
10C-102-5.11Street MaintenanceLS0.3$ - 0
11C-105-5.1MobilizationLS1$ - 0
12C-105-5.2Traffic ControlLS1$ - 0
13P-101-5.11Adjust Underdrain CleanoutEA2$ - 0
14P-101-5.12Adjust Sanitary Sewer StructureEA1$ - 0
15P-101-5.13Adjust Water Valve StructureEA1$ - 0
16P-101-5.14Remove Edge Light and Foundation, CompleteEA8$ - 0
17P-101-5.15Remove Edge Reflector, CompleteEA16$ - 0
18P-101-5.16Remove Junction Structure, CompleteEA3$ - 0
19P-101-5.17Remove Guidance Sign and Foundation, CompleteEA2$ - 0
20P-152-4.1Unclassified ExcavationCY1,450$ - 0
21P-152-4.4Waste Excavation (Stockpile On-Site)CY210$ - 0
22P-152-4.5Waste Excavation (Haul Off-Site)CY410$ - 0
23P-154-5.1Subbase CourseCY1,320$ - 0
24P-209-5.2Crushed Aggregate Base CourseCY1,485$ - 0
25P-209-5.3Geotextile FabricSY5,160$ - 0
26P-401-8.1Asphalt CourseTON715$ - 0
27P-401-8.2Asphalt Binder (76-28)TON45$ - 0
28P-603-5.1Emulsified Asphalt Tack CoatGAL215$ - 0
29P-620-5.2Temporary Pavement MarkingSF445$ - 0
30P-620-5.3Permanent Pavement MarkingSF445$ - 0
31D-701-5.124-Inch RCP (Class V)LF536$ - 0
32D-701-5.224-Inch Flared End Section (Class V)EA1$ - 0
33D-701-5.5Connect Pipe to StructureEA1$ - 0
34D-705-5.16-Inch Perforated Underdrain PipeLF1,055$ - 0
35D-705-5.26-Inch Non-Perforated Underdrain PipeLF80$ - 0
36D-705-5.4Underdrain CleanoutEA7$ - 0
37D-705-5.5Underdrain Connection to PipeEA3$ - 0
38D-751Storm Drain Manhole (CDOT)EA1$ - 0
39D-751Aircraft Rated Sanitary ManholeEA1$ - 0
40T-901-5.1SeedingAC1.70$ - 0
41T-905-5.1TopsoilCY1,360$ - 0
42T-908-5.1MulchingAC1.70$ - 0
43L-108-5.1Install Cable, 1/C #8, 5,000V, L-824 Type CLF4,250$ - 0
44L-108-5.2Install No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed in Trench or Above the Duct Bank or ConduitLF1,300$ - 0
45L-110-5.1Install 1-Way, 2-Inch PVC Conduit (DEB)LF1,150$ - 0
46L-110-5.2Install 1-Way, 2-Inch PVC Conduit (CE)LF150$ - 0
47L-125-5.5Install L-861T(L) Taxiway Edge Light on New Base CanEA30$ - 0
48L-125-5.6Reinstall L-853 Taxiway Edge ReflectorEA2$ - 0
49L-125-5.7Install L-858(L) Guidance Sign, Size 1, 2 Module on New FoundationEA1$ - 0
50L-125-5.8Install L-858(L) Guidance Sign, Size 1, 3 Module on New FoundationEA6$ - 0
Schedule II Total$ - 0
SCHEDULE III: TAXIWAY D ELECTRICAL REHABILIATION (FEDERAL)
No.Item No.DescriptionUnitQuantityUnit PriceTotal
1C-105-5.1MobilizationLS1$ - 0
2P-101-5.14Remove Edge Light and Foundation, CompleteEA2$ - 0
3L-108-5.1Install Cable, 1/C #8, 5,000V, L-824 Type CLF19,000$ - 0
4L-108-5.2Install No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed in Trench or Above the Duct Bank or ConduitLF20$ - 0
5L-110-5.1Install 1-Way, 2-Inch PVC Conduit (DEB)LF20$ - 0
6L-125-5.1Remove and Install L-861T(L) Taxiway Edge Light on Existing Base CanEA133$ - 0
7L-125-5.2Remove and Install L-858(L) Guidance Sign, Size 1, 2 Module on Existing FoundationEA11$ - 0
8L-125-5.3Remove and Install L-858(L) Guidance Sign, Size 1, 3 Module on Existing FoundationEA13$ - 0
9L-125-5.4Remove and Install L-804(L) Elevated Runway Guard Light on Existing Base CanEA2$ - 0
10L-125-5.5Install L-861T(L) Taxiway Edge Light on New Base CanEA2$ - 0
11L-125-5.7Install L-858(L) Guidance Sign, Size 1, 2 Module on New FoundationEA1$ - 0
12L-125-5.8Install L-858(L) Guidance Sign, Size 1, 3 Module on New FoundationEA1$ - 0
13L-125-5.9Install Extension/Spacer RingsEA1$ - 0
Schedule III Total$ - 0
SCHEDULE IV: RECONSTRUCT TAXILANE C2 (FEDERAL)
No.Item No.DescriptionUnitQuantityUnit PriceTotal
1C-100-14.1Contractor Quality Control Program (CQCP)LS1$ - 0
2C-105-5.1MobilizationLS1$ - 0
3C-105-5.2Traffic ControlLS1$ - 0
4P-101-5.1Cold Milling (2-inch Depth)SY485$ - 0
5P-101-5.4Type 1 Crack RepairLF50$ - 0
6P-101-5.6Full Depth Pavement RemovalSY2,870$ - 0
7P-152-4.4Waste Excavation (Stockpile On-Site)CY410$ - 0
8P-156-8.1Cement Treated SubgradeSY2,870$ - 0
9P-156-8.2CementTON60$ - 0
10P-209-5.2Crushed Aggregate Base CourseCY570$ - 0
11P-209-5.3Geotextile FabricSY2,970$ - 0
12P-401-8.1Asphalt CourseTON1,025$ - 0
13P-401-8.2Asphalt Binder (76-28)TON65$ - 0
14P-603-5.1Emulsified Asphalt Tack CoatGAL345$ - 0
15P-620-5.1Temporary Pavement MarkingSF230$ - 0
16P-620-5.2Permanent Pavement MarkingSF230$ - 0
17D-705-5.16-Inch Perforated Underdrain PipeLF425$ - 0
18D-705-5.26-Inch Non-Perforated Underdrain PipeLF65$ - 0
19D-705-5.36-Inch Concrete Encased Underdrain PipeLF125$ - 0
20D-705-5.4Underdrain CleanoutEA3$ - 0
21D-705-5.6Underdrain OutfallEA1$ - 0
Schedule IV Total$ - 0
SCHEDULE V: REHABILITATE TAXIWAY C (NON-FEDERAL)
No.Item No.DescriptionUnitQuantityUnit PriceTotal
1C-105-5.1MobilizationLS1$ - 0
2P-101-5.1Cold Milling (2-inch Depth)SY3,270$ - 0
3P-101-5.4Type 1 Crack RepairLF330$ - 0
4P-401-8.1Asphalt CourseTON370$ - 0
5P-401-8.2Asphalt Binder (76-28)TON25$ - 0
6P-603-5.1Emulsified Asphalt Tack CoatGAL170$ - 0
7P-620-5.2Temporary Pavement MarkingSF160$ - 0
8P-620-5.3Permanent Pavement MarkingSF160$ - 0
Schedule V Total$ - 0
SCHEDULE VI: 2025 Mobilization/Remobilization (FEDERAL)
1C-105-5.32025 Mobilization/RemobilizationLS1$ - 0
Schedule VI Total$ - 0
TOTAL FEDERAL CONSTRUCTION COST (SCHEDULE I, II, III, VI, AND VI)$ - 0

TOTAL NON-FEDERAL CONSTRUCTION COST (SCHEDULE V) $ - 0

Bidder's Firm Name Signature Date

File details come from the government source that posted it. Updated .