This is Amendment 1 to Request for Quote (RFQ) 24-026 issued by the Michigan Department of Transportation (MDOT) for the procurement of bi-directional enhanced delineation products. The amendment addresses questions and answers submitted by bidders regarding the Luciol Systems Bidirectional Linear Delineation A.D. product. The RFQ requests 1,775 linear feet of the A.D. product, divided into two line items to account for different mounting requirements. Delivery is required to an office in Grand Rapids, Michigan within 8 weeks of the bid date, though MDOT prefers delivery as soon as possible and indicates willingness to accept delivery up to 2 additional weeks beyond the specified timeframe if the vendor maintains communication regarding the delivery schedule. Bidders should indicate their proposed delivery timeframe in Section 1.2 of the RFP document.
The amendment clarifies that bidders may request confidential treatment for product prints and installation instructions, provided they supply required information supporting the legal grounds for such treatment; however, confidential treatment cannot be applied to resumes, pricing, or marketing materials. The exact color combination for reflector materials (white/red versus yellow/red footage) was not specified in the RFQ for either line item but does not affect bid pricing. The selected vendor must contact project manager Timothy Schneider at SchneiderT6@michigan.gov or (616) 204-1048 to finalize the specific footage requirements for each reflector color combination prior to purchase order issuance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bidirectional Linear Delineation System Spec-Attachment 1.pdf | ||
| Luciol Systems Bidirectional Linear Delineation A.D. (TM) TDS 013013A-Attachment 2.pdf | ||
| RFQ 24-026 Proposal-Instructions.docx | DOCX document | |
| Amendment 1 - Revisions Schedule A.docx | DOCX document | |
| RFQ 24-026 Schedule_A Amended.docx | DOCX document | |
| RFQ 24-026 standard-contract-terms-short-form.docx | DOCX document | |
| RFQ 24-026 Schedule_B_Pricing.docx | DOCX document | |
| federal_provisions_addendum.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement of Bi-Directional Enhanced Delineation Request for Quote 240000000026 Amendment 1 – Questions and Answers
| Q # |
| Document & Section |
| Bidder Question |
| State’s Answer |
| 1 |
| Attachment 2/Commodity Line 1 |
| Is my interpretation correct? The RFQ requests the same product, described as "Attachment 2-Luciol Systems Bidirectional Linear Delineation A.D. Technical Data Sheet (TDS)" to be used for 2 applications: on line 1, it calls for 1775 linear ft of mate. |
| This is correct; the same product but 2-line items to account for the different mounting requirements. The RFQ is only for the A.D. product. The quantity requested is 1775 linear feet. |
| 2 |
| Confidential Treatment Form |
| Under confidential treatment, it states that "Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials"; the product print and installation instruction could then be labelled as confidential, correct? |
| You can label the product print and installation instructions as confidential, but you must supply the required information that supports the specific legal grounds to support treating that information as such. |
| 3 |
| Attachment 1 |
| According to the attached specification, it is required for the Product to be delivered to office in Grand Rapids, Michigan within 8 weeks of bid date; do you have any leeway to extent this by another 2 weeks, just in case? |
| MDOT prefers delivery in 8 weeks or as soon as possible. Bidder should indicate their proposed delivery timeframe in the Section 1.2 response box of the RFP document. If the vendor maintains communication with us in regard to delivery window, we could still take delivery up to 2 additional weeks later than specified. |
| 4 |
| Attachment 1/Schedule A Section 1/RFQ Commodity Lines |
| The color combination for each line item (i.e., how many liner ft. of white/red and how many ft. of yellow/red) is missing from the RFQ, both in line item #1 and in line item #2: what are they? note: they do not affect bid price but are required at PO. |
The selected vendor should contact the project manager and we will work out the exact footage of each reflector color combination.
Project Manager:
Timothy Schneider SchneiderT6@michigan.gov
(616) 204-1048