Amendment 6 - Q&A #2.doc
DOC document 71 KB Posted
- Solicitation number
- 300000252585653
- Issued by
- Missouri
About this file
This is an Amendment 6 Questions and Answers document for Missouri Department of Transportation (MoDOT) Solicitation 0000000281, addressing clarifications regarding the procurement of modified Wide Body Buses for the State Transit Program in partnership with the Missouri Health and Transportation Commission (MHTC). The contract encompasses three floor plan configurations (GG, HH, and II) and requires bidders to submit pricing for all three floor plans to be eligible for award. Bidders may choose to submit bids for either steel cage or fiberglass composite bus construction, but must provide complete pricing across all floor plan options. The contract term extends for three years from the executed contract date with two optional one-year renewal periods. Questions regarding the solicitation must be submitted no later than ten calendar days prior to the due date, and bids may be submitted electronically through MissouriBUYS Powered By MOVERS or by mail (USPS, UPS, or FedEx), with hard copy submissions requiring advance notification to the buyer of record, Ashten Lorts, at least five days before the closing date.
Regarding pricing terms, MoDOT has clarified that bids remain valid for 90 days from bid opening, during which time the agency will make award decisions. Once a bid is accepted, all pricing becomes firm for the specified contract period. The escalation clause prohibits any price increases during the first six months of the original contract period or, if applicable, the first six months of any contract renewal or escalation period. The document specifies that only the response price column requires completion in bidding templates, and clarifies that MoDOT is not accepting alternate bids, meaning bidders should disregard sections of the specification related to alternates. Additionally, MoDOT clarified that door lock systems must allow all vehicle doors to be lockable from inside the vehicle when in drive mode or via fob/remote control when outside the vehicle.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MODOT 0000000281SL_7_SUPPLIER.pdf | ||
| Amendment 7 - Q&A.docx | DOCX document | |
| Amendment 05 - Questions & Answers.docx | DOCX document | |
| Amendment 2 - Questions & Answers.xlsx | XLSX spreadsheet | |
| Amendment 1 - Questions & Answers.xlsx | XLSX spreadsheet | |
| Fiberglass Composite Bus Specifications.docx | DOCX document | |
| Steel Cage Bus Specifications.docx | DOCX document | |
| WBC-GG Floor Plan.pdf | ||
| WBC-HH Flat Floor Plan.pdf | ||
| WBC-II Flat Floor Plan.pdf | ||
| Amendment 6 - Q&A #1.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDOT 0000000281
APPROVED EQUALS / QUESTIONS / CLARIFICATIONS
06/01/26 The following item refers to the MODOT 0000000281SL_SUPPLIER.pdf
| Page |
| Section |
| Question |
| Answer |
| 10 & 15 |
| 3.1 Line Information and 4.2 Alternate Lines Template |
| Please clarify what “Response Minimum Release Amount” relates to. |
| The only relevant or required column to be completed is response price. |
| 11 |
| Door Lock System – Fiberglass & Metal Spec |
| Please clarify what system is required or are you looking for each door to have a lock. |
| MoDOT is just looking that all doors be lockable from inside the vehicle, when the vehicle is placed in drive or by fob/remote when outside the vehicle. |
| 15 |
| 4.2 Alternate Lines Template |
| Under Response Price, please clarify where the “cost factors table” can be found. |
| MoDOT is not allowing alternates, this section can be ignored. |
| 22 & 30 |
| Preparation of Bids |
Escalation Clause Please clarify the contradicting statements below in regard to increases in pricing.
7. Bids, including all pricing therein, shall remain valid for 90 days from bid opening unless otherwise indicated. If the bid is accepted, the entire bid, including all prices, shall be firm for the specified contract period.
3.9. Escalation Clause
1. No price increase shall be granted during the first six (6) months of the original contract period, or if applicable, first six (6) months of a contract renewal or escalation.
MoDOT has 90 days to award the bid pricing.
There can be no price increase within the first 6 months of the original contract period, contract renewal, or escalation.
| Floor Plans GG, HH, II |
| If bidding an alternate, is it necessary to submit pricing for all three floor plans to be eligible for an award? |
| Bidder can submit a bid for the steel cage or fiberglass composite bus but must submit a bid for all 3 floor plans. |
| Floor Plan |
| Could one supplier be awarded the metal GG, HH, II base builds and a different supplier be awarded metal GG, HH, II alternate builds? |
| Bidder can submit a bid for the steel cage or fiberglass composite bus but must submit a bid for all 3 floor plans. |
File details come from the government source that posted it. Updated .