Amendment No_ 4.pdf
PDF 129 KB Posted
- Attached to
- Professional Engineering Design Services for Winn Road at South Paulding High School Driveway
- Solicitation number
- PE-77892-NONST-2026-000000068
- Issued by
- Jones County, Georgia
About this file
This is Amendment No. 4 to an advertised contract issued by Paulding County for professional engineering design services. The project concerns the Winn Road at South Paulding High School Driveway/Intersection Improvement Project, with bid number 26016-1509 and a letting date of February 13, 2026. The amendment clarifies a specific requirement regarding the technical proposal page limit, confirming that current workload is counted toward the maximum allowable pages for the technical submission.
The amendment provides a single substantive clarification to the contract specifications without introducing new pricing terms, set-asides, or other modifications to the original solicitation documents. Bidders are required to acknowledge receipt of this amendment by checking the appropriate certification space on the amendment certification page and are responsible for incorporating any necessary changes into their proposals in ink.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No 1.pdf | ||
| Amendment No 2.pdf | ||
| Amendment No 3 (002).pdf | ||
| 26016_1509 ADVERTISEMENT gfj.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 9, 2026
AMENDMENT TO ADVERTISED CONTRACT
PROJECT NAME: Professional Engineering Design Services for Winn Road at South Paulding High School D/W Intersection Improvement Project
BID NUMBER: 26016-1509
COUNTY: PAULDING
AMENDMENT NUMBER: 4
LETTING DATE: February 13, 2026
THE FOLLOWING AMENDMENTS ARE HEREBY MADE TO THIS CONTRACT.
THE BIDDER IS RESPONSIBLE FOR MAKING ANY NECESSARY CHANGES IN
INK IN THE PROPOSAL. BIDDER SHALL ACKNOWLEDGE THIS AMENDMENT
BY CHECKING THE APPROPRIATE SPACE ON THE AMENDMENT
CERTIFICATION PAGE.
Included in this Amendment:
• Please clarify whether or not current workload counts towards the page limit for technical proposal.
Yes, current workload does count toward the page limit of the technical proposal.
| February 9, 2026 |
| AMENDMENT TO ADVERTISED CONTRACT |
File details come from the government source that posted it. Updated .