This document is a Scope of Work from Flagler County for a Demountable Partition Contractor/Fabricator (DPC) for the Flagler County Nexus Center project. The scope involves providing detailed drawings, specifications, installation, and coordination of demountable partition systems as part of the Fixture, Furniture, and Equipment (FF&E) package. The project requires a modular and reconfigurable partition system that meets specified acoustic and aesthetic requirements while adhering to building codes and standards. The successful DPC will be responsible for design coordination, site preparation, final testing, and ensuring seamless integration with existing interiors.
The DPC must coordinate with the Construction Manager (Ajax Building) and Flagler County, submit all required documentation, and verify site conditions prior to fabrication. Key responsibilities include investigating the as-built site, submitting a schedule for review, obtaining any necessary permits, and providing comprehensive warranties and maintenance guidelines. The partitions will be FF&E Package number 1, with installation planned for mid-May 2025. No separate permit is required, as the Construction Manager (CMAR) will handle all permitting. The contractor must adhere to the specifications outlined in the attached documents and coordinate closely with the county throughout the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Flagler County is requesting an experienced Demountable Partition Contractor/Fabricator (DPC) to provide detailed drawings and specifications (shop drawings), installation, and coordination of demountable partition systems as outlined and defined in the attached drawings and specifications for the Flagler County Nexus Center. The scope of work for this fabrication and installation of the demountable partition in this project will occur as part of the Fixture, Furniture, and Equipment (FF&E) package. The demountable partitions will be FF&E Package number 1 issued by this COUNTY. The scope of work for this portion of the project will include the following requirements for the successful DPC:
1. The partition systems will be modular and reconfigurable, offering flexibility in space planning and layout adjustments.
2. The partition systems must meet specified acoustic and aesthetic requirements while adhering to building codes and standards. These requirements are defined in the attached drawings and specifications.
3. The DPC must verify with local Permitting Agency (Flagler COUNTY), if any, permits are required for this scope of the work. If permits are required, the DPC must submit all required, signed and sealed drawings (as required) to the permitting agency for review and approval. The DPC is responsible for all permitting and application fees.
4. The DPC should review all attached drawings and specifications that outline the technical requirements for the project.
5. The DPC should coordinate with the Construction Manager (Ajax Building) and COUNTY for installation, schedule, and construction coordination concerns.
6. The scope will encompass detailed design coordination, site preparation, and final testing to ensure a seamless integration with existing interiors.
7. The DPC should adhere to specifications included in this package.
8. The installed walls should include all warranties, including maintenance and care guidelines, to the COUNTY.
9. The DPC should issue drawings and specifications outlining their understanding of the scope of work to the COUNTY prior to submittal to permitting agency for review and approval.
10. The DPC should investigate the as-built site prior to fabrication to ensure conditions match the design intent.
11. The DPC should submit a schedule to the COUNTY and CM for review and approval.