This document is an Amendment with a Questions and Answers Log for Solicitation #140A1124B0004 - White Mtn Detention Center - Interior Pod Repairs. The key details are:

The scope of work includes interior pod repairs, such as painting CMU walls, repairing/replacing drywall ceilings, epoxy floor finishes, replacing shower fixtures and lavatories in Detention Pods E and F. The contractor will need a security clearance for the onsite supervisor. The work can be performed during regular business hours Monday through Friday, except for holidays. All stored materials will be removed from the pods prior to construction. This solicitation is issued by the Department of the Interior Bureau of Indian Affairs Western Region for the White Mtn Apache Adult Detention Center.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Questions and Answers Log for Solicitation #140A1124B0004 - White Mtn Detention Center - Interior Pod Repairs

NumberContractorQuestionAnswer
1WCAShould the unfinished CMU walls at the Corridor on 2nd Floor between Detention Pods E & F also be painted and receive epoxy floor finish?Yes the unfinished CMU walls at the Cooridor on 2nd floor between Pod E and F shall received finish paint and epoxy floor finish.
2WCAShould the currently primed doors and frames on 2nd Floor at and between Detention Pods E & F be painted?Yes the currently primed doors and frames on 2nd Floor between Detention Pods E & F be painted.
3WCAMost of the drywall ceilings have already been textured and are ready for paint. There are several areas with water damage that require repair or replacement. Please confirm that the 500 SF of drywall repair included with the Scope of Services includes just the drywall repair, tape, and texture of the water damaged ceiling areas.Most of the drywall ceilings have already been textured and are ready for paint. There are several areas with water damage that require repair or replacement. Roughly 500 SF of drywall repairs shall include drywall repair, tape, and texture of the water damaged ceiling areas.
4WCAFor the epoxy floor finish, we would utilize a two part epoxy floor paint with sand broadcast into the mix for slip resistance. We do not see any rubber cove base included with this Scope of Work. Please confirm.No Rubber cove base will be required in the scope.
5WCAPer the walk-thru, we only saw one (1) shower fixture in Pod F and two (2) shower fixtures in Pod E. The Scope of Services calls for (4) existing shower fixtures/nozzles to be replaced. Please advise.Correction: Replace (1) detention grade shower fixtures and nozzles in Pod F and (2) detention grade in Pod E.
6WCAScope of Sevices calls for all detention showers to receive epoxy wall and floor finishes. Please confirm that this scope is limited to just Detention Pods E & F showers.Correct: All shower and toilet walls and floors stall receive expoxy wall finish.
7WCAPlease provide a .PDF Floor Plan of the 2nd Floor building floor architectural layout if available.Existing floor plans will be provided.
8WCAFor Security Clearance, please advise on which security application and level of clearance is required for onsite Supervisor.When contractor is awarded contract, security clearance procedures will be provided to contractor.
9WCAFor CMU wall painting Scope of Work, we recommend a block filler primer with 2 acylic semi-gloss finish coats of paint for non-shower areas and two coats of water based catalyzed epoxy paint for shower area walls. Please confirm if this is acceptable.For CMU wall painting Scope of Work, we recommend a block filler primer with 2 acylic semi-gloss finish coats of paint for non-shower areas and two coats of water based catalyzed epoxy paint for shower area walls is acceptable.
10WCAThere are a total of 4 existing Lavatories (2 in Pod E and 2 in Pod F). Only two (2) new ADA Lavatories are being provided, so we assume one existing lav in each Detention Pod is being replaced and that none of the Detention Toilets are being replaced.Replace All toilets and lavatorys in Pod E and F.
11WCAPlease confirm that all shelving and stored materials in the Detention Pods will be removed by Detention Facility Staff prior to construction start.All stored materials will be removed from Pods during construction.
12WCAPlease confirm if construction work can be performed during regular business hours (7 AM - 5 PM) Monday - Friday, except for holidays.correct.