Amendment #2, Wallace-Chapman Mobilization-Demobilization.docx

DOCX document 13 KB Posted

Attached to
Chapman #1 plugging and Abandonment Project
Solicitation number
DQ1 PHAA 2015001160 4
Issued by
Baca County, Denver City, Colorado

About this file

This is an amendment to a state and local contract opportunity issued by CO&GC (Colorado Oil & Gas Conservation Commission) clarifying terms for two separate plugging projects: the Wallace project and the Chapman project. The amendment establishes that both projects will be awarded to a single bidder and addresses contractor responsibilities regarding equipment removal and salvage disposition. The bid due date has been established as Monday, April 13, 2015 at 4:00 PM.

The amendment clarifies that contractors are responsible for removing all production equipment (pump jacks, separators, meter runs, and tanks) and rods and tubing from the three Wallace wells, with all salvage, transportation, and disposition costs to be included in the overall bid submission. CO&GC does not expect to receive credits or proceeds from the disposition of this equipment; rather, the contractor's bid should account for complete site cleanup and removal of all equipment as part of the plugging scope of work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment #2 Mobilization/Demobilization We would like to clarify a couple of things for the Wallace and Chapman projects.

1) There are two different projects to be bid on – the Wallace and the Chapman.

We intend to award both on these properties to a single bidder.

2) Questions on Salvage Is it the contractor’s obligation to remove the production equipment (pump jacks, separators, meter runs, and tanks) from the 3 Wallace wells Project?

Does the contractor “earn” salvage rights to these items?

Or does the CO&GC expect to receive a credit for any proceeds from the disposition of this equipment?

Same questions for the rods and tubing removed from these wells?

Answer:

With the disposition of the equipment and rods/tubing, our intention is that the sites are cleaned of all equipment by the end of the plugging piece, so the transport/salvage/ whatever can be included as part of their overall bid.

3) Because of the above changes:

The due date for the bid is hereby moved to Monday April 13, 2015 at 4:00 PM.