ANL-70 Request for Quotation 6-B187-Q-00269-00.pdf
PDF 263 KB Posted
- Solicitation number
- 6-B187-Q-00269-00
- Issued by
-
Department of Energy Office of Science
About this file
This is a Request for Quotation (RFQ) from UChicago Argonne, LLC, operator of Argonne National Laboratory, for Commercial Mechanical and Electrical Services to support the Building Maintenance Department. The RFQ was issued on June 29, 2026, with quotations due by July 2, 2026 (Inquiry No. 6-B187-Q-00269-00). The contract encompasses two line items for the base period (July 2026 – June 2027): labor and service hours and parts and materials for commercial mechanical and electrical services, with pricing and quantities detailed in Appendix C-Price Schedule. The contract includes two option years (OY1: July 2027 – June 2028 and OY2: July 2028 – June 2029), each with corresponding labor and materials line items. Cash terms are Net 30 days, and the contract is exempt from Illinois Occupation and Use Taxes and Manufacturers and Retailers Excise Taxes.
Quotation responses must include: the signed RFQ page one (ANL-70), completed Appendix C Price Schedule, completed Representations and Certifications (ANL-70B), completed High-Risk Job Safety Analysis (ANL-209H), completed Service Contract Act Certification (PD-120), Certificate of Insurance listing UChicago Argonne, LLC, The University of Chicago, and the US Government as additional insureds with primary coverage, and published price list or redacted invoice demonstrating price reasonableness. The RFQ is subject to Argonne Terms and Conditions for Labor Hour and Time and Materials Contracts (ANL-528, dated April 24, 2024), High Risk On-Site Supplemental Conditions (ANL-366H, dated October 1, 2024), and other attached appendices. No on-site work shall commence until the contractor receives a "Notice to Proceed" from the Argonne Procurement Representative, Jazlyn Mangis (jmangis@anl.gov, 630-252-6884). Quoters must identify any available DOE discounts or GSA contract pricing applicability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANL-70 (February 22, 2013)
UCHICAGO ARGONNE, LLC
OPERATOR OF
ARGONNE NATIONAL LABORATORY
BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439
(CONTRACT NO. DE-AC02-06CH11357)
REQUEST FOR QUOTATION
THIS IS NOT AN ORDER
NOTICE:
1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.
2. The right is reserved to accept minor deviations from specifications herein listed or referenced.
3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.
4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.
5. Terms and Conditions referenced below will apply to any resulting Purchase Order.
Address Reply To: Jazlyn Mangis
PHONE: (630)252-6884
Date 06/29/2026 Inquiry
No.
6-B187-Q-00269-00 Quotation must be received by: 07/02/2026
ITEM
NO.
QUANTITY DESCRIPTION
UNIT
PRICE
TOTAL
Please furnish quotation to supply the materials and/or services indicated on page two
(2), review the applicable documentation, and return any required documents to jmangis@anl.gov.
Any inquiries are to be directed to Jazlyn Mangis, (630) 252-6884, jmangis@anl.gov
Offeror to furnish a published price list to support quoted pricing.
The attached RFP/RFQ and only Argonne Terms and Conditions will govern any resultant order.
Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from
Manufacturers and Retailers Excise Taxes.
Cash Terms Net 30 days
COMPLETE AND RETURN ONE COPY
PLEASE MARK “NO BID” IF YOU CANNOT QUOTE DATE AUTHORIZED SIGNATURE
mailto:jmangis@anl.gov mailto:jmangis@anl.gov
The following applicable documentation is attached hereto and made a part hereof:
1. Appendix “A” Argonne Terms and Conditions For Labor Hour and Time and Materials Contracts, ANL-528, dated April 24, 2024. Review and Accept
2. Appendix “B” Argonne Statement of Work, SOW, dated June 11, 2026. Review and Accept
3. Appendix “C” Argonne Price Schedule, dated June 11, 2026. Complete and Return
4. High Risk On-Site Supplemental Conditions, ANL-366H, dated October 1, 2024. Review and Accept
5. High-Risk Job Safety Analysis (JSA), ANL-209H, dated August 7, 2024. Complete and Return
6. Pre-Award Information, Representations and Certifications, ANL-70B, dated January 13, 2025. Complete and Return
7. Service Contract Labor Standards Certification, PD-120, dated September 19, 2024. Complete and Return
Instructions for High-Risk Service on the Argonne Site
The following must be completed and returned for the instructions:
1. Completed High-Risk Job Safety Analysis Form, ANL-209H, is to be sent to the Argonne Procurement Representative, Jazlyn Mangis via e-mail at jmangis@anl.gov.
2. Insurance Certificate as noted in Section Three (3) of Form ANL-366H is to be sent to the Buyer, Jazlyn Mangis via e-mail at jmangis@anl.gov and shall provide by appropriate language that The UChicago Argonne, LLC, The University of Chicago and the US Government are additional insureds;
that the insurance afforded by such policies is primary insurance and, that all rights of the insurer for contribution from other insurers of The UChicago
Argonne, LLC, The University of Chicago and the US Government are waived. Please make sure the Certificate Holder name is UChicago Argonne, LLC operator of Argonne National Laboratory.
No on-site work shall begin until a “Notice to Proceed” is received by the contractor from the Argonne Procurement Representative.
Provide the following with your quotation:
1. Signed Page one of the RFQ (ANL-70).
2. Completed Appendix “C” Price Schedule.
3. Completed Representations and Certifications (ANL-70B).
4. Completed JSA (ANL-209H).
5. Completed Service Contract Act Certification (PD-120).
6. Certificate of Insurance
7. Provide a published price list or a redacted invoice showing pricing for the quoted, to prove price reasonableness.
8. Are there any available discounts for DOE or does this order fall under GSA contract pricing (if yes, please include contract # and expiration date)?
ITEM NAME MODEL/PART
QTY UNIT UNIT PRICE DESCRIPTION
0001 Labor & Service
Hours - BY
Time 1 Each See “Appendix
C-Price
Schedule”
Labor and Service Hours for Commercial Mechanical and Electrical Services, as necessary to support the Building Maintenance Department, per the attached
Appendix B-SOW and Appendix C-Price Schedule.
POP: July 2026 – June 2027
0002 Parts & Materials
- BY
Materials 1 Each See “Appendix
C-Price
Schedule”
Parts and Materials for Commercial Mechanical and Electrical Services, as necessary to support the Building Maintenance Department, per the attached
Appendix B-SOW and Appendix C-Price Schedule.
POP: July 2026 – June 2027
The Laboratory may increase the quantity of supplies or extend the term of this contract is accordance with option items quantities and option prices indicated herein.
OPTION
ITEM
NAME MODEL/PAR
T#
QTY UNIT UNIT PRICE DESCRIPTION OPTION
EXPIRATION
0003 Labor & Service
Hours - OY1
Time 1 Each See
“Appendix C-
Price
Schedule”
Labor and Service Hours for Commercial Mechanical and
Electrical Services, as necessary to support the Building
Maintenance Department, per the attached Appendix B-
SOW and Appendix C-Price Schedule.
POP: July 2027 – June 2028
Option Year 1 -
Time
(06/30/2028)
0004 Parts &
Materials - OY1
Materials 1 Each See
“Appendix C-
Price
Schedule”
Parts and Materials for Commercial Mechanical and
Electrical Services, as necessary to support the Building
Maintenance Department, per the attached Appendix B-
SOW and Appendix C-Price Schedule.
POP: July 2027 – June 2028
Option Year 1 -
Materials
(06/30/2028)
0005 Labor & Service
Hours - OY2
Time 1 Each See
“Appendix C-
Price
Schedule”
Labor and Service Hours for Commercial Mechanical and
Electrical Services, as necessary to support the Building
Maintenance Department, per the attached Appendix B-
SOW and Appendix C-Price Schedule.
POP: July 2028 – June 2029
Option Year 2 -
Time
(06/30/2029)
0006 Parts &
Materials - OY2
Materials 1 Each See
“Appendix C-
Price
Schedule”
Parts and Materials for Commercial Mechanical and
Electrical Services, as necessary to support the Building
Maintenance Department, per the attached Appendix B-
SOW and Appendix C-Price Schedule.
POP: July 2028 – June 2029
Option Year 2 -
Materials
(06/30/2029)
SOURCE TITLE AND DATE
Appendix A-Labor Hour Appendix A Terms and Conditions for Labor Hou (04/24/24)
Special CI-SCA-CERT Service Contract Act Certification (09/19/24)
ANL-70B Reps and Certs Long Reps and Certs Long Form ANL-70B (01/13/25)
ANL-366H (on-site high risk) High Risk Work by Contractors on the Argonne (10/01/24)
File details come from the government source that posted it. Updated .