A104-DEMOUNTABLE-PARTITION-DETAILS-Rev.1.pdf

PDF 362 KB Posted

Attached to
Nexus Center Demountable Walls
Solicitation number
25-010P
Issued by
Flagler County, Florida

About this file

This document is a detailed architectural drawing (Sheet A104) for Demountable Partition Details for the Flagler County Nexus Center project in Florida, prepared by Rhodes + Brito Architects. The drawing comprehensively illustrates multiple technical configurations and installation specifications for demountable wall systems, including various partition types (WP-1A, WP-1B, WP-2, WP-3, WP-4), with specific details on glazing, door frames, ceiling trims, and installation components. The drawings provide scaled technical representations showing vertical sections, starter details, door jambs, corner details, and partition types with precise measurements and component annotations.

The technical specifications indicate glazing will be Type "G7" unless otherwise noted, with references to additional glazing type information on Sheet A601. The document is part of the conformed documents set, dated 04/11/2024, with a recent revision on 07/26/2024 for pre-bid RFIs and clarifications. The project is specifically for Flagler County and will require installation of demountable partitions in the Nexus Center, with installation scheduled for Mid-May 2025. While no specific pricing details are included in this technical drawing, the document provides critical architectural and installation guidance for the demountable partition system, which will be essential for contractors bidding on the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARTITION AS SCHEDULED

VERTICAL PARTITION FRAME

REMOVABLE TILE

COMPRESSIBLE STARTER

PARTITION AS SCHEDULED

VERTICAL PARTITION FRAME

REMOVABLE TILE

STARTER COMPONENT

PARTITION AS SCHEDULED

COMPRESSIBLE STARTER

GLAZING AS SCHEDULED

PARTITION FRAME

CEILING/SOFFIT AS

SCHEDULED

CEILING TRACK FLAP

TOP HORIZONTAL FRAME

DOOR AS SCHEDULED

FINISHED FLOORING AS

SCHEDULED

DOOR HEADER

100'-0"

FINISHED FLOOR

VARIES

SEE PANEL TYPES

BATT INSULATION

CEILING/SOFFIT AS

SCHEDULED

CEILING TRACK FLAP

TOP HORIZONTAL FRAME

FINISHED FLOORING AS

SCHEDULED

100'-0"

FINISHED FLOOR

VARIES

SEE PANEL TYPES

REMOVABLE TILE

HORIZONATAL FRAME

LEVELING BOLT

BASE TRACK

BATT INSULATION

CEILING/SOFFIT AS

SCHEDULED

SOUND GASKETING & SEAL

AT HEAD & JAMB. TYPICAL

TOP HORIZONTAL FRAME

GLAZING

BOTTOM HORIZONTAL

FRAME

REMOVABLE TILE

HORIZONATAL FRAME

FINISHED FLOORING AS

SCHEDULED

LEVELING BOLT

BASE TRACK

3'-8"

TOP OF FRAME

100'-0"

FINISHED FLOOR

BATT INSULATION

VARIES

SEE PANEL TYPES

CEILING TRACK FLAP

SOUND GASKETING & SEAL

AT SILL. TYPICAL

CEILING/SOFFIT AS

SCHEDULED

CEILING TRACK FLAP

TOP HORIZONTAL FRAME

GLAZING

DOOR AS SCHEDULED

FINISHED FLOORING AS

SCHEDULED

DOOR HEADER

100'-0"

FINISHED FLOOR

VARIES

SEE PANEL TYPES

WP-1A WP-1B WP-2 WP-3 WP-4

VARIES

VARIES

VARIES VARIES

VARIES

GLAZING IN ALUM

FRAME

N O T E :

GLAZING AT DEMOUNTABLE WALLS ARE

TO BE GLAZING TYPE "G7", TYP UNLESS

NOTED OTHERWISE

REFER SHEET A601 FOR GLAZING TYPES

GLAZING IN ALUM

FRAME

SOLID WALL

PANEL

DOOR IN FRAME

AS SCHEDULED

DOOR IN FRAME

AS SCHEDULEDSOLID WALL

PANEL

SOLID WALL

PANEL

CEILING TRIMCEILING TRIM

CEILING TRIM

WALL BASE WALL BASEWALL BASE WALL BASEWALL BASE

A7/A104 A7/A104

A9/A104 A9/A104

A7/A104

A9/A104

A5/A104

A5/A104

C1/A104 C3/A104

E9/A104

E9/A104

G9/A104 G9/A104

G9/A104

G9/A104

POST CAP WHERE

OCCURING

CEILING TRIM

POST CAP WHERE

OCCURING

CEILING TRIM

POST CAP WHERE

OCCURING

C7/A104

C7/A104

C7/A104 C5/A104

C5/A104

C5/A104

E1

A104 E5

A104

E5

A104

E3

A104

E7

A104

SOLID WALL

PANEL

DOOR AS SCHEDULED

PARTITION FRAME

DOOR FRAME

GLAZING AS

SCHEDULED

CONNECTOR

CLIP

GLAZING AS SCHEDULED

PARTITION FRAME

REMOVABLE TILE

INLINE CORNER

POST CAP

VERTICAL PARTITION

FRAME

CORNER REVEAL

CONNECTOR

PARTITION AS

SCHEDULEDDOOR AS SCHEDULED

VERTICAL

PARTITION FRAME

REMOVABLE TILE DOOR FRAME

REMOVABLE TILE

INLINE POST CAP

VERTICAL PARTITION

FRAME

CORNER REVEAL

CONNECTOR

CONNECTOR

CLIP

REMOVABLE TILE

VERTICAL PARTITION

FRAME

INLINE CORNER

POST CAP

CORNER REVEAL

CONNECTOR

GLAZING AS SCHEDULED

PARTITION FRAME

SCALE:

DATE:

DRAWN BY:

CHECK BY:

PROJECT NUMBER:

1 2 3 4 5 6 7 8 9 10

H

G

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

ALL REPRODUCTION AND INTELLECTUAL

PROPERTY RIGHTS RESERVED ©

Seal

Consultants

Client

A C CT T SEH IR

605 E. ROBINSON STREET, SUITE 750

ORLANDO, FL 32801

AR0014284

www.rbarchitects.com 407.648.7288

N.T.S

A104

DEMOUNTABLE

PARTITION DETAILS

RR, BL

MA

04/17/2024

18018-0002

FLAGLER COUNTY

NEXUS CENTER

FLAGLER COUNTY

CONFORMED DOCUMENTS

04/11/2024

Ruffin Rhodes AR0014284

SCALE: 3" = 1'-0"A104

A9 DEMOUNTABLE PARTITION -STARTER DTL

SCALE: 3" = 1'-0"A104

A7 DEMOUNTABLE PARTITION -STARTER DTL

SCALE: 3" = 1'-0"A104

A5 DEMOUNTABLE PARTITION -STARTER DTL

SCALE: 3" = 1'-0"A104

E7 DEMOUNTAL WALL PARTION - SECTION

SCALE: 3" = 1'-0"A104

E5 DEMOUNTAL WALL PARTION - SECTION

SCALE: 3" = 1'-0"A104

E1 DEMOUNTAL WALL PARTITION - SECTION

SCALE: 3" = 1'-0"A104

E3 DEMOUNTAL WALL PARTION - SECTION

SCALE: 3/8" = 1'-0"A104

A1 DEMOUNTABLE PARTITION TYPES

SCALE: 3" = 1'-0"A104

C1 DEMOUNTABLE PARTITION -DOOR JAMB

SCALE: 3" = 1'-0"A104

E9 DEMOUNTABLE PARTITION DETAIL

SCALE: 3" = 1'-0"A104

C7 DEMOUNTABLE PARTITION -CORNER DTL

SCALE: 3" = 1'-0"A104

C3 DEMOUNTABLE PARTITION -DOOR JAMB

SCALE: 3" = 1'-0"A104

C5 DEMOUNTABLE PARTITION -DOOR JAMB

SCALE: 3" = 1'-0"A104

G9 DEMOUNTABLE PARTITION DETAIL

SCALE: 3" = 1'-0"A104

C9 DEMOUNTABLE PARTITION -CORNER DTL

DATE SUBMISSION/REVISION NO.

07/26/2024 PRE-BID RFIS &

CLARIFICATIONS

File details come from the government source that posted it. Updated .