This is a Statement of Work (SOW) from the U.S. Department of State's OBO Facilities Management Division for construction work at the U.S. Embassy Madrid in Spain, dated June 2021. The document outlines two main construction lines: an ADA ramp and a motorcycle area.
Line 1 (ADA Ramp) includes specifications for drainage relocation, ground excavation to 23cm depth, waterproofing membrane installation, steel mesh placement, concrete slab (HA 25), stainless steel handrails (AISI 304), 60x40 pavement tiles, and drainage grill installation. Line 2 (Motorcycle area) requires similar drainage relocation, last step regularization, steel mesh placement in the last 20cm, concrete ciclopedo, stainless steel handrails, and 60x40 pavement tiles. Both lines include cleaning, waste management, and safety requirements. The document emphasizes that all measurements are estimates, and offerors are responsible for their own measurements with no price adjustments allowed for measurement errors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 002.docx | DOCX document | |
| Q-A No. 2.docx | DOCX document | |
| Amendment 2 - ATTACHMENT 8 - DATA SHEET.pdf | ||
| Amendment 2 - ATTACHMENT 6 - SPECIFICATIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
U.S. DEPARTMENT OF STATE
OBO FACILITIES MANAGEMENT DIVISION
Attachment 8. Total cost breakdown.
All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements.
No adjustment in price shall be made due to errors in Offeror's measurements.
U.S. Embassy Madrid Spain
June, 2021
All measurements included herein are estimates. Each Offeror is responsible for taking its own measurements. No adjustment in price shall be made due to errors in Offeror's measurements.
Presupuesto Código Ud Item Mes CanPres Pres
LINE 1 : ADA RAMP
01.01 PA 1
01.02 m2 25
01.03 m2 25
01.04 m2 25
01.05 m3 5
01.06 ml 35
01.07 m2 25
01.08 ml 3
01.09 PA 1
01.10 PA
Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works Demolition and excavation: Dig the ground to a depth of about 23 cm (the thickness of the slab and pavement). If the soil is too soft, you might need to excavate deeper and add compacted gravel to improve stability.
Placed a waterproofing membrane Place steel mesh or rebar inside the excavation before pouring the concrete Slab concrete HA 25 Handrail stainless steel, AISI 304, (Includes handrail on stairs) Pavement tile 60x40 Grill on drainage Cleaning and waste management Security and safety 1
LINE 2 : MOTORCYCLE
01.01 PA 1
01.02 M3 5
01.03 m2 41
01.04 m3 8.2
01.05 m3 31.16
01.06 ml 20
01.07 m2 25
01.08 PA 1
01.09 PA
Reroute and relocate the drainage located on the base of the stairs and other utilities on the area before starting the works Regularization of last step Place steel mesh (last 20cms) Concrete ciclopedo Handrail stainless steel, AISI 304, Pavement tile 60x40 Cleaning and waste management Security and safety