ANL-70 Request for Quotation (01D).doc

DOC document 284 KB Posted

Attached to
Cooling Tower On Site Repair - SEE DESCRIPTION & ATTACHMENTS (G4-324032. 1)
Solicitation number
5-B193-Q-00154-00
Issued by

About this file

This is a Request for Quotation (RFQ) issued by UChicago Argonne, LLC/Argonne National Laboratory seeking cooling tower repair parts and services for Building 371. The RFQ requires vendors to provide various equipment including S300 components, tie rod replacements, mechanical vibration switches, flex element kits, and hardware kits, along with associated installation labor, crane rental services, and stainless steel stiffeners. The work includes on-site installation requiring high-risk work compliance and contractor insurance certificates.

Responses are due by January 28, 2025, with pricing to be provided in US dollars on a firm fixed-price basis. Terms are net 30 days, FOB destination. The contract will be subject to Argonne Terms and Conditions (ANL-71-COM dated 02/13/2023) and High Risk Work Supplemental Conditions (ANL-366H dated 10/01/2024). Vendors must submit signed documentation, detailed pricing for all line items, and certificates of insurance naming UChicago Argonne LLC, University of Chicago, and US Government as additional insureds. Work cannot begin until the contractor receives a "Notice to Proceed" after submitting required safety analysis forms and insurance documentation.

View the file

Other files

File Type Posted
Appendix A-71COM-13-FEB-2023.PDF PDF
ANL-366H (on-site high risk)-01-OCT-2024.PDF PDF
Scope of Work.docx.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANL-70 (February 22, 2013)

UCHICAGO ARGONNE, LLC

OPERATOR OF

ARGONNE NATIONAL LABORATORY

BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439

(CONTRACT NO. DE-AC02-06CH11357)

REQUEST FOR QUOTATION

THIS IS NOT AN ORDER

NOTICE:

1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.

2. The right is reserved to accept minor deviations from specifications herein listed or referenced.

3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.

4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.

5. Terms and Conditions referenced below will apply to any resulting Purchase Order.

Address Reply To:
Annette Wegrzyn
PHONE:
(630)252-2794
Date
12/03/2024
Inquiry No.
5-B193-Q-00154-00
Quotation must be received by:
1/28/2025
ITEM NO.
QUANTITY
DESCRIPTION
UNIT PRICE
TOTAL

Please furnish a firm fixed price quotation of your best and final price in US Dollars to supply the materials and/or services as indicated on page 2 and in accordance with the Argonne National Laboratory Scope of Work entitled, Building 371 Cooling Tower Repairs, dated December 3, 2024.

All applicable documentation to this solicitation is identified on page two (2). Any inquiries are to be directed to Annette Wegrzyn at awegrzyn@anl.gov. Please provide your response no later than end of day, 1/28/2025.

Offerors must provide ALL the following to support their price:

A. Signed page 1

A. Proposal & pricing entered on line item boxes on page 2

Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from Manufacturers and Retailers Excise Taxes.

We quote you F.O.B. Destination. Shipment can be made in days from receipt of order.

Cash Terms
Net 30 days
Will Ship Via*

Date

*If Shipment will not be made via FedEX, UPS, or USPS, Please provide estimate of weight and volume _________________________________________ cft

COMPLETE AND RETURN ONE COPY

PLEASE MARK “NO BID” IF YOU CANNOT QUOTE

AUTHORIZED SIGNATURE

ITEM
NAME
MODEL/PART#
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
DESCRIPTION
0001
S300
FAPBRANDED1
2
Each

S300 Find # D01,D05, and D36 with attaching hardware to install per cell.

0002
S304
FAPBRANDED1(1)
3
Each

S304 Tie Rod Replacement for Tower Model NC8407, Find D27. Includes Tie Rods, Cable Ties, and attaching hardware to install Per Cell.

0003
ME Components
FAPBRANDED1(2)
2
Each

ME COMPONENTS MIA 22&2400GR 364T-365T, Hardware kits

0004
Motor Hold-Down Hardware Kit
B95449
2
Each

Motor Hold-Down Hardware Kit for motor frame sizes 324T thru 365T used on NC100 thru NC8300 and AV towers. Kit includes stainless S300 bolts, washers, nuts, shim set and Loctite sealer, per cell. S300 spirol pins for the Geareducer are also included.

0005
Series 22.1T, 22.2, 22.3, 2200
C24687
2
Each

Series 22.1T, 22.2, 22.3, 2200, 2250 and 2400, hardware and shims for securing gear box to mounting base. This kit also works for the series 20, 20T, 20.1, 20.2, 1800 and 2000.

0006
IMI 685A Mechanical vibration
2558910
3
Each

IMI 685A Mechanical vibration switch, DPDT, manual reset, 30 foot cord set, factory calibration (CSA/UL CE)

0007
flex element kit
E48593
3
Each

Flex element kit for MC09 coupling. Includes flex element (tire), clamp rings, and SS hardware.Flex element kit for MC09 coupling. Includes flex element (tire), clamp rings, and SS hardware.

0008
Seal spacer O ring
210302
1
Each

Seal, spacer and O-ring kit for cell 3 oil seal change

0009
Labor
NA
1
Each

labor associated with installation of parts quoted

0010
crane lift
NA
4
Each

Crane rental fee

0011
Angle modification labor
NA
1
Each

Additional labor to install 3x3 angle material on towers for reinforcement.

0012
3x3x72 Angle
FAPBRANDED2
3
Each

3x3x72¿ SS 8GA stiffeners for D01. Includes all attaching hardware

TOTAL

Applicable Documentation: The following applicable documentation is attached hereto and made a part hereof:

1. Appendix "A" Argonne Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated 02/13/2023 (Review and Communicate Acceptance)

2. High Risk Work by Contractors on the Argonne Site Supplemental Conditions, ANL-366H, dated 10/01/2024 (Review and Communicate Acceptance)

3. Argonne National Laboratory Scope of Work entitled, Building 371 Cooling Tower Repairs Scope of Work, dated 12/03/2024 (Review)

Offeror to Provide and Address the Following:

A. Proposal

B. Certificate of Insurance meeting or exceeding our minimum insurance thresholds in the attached document, High Risk Work by Contractors on the Argonne Site Supplemental Conditions, ANL-366H, dated 10/01/2024

All quotations shall be responsive to the terms and conditions made a part of this solicitation. Any exceptions taken shall be detailed and refer to specific Articles of the Applicable Documentation.

Contractor's work on the Argonne site is subject to compliance with the ES&H requirements identified in item 2 under Applicable Documentation.

The contractor’s installation/service personnel are responsible for the removal and off-site disposal of any debris resulting in the performance of this work.

Instructions for High Risk Service on the Argonne Site: The High Risk Work By Contractors On The Argonne Site Supplemental Conditions is attached hereto and made a part hereof:

1.

2. Completed High Risk Job Safety Analysis Form, ESH-209, is to be sent to the Argonne Procurement Representative, Annette Wegrzyn at awegrzyn@anl.gov. For site access and for coordination/scheduling of delivery, the Argonne Technical Representative must obtain a fully executed copy of the ESH-209 form.

1. Insurance Certificate, as noted in Section Three (3) of Form ANL-366H, is to be sent to the Argonne Procurement Representative, Annette Wegrzyn, via e-mail at awegrzyn@anl.gov and shall provide by appropriate language that The UChicago Argonne, LLC, The University of Chicago and the US Government are additional insureds; that the insurance afforded by such policies is primary insurance and, that all rights of the insurer for contribution from other insurers of The UChicago Argonne, LLC, The University of Chicago and the US Government are waived.

No on-site work shall begin until a “Notice to Proceed” is received by the contractor from the Argonne Procurement Representative.

A “Notice to Proceed” will not be issued until both the High Risk Job Safety Analysis Form, ESH-209, and the required Insurance Certificate is obtained.

SOURCE
TITLE AND DATE
Appendix A-71COM
Appendix A Terms and Conditions for Commercia (02/13/23)
ANL-366H (on-site high risk)
High Risk Work by Contractors on the Argonne (10/01/24)

PAGE

File details come from the government source that posted it. Updated .