Amendment W912WJ26QA109-0001.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ26QA109
About this file
This is a Standard Form 30 (SF 30) Amendment to Solicitation W912WJ26QA109, issued by the U.S. Army Corps of Engineers (USACE), New England District, on June 2, 2026. The amendment adds previously omitted Sections L and M to the solicitation without extending the closing date, which remains June 17, 2026 at 5:00 PM Eastern Time. Vendors must acknowledge receipt of this amendment prior to quote submission through completion of the SF 30, acknowledgment on each quote copy, or separate written/electronic communication referencing the solicitation and amendment numbers.
The amendment establishes critical requirements for vendors responding to this Request for Quotations (RFQ) under Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 13. Vendors must be registered in the System for Award Management (SAM.gov) with an active status and must provide their Unique Entity Identifier (UEI) and CAGE code. Site visits are highly recommended, and the evaluation criteria are technical capability, price, and past performance. Quotes must be firm fixed price with complete bid schedules for all tasks and years, include signed copies of all material amendments, and provide sufficient documentation for Government evaluation. For construction contracts, bonding requirements apply: contracts at or above $150,000 require both a Payment Bond (or Irrevocable Letter of Credit) at 100% of contract price and a Performance Bond at 100% of contract price; contracts between $35,000 and $150,000 require a Payment Bond or Irrevocable Letter of Credit at 100% of contract price. The Government intends to award without discussions but reserves the right to conduct discussions and quote verification if deemed necessary. All questions should be directed to Contract Specialist Jennifer M. Samela at 978-318-8324 or Jennifer.M.Samela@usace.army.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments_Amendment.pdf | ||
| Amendment W912WJ26QA109-0003.pdf | ||
| Amendment W912WJ26QA109-0002.pdf | ||
| Solicitation Survey 26QA109.pdf | ||
| Attachments.pdf | ||
| Solicitation W912WJ26QA109.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 8
0001 02 JUN 2026
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:
978-318-8324
SCD: PAS:
W912WJ26QA109
02 JUN 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
Amendment is necessary to include Sections L and M as they were omitted from the solicitation.
Closing remains June 17, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
JENNIFER SAMELA
02 JUN 2026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been added to:
INSTRUCTIONS TO VENDORS:
VENDORS SUBMITTING A QUOTE IN RESPONSE TO A SOLICITATION ARE RESPONSIBLE
FOR ADHERING TO ALL INSTRUCTIONS AND TERMS AND CONDITIONS INCLUDED IN THE
SOLICITATION. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-
RESPONSIVE
INFORMATION:
1. This is a Request for Quotations (RFQ) in accordance with Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 13.
2. The Government may perform a comparative evaluation (comparing quotations to each other) to select the contractor that is best suited and provides the best value, considering the evaluation factors in this solicitation.
3. Evaluation factors will be technical, price, and past performance. Failure to provide sufficient documentation for Government evaluation for these factors with quote submission shall result in a quote being deemed non-responsive.
4. This work is considered "new".
5. All responsible sources may submit a quote which, if timely received, must be considered by the Agency.
6. The Government may request that a vendor respond to a Quote Verification after the solicitation closes, but prior to award. The vendor shall respond in sufficient detail to all questions or statements no later than the response date and time listed in the correspondence. Failure to do so may result in quotes being deemed non-responsive and removed from consideration. The Government is under no obligation to provide extensions for responses.
QUESTIONS REGARDING SOLICITATIONS:
1. Questions regarding the solicitation shall be directed to the Contract Specialist:
W912WJ26QA1090001
a. Name: Jennifer M. Samela
b. Phone: 978-318-8324
c. Email: Jennifer.M.Samela@usace.army.mil
2. Technical Points of Contact shall not provide responses to interested vendors.
3. Please direct questions to the Contract Specialist. Any information received at the site visit which conflicts with this solicitation should be brought to the attention of the Contract Specialist.
The solicitation and resulting contract shall be the governing document in all cases.
QUOTE SUBMISSION:
1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments.
2. The Government is under no obligation to consider any quote received after the solicitation closing date or time.
3. Interested vendors shall submit signed copies of all material amendments (SF30) with their quotes. Failure to do so will result in quotes being deemed non-responsive and removed from consideration.
BID SCHEDULES:
1. If a Bid Schedule is included in the solicitation, vendors shall complete the bid schedule in its entirety (all tasks, all years).
2. Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced. Blank entries will not be considered and will result in quotes being deemed non-responsive.
3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive.
4. When Bid Schedules or Contract Line Item Numbers (CLINs) require unit pricing and total amounts, unit pricing shall govern in case of discrepancy between unit prices and total amounts.
SITE VISITS:
1. SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE.
2. If date(s)/time(s) for site visits are included in the solicitation, then interested vendors will be permitted to visit the site during those dates/times. No other dates/times will be permitted for site visits.
3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit.
4. No site visits will be permitted AFTER a solicitation closes.
BONDING:
1. In accordance with FAR 28.101-1(a), the Contractor will NOT be required to provide a Bid Guarantee.
2. In accordance with FAR 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond.
This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond.
This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
3. In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above, but not exceeding $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond.
This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
**No Payment Protections Required for construction contracts less than $35,000**
4. Prior to award, the Government may request that the Contractor provide a Letter of Bond Ability issued by a Surety that is listed on US Treasury Circular 570 (https://www.fiscal.treasury.gov /surety-bonds/list-certified-companies.html).
Letter of Bond Ability shall be issued to the Contractor and shall state that the Contractor is pre-qualified for bonding, include the single and aggregate bond limits that the bond company will support, and provide contact information of the bond agent or attorney-in-fact.
Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company name and contact information: ____________________________________________________________
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote. Registered is considered when a SAM registration is marked "Active".
3. Representations and Certifications are to be completed in www.sam.gov.
NOTE: SAM.gov registration takes approximately 3 weeks (Unique Entity Identified (UEI) 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks.
4. Provide business Unique Entity Identifier (UEI): _______________________________
5. Provide business CAGE code: __________________________________
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been added to:
Evaluation--Noncommercial Acquisitions under Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 13
1. Addendum. The Government may perform a comparative evaluation (comparing quotes to each other) to select the contractor that is best suited and can perform work at a fair and reasonable price, considering the evaluation factors in this solicitation.
a. Potential vendors are notified that the evaluation factors shall be technical, price, and past performance.
b. By submission of its quote, the vendor agrees to comply with all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors.
2. Evaluation factors. The Government will award a Purchase Order resulting from this solicitation to the responsible vendor whose quotation conforms to the solicitation and is most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate quotes:
a. Technical
b. Price
c. Past Performance
3. Options (if applicable). The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. The evaluation of options does not obligate the Government to exercise the option(s).
4. Evaluation process.
a. Step 1 - Evaluate all quotes for responsiveness and reject quotes not considered responsive.
b. Step 2 - The Government may perform a comparative evaluation of all quotes deemed responsive.
c. Step 3 - Contracting Officer will follow award process.
A. Action/Step-1 (Responsiveness).
i. Initially, the Government will verify the quote is signed, via SF18, blocks 14-16, and signed copies of all material amendments have been submitted. If the SF18 is signed and signed copies of material amendments have been included, the evaluation will continue. If the SF18 blocks 14-16 are not completed, and/or material amendments not signed and returned, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation.
ii. Government will then verify vendor's quote has fully provided all requirements stated above in Section L. If the quote schedule is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation.
iii. Government will then verify quoter's Technical factors information requested in the Solicitation Survey is fully provided. Per solicitation requirements, if the survey included with the solicitation documents is not completed, the quote will be determined non-responsive, and quote will be eliminated from any further evaluation.
iv. If quoter is found to be responsive from information provided the evaluation will continue to the next Action/Step (Review Technical Factors Information).
B. Action/Step 2 (Review Technical Factors Information).
i. Government will review key personnel, subcontractor teaming arrangements, documents, and certifications as they relate to the solicitation. Subcontractor teaming arrangements shall be considered a confirmation from a subcontractor that they agree to perform the work required by the solicitation in conjunction with the prime contractor.
C. Action/Step-3 (Price Evaluation).
i. The Government shall rank all responsive quotes from the lowest price to the highest price received, including any options if applicable.
ii. Only firm fixed price quotes will be evaluated. A quote using a sliding price scale or subject to escalation based on any contingency will not be accepted and will be considered non-conforming to this solicitation.
iii. A quoter's pricing will be determined by multiplying any quantities identified in the pricing schedule by the proposed unit price for each task or line item to confirm the extended amount for each. The price evaluation will document reasonableness and affordability of the total evaluated price.
D. Action /Step 4 (Past Performance).
i. The Government shall review the recent and relevant past performance as listed in the survey.
Recent contracts are those within the past three years. "Relevant" means the performance being considered must have a logical connection to the work described in the solicitation. Normally, relevance would include such aspects as the product or service similarity, product or service complexity, contract type, and magnitude. Magnitude is important because it will define not only the scope but project similarity to this requirement.
ii. Vendors whose System for Award Management (SAM) registration includes a Responsibility /Qualification record due to termination for cause or default, or administrative agreement, may be determined unacceptable and quote will be eliminated from any further evaluation.
iii. Only past performance of the prime contractor shall be considered. Past performance of subcontractors shall not be considered unless a teaming arrangement is submitted in response to the Request for Quotation.
iv. Quoter's shall insert proposed unit and extended totals for each task or line item as required.
Any quote that fails to cite a price for each item or fails to make an entry that indicates service will not be provided for an Item will be rejected as non-conforming to this solicitation. Quotes that fail to price all items or indicate that the amount is $0 or Not Separately Priced (NSP) will be rejected as nonconforming to this solicitation.
v. After final price ranking is complete the Contracting Officer will continue to the next Action/Step (Award Process).
E. Action/Step-4 (Award Process).
i. The Contracting Officer may conduct a comparative evaluation of all responsive quotes. A Purchase Order will be awarded to the vendor that submitted a responsive quote with acceptable past performance that includes fair and reasonable pricing, and who is considered technically capable of performing the work as required by the solicitation.
ii. Quoters are cautioned to submit sufficient information for evaluation. Communication conducted to resolve minor or clerical errors would not constitute discussions and the contracting officer reserves the right to award a contract without the opportunity for quote revisions.
iii. The Government intends to award a contract without discussions with respective quoters. The Government, however, reserves the right to conduct discussions if deemed in its best interest.
File details come from the government source that posted it. Updated .