Amendment 0003 Page 16-178 Hazmat Report 1.pdf
PDF 16 MB Posted
- Attached to
- B115 Life Extension Center- Lean-to Construction
- Solicitation number
- Not on record
About this file
This document is Amendment 0003 to the solicitation for the B115 Life Extension Center- Lean-to Construction project. The solicitation is reserved exclusively for vendors of the Blue Small Business MACC (Multiple Award Construction Contract) managed by the Naval Facilities Engineering Command (NAVFAC).
The key details are:
- The proposal due date is Monday, July 22, 2024, no later than 2:00 pm local time.
- Solicitation No.: N40080-18-R-0002 X025
- Attachments included are: Amendment 0003 Block 14 with RFI Responses, Hazmat Report, Warranty 20 yr Letter, drawings, and a revised solicitation with changes such as deleted CLIN 0002, revised Price Schedule, and updated Wage Determination.
- The federal agency involved is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hazardous Material Report for Buildings H115, H115A, 1407, and 1482
H115 AE Hangar Life Extension
NAS, Pax River, MD
NAVFAC Washington
Contract No. N4008022D001 Task Order: N4008022F5048
Date: 03/20/2023
3500 Parkway Lane, Suite 600 Norcross, GA 30092-2861 i
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY ..................................................................................................... ES-1
1.0 INTRODUCTION
1.1 General
1.2 Relevant Regulations
2.0 INSPECTION PROCEDURES
2.1 General
2.2 Survey
2.3 Inspection for Other Hazards
3.0 SUMMARY OF FINDINGS
3.1 Asbestos
3.2 Lead-Containing Paint (LCP)
3.3 Other Hazards
4.0 RECOMMENDATIONS
4.1 Asbestos
4.2 Lead-Containing Paint (LCP)
4.3 Other Hazards
5.0 LIMITATIONS OF THE INSPECTION
LIST OF TABLES
Table 1 Summary of Asbestos-Containing Materials Table 2 Summary of Lead Paint Table 3 Summary of Other Potentially Hazardous Materials
LIST OF APPENDICES
Attachment A Asbestos Survey Material Summaries Attachment B Laboratory Analytical Reports for Asbestos Attachment C Photographs of the Buildings Attachment D Training Certificates and Certificates of Accreditation Attachment E Previous Asbestos Reports
ES-1
EXECUTIVE SUMMARY
Introduction
The POND-Michael Baker International Team was retained to provide Architect-Engineering Services for the development of a Design/Build Request for Proposal for the response to renovate the maintenance hangar and support facilities at the Pax River Air Station, Maryland. The Team performed environmental and hazardous material surveys for four (4) buildings associated with this project. The buildings included
Building H115 (Hangar), Building H115A (Boiler House/Guard Shack), Building 1407 (appendage on north side of H115), and Building 1482 (Line Office). This summary report documents the survey of the buildings by a certified inspector(s) for asbestos-containing material (ACM), suspected lead-containing paint (LCP), suspected polychlorinated biphenyls (PCBs), fluorescent light tube investigation, mercury light switch investigation, and other universal wastes (UW). The facilities are scheduled for renovation, and these surveys serve to identify the potentially hazardous materials and conditions likely to be impacted by the proposed project.
Mr. Gary Case conducted this field investigation and inspection. Mr. Case is a United States
Environmental Protection Agency (USEPA)-certified Building Inspector, Management Planner, and
Project Designer for asbestos and a certified Inspector and Risk Assessor for lead paint. The inspection involved the identification of suspect homogeneous building materials and paint, sampling and laboratory analysis, and an assessment of the conditions and location of the suspected building materials and paint, as well as other hazards. Laboratory analysis of the bulk material (for asbestos) and potential building waste samples (for lead) was conducted by EMSL Analytical, Inc. of Westmont, New Jersey.
Regulatory Background
The USEPA and State of Maryland define ACM as any material that contains greater than one percent asbestos. Title 40 of the Code of Federal Regulations, Part 61 (40 CFR 61), Subpart M (USEPA National
Emission Standards for Hazardous Air Pollutants) requires that an asbestos inspection be conducted prior to renovation/demolition activities. The State of Maryland also requires that asbestos inspections be conducted prior to renovation/demolition activities.
ES-2
The Occupational Safety and Health Administration (OSHA) Lead Standard (29 CFR 1926.62) is applicable where paints that contain any amount of lead will be disturbed. OSHA considers all paint
(since all paint has some level of lead within it) as LCP. Thus, all of the paint would be considered LCP.
Summary of Findings and Recommendations
The purpose of this environmental study was to identify hazardous materials (asbestos, LCP, etc.) prior to the renovation of the four buildings, so that proper procedures can be utilized to prevent creation of any potential hazards. This survey was conducted in support of the initial concept renovation design for these buildings; thus, it is assumed that all of the materials identified in this survey will have to be removed to accomplish the project.
The following chart provides details on the identified concerns within the buildings.
Building Number
ACM Concern
LCP Concern
Other Hazards Concern
H115 Yes Yes Yes
H115A Yes Yes Yes
1407 No Yes Yes
1482 No Yes Yes
ES-3
Asbestos
Our Asbestos Inspector assessed the existing building materials suspected to contain asbestos and to be impacted during renovation. The asbestos survey was conducted during October 24-26, 2022. Based upon the review of the results of this investigation, two of the four buildings (Buildings H115 and
H115A) contain building components that can be classified as ACM. The ACM is summarized and listed in Table 1. The ACM within the surveyed areas can be currently managed in-place with little potential hazard. However, due to the proposed project, all of the ACM should be properly handled when removed, and if removed, disposed of accordingly. The development of hazardous material abatement drawings and specifications would be warranted for the safe removal of the positively identified and presumed ACM.
Lead-Containing Paint
Based upon the age of the buildings, all of the painted materials should be identified as LCP. While no bulk paint samples were collected, general observations of the condition of the paint were documented to assist with the potential project. Table 2 presents the specific information for the lead paint. Numerous painted building components were observed to be damaged and deteriorated. While there is no abatement of paint planned, the proposed contractor should be aware of the LCP during the renovation activities, so that proper safety worker procedures can be performed. The requirements of the Occupational Safety and
Health Administration (OSHA) Construction Standards need to be invoked if any metal content is present in the paint that may be affected by renovation activities. OSHA does not provide a minimum concentration criteria level for these metals; however, it requires precautions and protection for workers and the working environment be taken at any workplace where an exposure to airborne metals may occur.
The proposed contractor shall be responsible to perform work according to all applicable federal, state, and local laws. Specifications are warranted for the safe removal of the identified LCP.
ES-4
Other Hazards
Based upon the results of this investigation, the buildings contain other hazards and universal wastes, namely suspected mercury-containing thermostats and potentially hazardous materials (see Table 3).
These hazards should be corrected to prevent any future problems. The survey revealed the following:
- Approximately 1809 light bulbs were noted during the inspection. The existing original lighting systems have an elevated potential to contain mercury-containing florescent light bulbs and should be disposed of in accordance with the Environmental Protection Agency (EPA) Universal
Waste (UW) Regulations 40 CFR 273.
- Approximately 445 light fixtures were noted during the inspection. There is a possibility that
PCB-containing light ballasts exist in the buildings. Should fluorescent light ballasts that are not specifically marked “non-PCB containing” ballasts be encountered during demolition/renovation, they should be managed and disposed of in accordance with Toxic Substances Control Act
(TSCA) Storage and Disposal Requirements for Fluorescent Light Ballasts.
- Approximately 38 thermostats were noted during the inspection. The thermostats are likely to contain mercury and should be disposed of in accordance with the Environmental Protection
Agency (EPA) Universal Waste (UW) Regulations 40 CFR 273.
- Approximately 39 EXIT signs were noted during inspection. Self-luminous EXIT signs containing the radioactive gas, tritium, were widely used in a variety of facilities across the
United States. While the current United States Department of Defense’s Unified Facilities
Criteria specifically prohibits tritium exit signs in military facilities, given the age of these buildings, signs containing this gas may be present. Intact tritium EXIT signs pose little or no threat to public health and safety and do not constitute a security risk. However, the NRC requires proper accounting and disposal of all radioactive materials. Proper handling and accounting are important, because a damaged or broken sign could cause minor radioactive contamination of the immediate vicinity, requiring a potentially expensive clean up. It is recommended that these be collected intact and disposed of at a licensed recycling facility.
ES-5
- Approximately 66 smoke detectors were noted during the inspection. The fire protection systems have an elevated potential to contain ionization type smoke and fire detectors that are typically constructed with an Americium-241 radioactive source. If impacted by the renovation/demolition these should be segregated and disposed of properly in accordance with
Federal, state and local regulations.
- A total of 8 air conditioner was noted during the inspection. Independent units may contain a potentially regulated refrigerant that may be classified as Ozone Depleting Substances (ODS).
Section 608 of the Clean Air Act prohibits the known release of refrigerants and ODS during the maintenance, service, repair, or disposal of air-conditioning and refrigeration equipment. The
EPA requires proper refrigerant management practices by owners and operators of refrigeration and air-conditioning systems, technicians, and others. The refrigerants should be managed and disposed of in accordance with 40 CFR 82 and applicable Federal, state and local regulations.
The proposed contractor shall be responsible to perform work according to all applicable federal, state, and local laws. Specifications are warranted for the safe removal of the identified hazardous materials.
Disclaimer
The information that is presented in this report reflects the conditions that were observed in the buildings during the time frame this inspection was conducted. However, conditions could change due to vandalism, deterioration, or maintenance activities. Although every effort was made to identify all potential suspect building materials and components, there is no guarantee that additional materials are not present. Conditions may exist in the buildings; such that inaccessible materials may only become apparent during renovation activities.
1.0 INTRODUCTION
1.1 General
The POND-Michael Baker International Team performed a Hazardous Material Assessment/Survey as part of the planning for the renovation of four (4) buildings at the Pax River Air Station, in Maryland.
The hazardous material assessment/survey required an asbestos-containing materials (ACM) investigation and sampling, lead-containing paint (LCP) investigation, suspected polychorinatedbiphenyls (PCBs) material documentation, fluorescent light tube investigation, mercury light switch investigation, and general safety hazard documentation within the selected buildings. The buildings that were selected included Buildings H115, H115A, 1407, and 1482.
Mr. Gary Case of Michael Baker conducted this field investigation and inspection during October 24-26, 2022. Mr. Case is a United States Environmental Protection Agency- (USEPA) certified Building
Inspector, Management Planner, and Project Designer for asbestos and a certified Inspector and Risk
Assessor for lead paint.
This report summarizes the activities and procedures used during the project and presents the survey findings and recommendations. The text of this report is supplemented by information found within the
Figures, Tables, and Attachments A through E. The Figures contain the floor plans for each of the buildings (not drawn to scale). The Tables represent the findings for ACM, LCP, and Other Hazardous
Components within the buildings. Attachment A contains field data forms that were used to document the asbestos inspections of the buildings. Attachment B contains the laboratory analytical reports for bulk materials for asbestos. Attachment C contains the photographs pertinent to the asbestos inspection of these buildings. Attachment D contains copies of training certificates for the staff who conducted the investigation and the certificates of accreditation for the laboratories that conducted sample analysis.
Attachment E contains previous asbestos reports pertinent to these buildings.
1.2 Relevant Regulations
Relevant regulations and policies are summarized below.
The USEPA, Federal Occupational Safety and Health Administration (OSHA), and State of
Maryland define ACM as any material that contains greater than one percent asbestos.
Title 40 of the Code of Federal Regulations, Part 61 (40 CFR 61), Subpart M (USEPA National
Emission Standards for Hazardous Air Pollutants), OSHA (29 CFR 1926.1101), and the State of
Maryland require that an asbestos inspection be conducted prior to renovation/demolition activities.
The OSHA Lead Standard (29 CFR 1926.62) is applicable where paints that contain any amount of lead will be disturbed. OSHA considers all paint (since all paint has some level of lead within
it) as LCP. Thus, all paint will be considered LCP.
2.0 INSPECTION PROCEDURES
2.1 General
Mr. Gary Case conducted this field investigation and inspection of the buildings identified in Section 1.2.
Mr. Case is an USEPA-certified Building Inspector, Management Planner, and Project Designer for asbestos and a certified Inspector and Risk Assessor for lead paint. Copies of his training certificates are included in Attachment D.
Michael Baker utilized EMSL Analytical, Inc. of Westmont, New Jersey for laboratory analysis of collected samples. EMSL Analytical is accredited in accordance with standards set by the U.S. National
Institute of Standards and Technology (NIST) under the National Voluntary Laboratory Accreditation
Program (NVLAP), and by the American Industrial Hygiene Association (AIHA) for both asbestos and lead analysis. Copies of their certifications are included in Attachment D.
2.2 Survey
After review of the previous asbestos reports (see Attachment E), the inspector conducted a thorough search within these buildings to identify potential asbestos-containing building materials, LCP, and other hazards. When a suspected material was located, the bulk material sampling plan was implemented.
Under this plan, suspect building materials were grouped into homogeneous sampling areas, which contained materials that were uniform in texture, appearance, color, physical characteristics, and function.
For asbestos, each homogeneous material was given a unique identification number. Once the homogeneous material boundaries were established, core samples of the material were collected.
Insulation materials that were composed of fiberglass were not considered potential (i.e., suspect) ACM.
Material condition of each asbestos material was assessed as described in the chart below.
MATERIAL CONDITION DESCRIPTIONS
Condition Description
Undamaged Material is intact and is not damaged
Damaged Less than 10% distributed damage, or less than 25% localized damage
Significant Damage 10% or more distributed damage, or 25% or more localized damage
For each suspect homogeneous material, the material description, location(s), approximate quantity of asbestos, friability, condition, sample identification, sample location, and sample result information were recorded on the field data forms found in Attachment A. The definition of a friable material is one that can be crushed, pulverized, or reduced to powder under hand pressure when dry. The definition of a nonfriable material is one that cannot be crushed, pulverized, or reduced to powder under hand pressure when dry. Sample locations are noted in the field data. The building layout figures of the buildings are included in Figures.
Samples were collected by using chisels, utility knives, etc. to remove small pieces of building materials.
Each sample was placed into a resealable plastic bag and given a unique sample identification number.
During sampling activities, the inspector exercised care to prevent any suspected ACM from becoming airborne. Wet wiping was used during the sampling to immediately clean up any debris generated by the sampling process.
2.3 Inspection for Other Hazards
Michael Baker visually inspected these buildings for evidence of mold and water intrusion concurrently with the asbestos survey. Michael Baker also documented any safety and/or physical concerns observed at the buildings.
3.0 SUMMARY OF FINDINGS
3.1 Asbestos
Samples containing greater than one percent asbestos are considered to be asbestos containing as defined by the USEPA. In addition to the USEPA, the National Emission Standards for Hazardous Air Pollutants
(NESHAP), 40 CFR, Part 61, requires that any asbestos sample containing less than 10 percent asbestos when analyzed by Polarized Light Microscopy (PLM) be reanalyzed using the PLM point counting procedure. Otherwise, the material must be considered ACM. For this investigation, the Scope of Work did not require confirmation of asbestos content through additional analysis; thus, the building materials containing less than or equal to 10 percent asbestos would be assumed to be ACM.
As part of the investigation, Michael Baker reviewed the previous asbestos reports for the buildings to confirm (or disregard) the presence of the confirmed asbestos in the reports. If the previous ACM was located, it was confirmed and added to the building’s summary of materials. Michael Baker identified and collected bulk material samples for twenty-seven (27) suspected homogeneous materials that were present and suspected to be asbestos containing for these buildings. A summary of the twenty-nine (29)
ACM for these buildings is presented in Table 1. The field data for these buildings, including a listing of the suspected homogeneous materials and the corresponding sample results, can be found in Attachment
A. The laboratory analytical reports for these buildings are contained in Attachment B.
3.2 Lead-Containing Paint
The field personnel reviewed and identified the suspected painted building components with the buildings. While no bulk paint samples were collected, general observations of the condition and locations of the paint were documented to assist with the potential renovation project. Table 2 presents the specific information for the lead paint.
3.3 Other Hazards
An investigation for evidence of mold, water intrusion, other hazardous materials, safety issues, and other hazards was conducted in these buildings. Several items, such as thermostats and fluorescent lights that may contain mercury, exit signs that may contain radioactive materials, and ballasts that may contain
PCBs were searched for throughout the building. The results of the investigation for other hazards and the field data to support the following environmental and safety hazard concerns are documented within
Table 3, and as summarized below:
Approximately 1809 light bulbs were noted during the inspection. The existing original lighting systems have an elevated potential to contain mercury-containing florescent light bulbs and should be disposed of in accordance with the Environmental Protection Agency (EPA) Universal
Waste (UW) Regulations 40 CFR 273.
Approximately 445 light fixtures were noted during the inspection. There is a possibility that
PCB-containing light ballasts exist in the buildings. Should fluorescent light ballasts that are not specifically marked “non-PCB containing” ballasts be encountered during demolition/renovation, they should be managed and disposed of in accordance with Toxic Substances Control Act
(TSCA) Storage and Disposal Requirements for Fluorescent Light Ballasts.
Approximately 38 thermostats were noted during the inspection. The thermostats are likely to contain mercury and should be disposed of in accordance with the Environmental Protection
Agency (EPA) Universal Waste (UW) Regulations 40 CFR 273.
Approximately 39 EXIT signs were noted during inspection. Self-luminous EXIT signs containing the radioactive gas, tritium, were widely used in a variety of facilities across the
United States. While the current United States Department of Defense’s Unified Facilities
Criteria specifically prohibits tritium exit signs in military facilities, given the age of these buildings, signs containing this gas may be present. Intact tritium EXIT signs pose little or no threat to public health and safety and do not constitute a security risk. However, the NRC requires proper accounting and disposal of all radioactive materials. Proper handling and accounting are important, because a damaged or broken sign could cause minor radioactive contamination of the immediate vicinity, requiring a potentially expensive clean up. It is recommended that these be collected intact and disposed of at a licensed recycling facility.
Approximately 66 smoke detectors were noted during the inspection. The fire protection systems have an elevated potential to contain ionization type smoke and fire detectors that are typically constructed with an Americium-241 radioactive source. If impacted by the renovation/demolition these should be segregated and disposed of properly in accordance with
Federal, state and local regulations.
Eight (8) air conditioner was noted during the inspection. Independent units may contain s potentially regulated refrigerant that may be classified as Ozone Depleting Substances (ODS).
Section 608 of the Clean Air Act prohibits the known release of refrigerants and ODS during the maintenance, service, repair, or disposal of air-conditioning and refrigeration equipment. The
EPA requires proper refrigerant management practices by owners and operators of refrigeration and air-conditioning systems, technicians, and others. The refrigerants should be managed and disposed of in accordance with 40 CFR 82 and applicable Federal, state, and local regulations.
NOTE: All quantities of the hazardous materials must be field verified and/or quantified by a licensed contractor prior to the renovation activities.
4.0 RECOMMENDATIONS
The purpose of these hazardous material assessment/survey was to identify hazardous materials (ACM, LCP, etc.) prior to the renovation of these buildings, so that proper procedures can be utilized to prevent creation of any potential hazards. This survey was conducted in support of the initial concept renovation design for these buildings; thus, it is assumed that all of the materials identified in this survey may have to be removed to accomplish the project. Specific recommendations have been provided based upon discussion of the potential renovation of these buildings (plans are subject to change).
4.1 Asbestos
Based upon the review of the results of this investigation, two of the four buildings contain building components that can be classified as ACM (see Table 1). Most of the ACM is currently in good condition, and they can be managed in-place with little potential hazard. However, in the event of the proposed renovation project, all of the ACM that will be impacted or disturbed should be properly handled or removed, and if removed, disposed of accordingly. Abatement plans should be designed in accordance with USEPA and other federal, state, and local regulations and/or using appropriate guidelines by a certified Asbestos Designer and reviewed by a Certified Industrial Hygienist. All of the abatement activities should be overseen and managed by an experienced Asbestos Abatement Supervisor, and removal should be performed by certified, trained asbestos workers. Removal notifications, activities, and disposal must be completed in accordance with USEPA and other applicable federal, state, and local regulations.
4.2 Lead-Containing Paint
Based upon the age of the selected buildings, the four (4) buildings contain building components that are coated with LCP (see Table 2). The exterior of the selected buildings had areas of damaged or deteriorated paint. The interior of several buildings also had areas of damaged and/or deteriorate paint. If the buildings are demolished, the selected contractor should be responsible for the safe and proper handling of the painted items according to all federal, state, and local regulations. All of the activities should be overseen and managed by an experienced supervisor and trained workers. The contractor should comply with the OSHA lead standard, which regulates occupational exposure to lead.
4.3 Other Hazards
Based upon the results of this investigation, there are numerous hazards associated with the components used in the buildings (see Table 3). All of the items should be corrected and/or handled prior to the proposed renovation project to ensure that the current building conditions do not represent any safety concerns during the project.
5.0 LIMITATIONS OF THE INSPECTION
The information that is presented in this report reflects the conditions that were observed in the buildings during the time frame that this inspection was conducted. Although every effort was made to identify all of the potential suspect building materials and/or paint, there is no guarantee that additional materials are not present. Conditions may exist such that inaccessible materials may only become apparent during renovation activities. If suspect building materials or paints are identified during renovation or demolition activities, they should be sampled and analyzed prior to disturbance. If warranted, the material should be removed and handled according to all applicable USEPA, OSHA, state, and local regulations.
FIGURES
UP
A-201 D1
A-201 B2
A-201 C1
A-201 A2
D1 A-301
D1 A-301
B2 A-301
B2 A-301
A2 A-301
A2 A-301
F E D C B A
A1/ A-111
A3/ A-111
A1/ A-113
A3/ A-113
A1/ A-112
A3/ A-112
A1/ A-111
A3/ A-111
A1/ A-113
A3/ A-113
A1/ A-112
A3/ A-112
A1 / A
-1
A1 / A
-1
A1 / A
-1
A1 / A
-1
A3 / A
-1
A3 / A
-1
A3 / A
-1
A3 / A
-1
C2 A-301
C2 A-301
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
CO
M
PR
EH
EN
SI
VE
1S T
FL
O
O R
PL
AN
SCALE:
10' - 0" 20' - 0" 40' - 0"
1" = 20' - 0"
SCALE: 1" = 20'-0"
COMPREHENSIVE - 1ST FLOOR PLANA1
208 SF
TECH LIBRARY
C111
523 SF
QA
C110
191 SF
C110A
193 SF
C110B
98 SF
STORAGE
278 SF
C107
342 SF
PROJECT LIAISON
C106A
316 SF
C106A
117 SF
QA MANAGER
C112
STAIR HALL
C109
ELECTRICAL
C108
EL
EC
TR
IC
AL
A2 A-301
A2 A-301
D C
A3/ A-111 A3/ A-111
MATCH LINE MATCH LINE
116 SF
C106C
110 SF
C106B
540 SF
LOGS AND RECORDS
C105
179 SF
STRUCTURES
C104A 219 SF
C104
586 SF
C101
EGRESS
ENVIRONMENTAL
139 SF
OFFICE
384 SF
C100
EGRESS
ENVIRONMENTAL
HALL
C105
HALL
C103
MECHANICAL
C102
D1 A-301
D1 A-301
A2 A-301
A2 A-301
EL
EC
TR
IC
AL
D C
MATCH LINE MATCH LINE
A1/ A-111 A1/ A-111
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
1S T
FL
O
O R
PL
AN
CE
NT
ER
L
EA
N-
TO
A
RE
AS
A
A
ND
B
SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA AA1 SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA BA3
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"
WOMENS
E112
RESTROOM
ENTRY
MENS
388 SF
AVIATION ORDNANCE
E111
E110
MECHANICAL 175 SF
OFFICE
E109
HALL
E108
ELECTRICAL
641 SF
E107
CONTRACTOR
ORDNANCE
SHOP
ELECTRICAL
747 SF
E106
AVIONICS
SHOP
B2 A-301
B2 A-301
97 SF
109 SF
B A
A3/ A-112 A3/ A-112
MATCH LINE MATCH LINE
747 SF
E106
AVIONICS
SHOP
1235 SF
AIRFRAME AND POWER
PLANTS SHOP
E105
270 SF
NAVY
E113
259 SF
NAVY
E114
642 SF
E115
DYNA
MAINTENANE
CONFERENCE
ROOM
886 SF
COMSEC ROOM
102 SF
VAULT
E103
HALL
1138 SF
FLIGHT GEAR
E102
D1 A-301
D1 A-301
B2 A-301
B2 A-301
309 SF
E115B
178 SF
E115A
B A
MATCH LINE MATCH LINE
A1/ A-112 A1/ A-112
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
1S T
FL
O
O R
PL
AN
W
AT
ER
SI
DE
L
EA
N-
TO
A
RE
AS
C
A
ND
D
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA CA1 SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA DA3
201 SF
W106C
773 SF
Shipping and Receiving W107
89 SF
W106A
POP ROOM
W107A
CONF.RM
W108
ELECTRICAL
ENTRY W109
HALL
144 SF
W109
W110
MECHANICAL
481 SF
AVMI
STORAGE
STORAGE JC
HALL
MENS WOMENS
F E
A3/ A-113 A3/ A-113
MATCH LINE MATCH LINE
C2 A-301
C2 A-301
501 SF
CERTIFIED
ORDNANCE SHOP
W101
234 SF322 SF
W102A
155 SF
W102
748 SF
W104
467 SF
GREEDUNK/BREAK RM
W105
219 SF
W105A
256 SF
W105B
201 SF
W106C
220 SF
W106B
89 SF
W106A
W103
HALL
D1 A-301
D1 A-301
F E
MATCH LINE MATCH LINE
A1/ A-113 A1/ A-113
C2 A-301
C2 A-301
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
1S T
FL
O
O R
PL
AN
RO
AD
SI
DE
L
EA
N-
TO
A
RE
AS
E A
ND
F
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"
SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA EA1 SCALE: 1/8" = 1'-0"
1ST FLOOR PLAN - AREA FA3
A-201 D1
A-201 B2
A-201 C1
A-201 A2
D1 A-301
D1 A-301
B2 A-301
B2 A-301
A2 A-301
A2 A-301
UP
UP
UP
UP
F E D C B A
C2 A-301
C2 A-301
A1/ A-121A1/ A-123 A1/ A-123
A3/ A-123 A3/ A-123
A1/ A-121
A3/ A-121 A3/ A-121
A1/ A-122 A1/ A-122
A3/ A-122 A3/ A-122
A1 / A
-1
A1 / A
-1
A1 / A
-1
A1 / A
-1
A3 / A
-1
A3 / A
-1
A3 / A
-1
A3 / A
-1
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
CO
M
PR
EH
EN
SI
VE
2N D
FL
O
O R
PL
AN
SCALE: 1" = 20'-0"
COMPREHENSIVE - 2ND FLOOR PLANA1
SCALE:
10' - 0" 20' - 0" 40' - 0"
1" = 20' - 0"
157 SF
C210
418 SF
C207/209
216 SF
C214
128 SF
C216
222 SF
C213
168 SF
C211
81 SF
C217
110 SF
C218B
104 SF
C218A
710 SF
C218
125 SF
C218C
146 SF
C211
HALLSTORAGE
MEN'S RR
STAIR
STORAGE
ST
OR
AG
E
ST
OR
AG
E
A2 A-301
A2 A-301
D C
MATCH LINE MATCH LINE
A3/ A-121 A3/ A-121
588 SF
CONFERENCE
ROOM
412 SF
C201
197 SF
CONFERENCE ROOM
C206 190 SF
C203B
182 SF
CONFERENCE ROOM
C208
73 SF
C205
147 SF
C205
214 SF
C208
CONFERENCE
ROOM
STORAGE
REST RM
HALL
STAIR
WOMEN'S RR HALL
POP RM
C204
D1 A-301
D1 A-301
A2 A-301
A2 A-301
D C
MATCH LINE MATCH LINE
A1/ A-121 A1/ A-121
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
2N D
FL
O
O R
PL
AN
CE
NT
ER
L
EA
N-
TO
A
RE
AS
A
A
ND
B
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"
SCALE: 1/8" = 1'-0"
2ND FLOOR PLAN - AREA AA1
SCALE: 1/8" = 1'-0"
2ND FLOOR PLAN - AREA BA3
B2 A-301
B2 A-301
155 SF
E202STORAGE
E203
E204
KITCHEN
E206
STAIR
E207
WOMEN'S RR
348 SF
E210
CONFERENCE
ROOM
241 SF
E212
HALL
E2
A
B A
MATCH LINE MATCH LINE
A3/ A-122 A3/ A-122
D1 A-301
D1 A-301
B2 A-301
B2 A-301
2715 SF
E208
E2
B E2
A
HALL
STAIR
MEN'S RR
140 SF
E214
109 SF
E220
143 SF
E221
287 SF
E222
ST
OR
AG
E
421 SF
CONFERENCE
ROOM
B A
MATCH LINE MATCH LINE
A1/ A-122 A1/ A-122
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
2N D
FL
O
O R
PL
AN
W
AT
ER
SI
DE
L
EA
N-
TO
A
RE
AS
C
A
ND
D
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"SCALE: 1/8" = 1'-0"
2ND FLOOR PLAN - AREA CA1 SCALE: 1/8" = 1'-0"
2ND FLOOR PLAN - AREA DA3
1551 SF
W209
PO
P
RM
PO
P
RM
257 SF
W208
MEN'S RR
HALL
HALL
ST
AI
R
377 SF
W204
220 SF
W203
462 SF
W201
STORAGE
F E
C2 A-301
C2 A-301
MATCH LINE MATCH LINE
A3/ A-123 A3/ A-123
123 SF
W212
101 SF
W213
218 SF
W211
152 SF
VAULT/STORAGE
MECH
STORAGE
862 SF
CONFERENCE ROOM
W216
W217
ST
AI
R HALL
W218
WOMEN'S RR
W210
D1 A-301
D1 A-301
ELEC
F E
C2 A-301
C2 A-301
MATCH LINE MATCH LINE
A1/ A-123 A1/ A-123
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
2N D
FL
O
O R
PL
AN
RO
AD
SI
DE
L
EA
N-
TO
A
RE
AS
E A
ND
F
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"
SCALE: 1/8" = 1'-0"
2ND FLOOR PLAN - AREA EA1
2ND FLOOR PLAN - AREA FA3
A-201 D1
A-201 B2
A-201 C1
A-201 A2
D1 A-301
D1 A-301
B2 A-301
B2 A-301
A2 A-301
A2 A-301
F E D C B A
C2 A-301
C2 A-301
A1 / A
-1
A1/ A-132 A1/ A-132
A3/ A-132 A3/ A-132
A3 / A
-1
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
CO
M
PR
EH
EN
SI
VE
3R D
FL
O
O R
PL
AN
SCALE: 1" = 20'-0"
COMPREHENSIVE - 3RD FLOOR PLANA1
SCALE:
B2 A-301
B2 A-301
132 SF
E301
78 SF
E302
502 SF
E303
E307
E304
854 sf
E305
E309 E310
FREIGHT
ELEVATOR
5,000 lbs
MECHANICAL
E308
B A
MATCH LINE MATCH LINE
A3/ A-132A3/ A-132
D1 A-301
D1 A-301
B2 A-301
B2 A-301
MECHANICAL
E308
659 SF
E311
253 SF
CONF RM
E313
269 SF
CONF RM
E313
HALL
HALL
ST
AI
R
546 SF
Room E312
B A
MATCH LINE MATCH LINE
A1/ A-132 A1/ A-132
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
3R D
FL
O
O R
PL
AN
W
AT
ER
SI
DE
L
EA
N-
TO
A
RE
AS
C
A
ND
D
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"SCALE: 1/8" = 1'-0"
3RD FLOOR - AREA CA1 SCALE: 1/8" = 1'-0"
3RD FLOOR - AREA DA3
A-201 D1
A-201 B2
A-201 C1
A-201 A2
D1 A-301
D1 A-301
B2 A-301
B2 A-301
A2 A-301
A2 A-301
F E D C B A
C2 A-301
C2 A-301
A1/ A-141 A1/ A-141
A1 / A
-1
A1 / A
-1
A3/ A-141 A3/ A-141
A3 / A
-1
A3 / A
-1
A1 / A
-1
A1/ A-142 A1/ A-142
A3/ A-142 A3/ A-142
A3 / A
-1
A1 / A
-1
A1/ A-143A1/ A-143
A3/ A-143 A3/ A-143
A3 / A
-1
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
CO
M
PR
EH
EN
SI
VE
RO
O
F
PL
AN
SCALE: 1" = 20'-0"
COMPREHENSIVE - ROOF PLANA1
SCALE:
A2
A2 A-301
D C
MATCH LINE MATCH LINE
A3/ A-141 A3/ A-141
D1 A-301
D1 A-301
A2 A-301
A2 A-301
D C
MATCH LINE MATCH LINE
A1/ A-141 A1/ A-141
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
RO
O
F
PL
AN
CE
NT
ER
L
EA
N-
TO
A
RE
AS
A A
ND
B
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"SCALE: 1/8" = 1'-0"
Roof Plan - AREA AA1 SCALE: 1/8" = 1'-0"
Roof Plan - AREA BA3
B2
B2 A-301
B A
MATCH LINE MATCH LINE
A3/ A-142 A3/ A-142
D1 A-301
D1 A-301
B2 A-301
B2 A-301
B A
MATCH LINE MATCH LINE
A1/ A-142 A1/ A-142
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
RO
O
F
PL
AN
W
AT
ER
SI
DE
L
EA
N-
TO
A
RE
AS
C A
ND
D
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"
SCALE: 1/8" = 1'-0"
Roof Plan - AREA CA1
Roof Plan - AREA DA3
F E
C2 A-301
C2 A-301
MATCH LINE MATCH LINE
A3/ A-143 A3/ A-143
D1 A-301
D1 A-301
F E
C2 A-301
C2 A-301
MATCH LINE MATCH LINE
A1/ A-143 A1/ A-143
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
RO
O
F
PL
AN
RO
AD
SI
DE
L
EA
N-
TO
A
RE
AS
E
A
ND
F
SCALE:
4' - 0" 8' - 0" 16' - 0"
1/8" = 1' - 0"SCALE: 1/8" = 1'-0"
Roof Plan - AREA EA1 SCALE: 1/8" = 1'-0"
Roof Plan - AREA FA3
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
FEDCBA
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
F E D C B A
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
1020304050607080
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
10 20 30 40 50 60 70 80
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
CO
M
PR
EH
EN
SI
VE
E
XT
ER
IO
R
EL
EV
AT
IO
NS
SCALE: 1" = 20'-0"
COMPREHENSIVE - EXTERIOR ELEVATION - NORTHC1
SCALE: 1" = 20'-0"
COMPREHENSIVE - EXTERIOR ELEVATION - SOUTHD1
SCALE:
10' - 0" 20' - 0" 40' - 0"
1" = 20' - 0"
SCALE: 1" = 20'-0"
COMPREHENSIVE - EXTERIOR ELEVATION - EASTB2
COMPREHENSIVE - EXTERIOR ELEVATION - WESTA2
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
F E D C B A
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
1020304050607080
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
1020304050607080
1ST FLOOR
0"
2ND FLOOR
15' - 0"
ROOF
45' - 0"
3RD FLOOR
30' - 0"
10 20 30 40 50 60 70 80
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
W
AS
HI
NG
TO
N
PRELI
M
IN
ARY
NOT
FO
R C
ONSTR
UCTI
ON
FY
H
A
E H
A N
G A
R L
IF
E
E X
TE
N
S
IO
N
BU
IL
DI
NG
S
EC
TI
O
NS
SCALE: 1" = 20'-0"
BUILDING SECTIOND1
SCALE: 1" = 20'-0"
BUILDING SECTIONB2
SCALE: 1" = 20'-0"
BUILDING SECTIONA2
SCALE:
10' - 0" 20' - 0" 40' - 0"
1" = 20' - 0"
BUILDING SECTIONC2
TABLES
TABLE 1
SURVEY OF ASBESTOS-CONTAINING MATERIALS
BUILDING H115
Homogeneous
Material Number
Material Type Material Description Category of ACM Approximate Quantity of Asbestos
Condition of Material
02 Vinyl Floor Tile and Floor Adhesive
12" x 12" Dark Gray Floor Tile Category II; Non-Friable ACM 9,600 Square Feet Damaged
03 Vinyl Floor Tile and Floor Adhesive
12" x 12" Off-White Floor Tile Category II; Non-Friable ACM 480 Square Feet Damaged
04 Vinyl Floor Tile and Floor Adhesive
12" x 12" Light Tan Floor Tile Category II; Non-Friable ACM 480 Square Feet Damaged
05 Vinyl Floor Tile and Floor Adhesive
12" x 12" Tan Floor Tile Category II; Non-Friable ACM 480 Square Feet Damaged
08 Vinyl Floor Tile and Floor Adhesive
12" x 12" Dark Blue Floor Tile with Tan Floor Adhesive
Category II; Non-Friable ACM 10,800 Square Feet Damaged
09 Vinyl Floor Tile and Floor Adhesive
12" x 12" Blue Mottle Floor Tile with Tan Floor Adhesive
Category II; Non-Friable ACM 1,200 Square Feet Damaged
11 Vinyl Floor Tile and Floor Adhesive
12" x 12" Gray Mottle Floor Tile Category II; Non-Friable ACM 480 Square Feet Damaged
12 Vinyl Floor Tile and Floor Adhesive
12" x 12" Red Floor Tile Category II; Non-Friable ACM 240 Square Feet Damaged
13 Vinyl Floor Tile and Floor Adhesive
12" x 12" Black Floor Tile Category II; Non-Friable ACM 240 Square Feet Damaged
PI1 Thermal Pipe Insulation White Insulation on 24" Large Pipe Category I; Friable ACM 615 Linear Feet Damaged
PI2 Thermal Pipe Insulation White Insulation on 8" Large Pipe Category I; Friable ACM 2,875 Linear Feet Damaged
PI3 Thermal Pipe Insulation White Insulation on 2" Large Pipe Category I; Friable ACM 3,200 Linear Feet Damaged
CF1 Thermal Pipe Fitting Insulation
White Hard Elbow on 24" Large Pipe Category I; Friable ACM 60 Each Damaged
CF2 Thermal Pipe Fitting Insulation
White Hard Elbow on 8" Large Pipe Category I; Friable ACM 225 Each Damaged
CF3 Thermal Pipe Fitting Insulation
White Hard Elbow on 2" Large Pipe Category I; Friable ACM 325 Each Damaged
DI1 Thermal Insulation White Insulation on Ductwork Category I; Friable ACM 120 Square Feet Damaged
VFTM2 Floor Adhesive Mastic for VFT2 Category II; Non-Friable ACM 300 Square Feet Damaged
VFT3 Vinyl Floor Tile 12" x 12" Tan Floor Tile Category II; Non-Friable ACM 300 Square Feet Damaged
VFTM13 Floor Adhesive Mastic for VFT13 Category II; Non-Friable ACM 400 Square Feet Damaged
FM1 Floor Adhesive Floor Mastic Under Carpet Category II; Non-Friable ACM 15,000 Square Feet Damaged
FM2 Floor Adhesive Floor Mastic Under Carpet Category II; Non-Friable ACM 3,850 Square Feet Damaged
TIP1 Cement Panels Gray (Transite-like) Category II; Non-Friable ACM 800 Square Feet Damaged
REC1 Roof Edge Caulk Black Category II; Non-Friable ACM 60 Linear Feet Damaged
RAC1 Roof Asphalt Coating Gray Category II; Non-Friable ACM 600 Square Feet Damaged
RM1 Roof Mastic Black Category II; Non-Friable ACM 2,000 Square Feet Damaged
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
TABLE 1
SURVEY OF ASBESTOS-CONTAINING MATERIALS
BUILDING H115A
Homogeneous
Material Number
Material Type Material Description Category of ACM Approximate Quantity of Asbestos
Condition of Material
01 Thermal Pipe Insulation White Insulation on 24" Large Pipe Category I; Friable ACM 25 Linear Feet Damaged
03 Thermal Pipe Insulation White Wrap on 24" Large Pipe Category I; Friable ACM 25 Linear Feet Damaged
05 Thermal Pipe Fitting Insulation
White Hard Elbow on 24" Large Pipe Category I; Friable ACM 2 Each Damaged
07 Vinyl Floor Tile and Floor Adhesive
12" x 12" Green Vinyl Floor Tile and Tan Floor Adhesive
Category II; Non-Friable ACM 300 Square Feet Damaged
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
TABLE 2
SURVEY OF LEAD PAINT
NAVAL AIR STATION PATUXENT RIVER, MARYLAND
Buildings Component Locations Color Substrate Condition Findings Recommendations
Building H115
Building H115A
Building 1407
Building 1482
* The requirements of the Occupational Safety and Health Administration (OSHA) Construction Standards need to be invoked if any metal content is present in the paint that may be affected by renovation activities. OSHA does not provide a minimum concentration criteria level for lead; however, it requires precautions and protection for workers and the working environment be taken at any work place where an exposure to airborne metals may occur.
If impacted by renovation activities, proper handling and/or removal of the lead-containing paint is needed.
All painted components
Interior and Exterior
All Paint Colors
All Substrates
All Conditions
All paint contains at least a trace of lead and must be addressed according to OSHA requirements.
TABLE 3
SUMMARY OF OTHER POTENTIALLY HAZARDOUS WASTE
NAVAL AIR STATION PATUXENT RIVER, MARYLAND
Buildings Light Bulbs Ballasts Thermostats Exit Signs Smoke Detectors A/C Units Recommendations
Building H115 1,750 - Various bulbs 425 35 32 60 8
Building H115A 35 - Various bulbs 12 1 3 2 0
Building 1407 12 - Various bulbs 4 1 2 2 0
Building 1482 12 - Various bulbs 4 1 2 2 0
NOTE: These are approximate quantities tallied at the time of the survey. Actual quantities should be field verified upon removal and/or demolition of the buildings.
If impacted by renovation activities, proper handling and/or removal of these components is needed.
ATTACHMENT A
ASBESTOS SURVEY MATERIAL SUMMARY
BUILDING 115
NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
01 No PAX - 115 - 01A None Detected E112
PAX - 115 - 01B None Detected E112
02 No PAX - 115 - 02A (VFT) 2% Chrysotile W218
PAX - 115 - 02A (FA) None Detected W218
PAX - 115 - 02B (VFT) Not Analyzed W211
PAX - 115 - 02B (FA) None Detected W211
03 No PAX - 115 - 03A 2% Chrysotile E208A
PAX - 115 - 03B Not Analyzed E208A
04 No PAX - 115 - 04A 2% Chrysotile W109
PAX - 115 - 04B Not Analyzed W109
05 No PAX - 115 - 05A 2% Chrysotile C104A
PAX - 115 - 05B Not Analyzed C104A
Yes 480 Square Feet Damaged
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Tan Floor Tile with Tan Floor
Adhesive
Throughout the Building
Yes 480 Square Feet Damaged
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Off-White Floor Tile with Tan
Floor Adhesive
Throughout the Building
Yes 480 Square Feet Damaged
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Light Tan Floor Tile with Tan
Floor Adhesive
Throughout the Building
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Dark Gray Floor Tile with Tan
Floor Adhesive
Throughout the Building
Yes 9,600 Square Feet
Damaged
Vinyl Floor Sheeting and
Floor Adhesive
Gray Vinyl Floor Sheeting with Tan
Floor Adhesive
Throughout the Building
No Not Applicable Not Applicable
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, contains less than 10% asbestos is considered positive, unless re-analyzed by PLM point count.
NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
06 No PAX - 115 - 06A (VFT) None Detected E309
PAX - 115 - 06A (FA) None Detected E309
PAX - 115 - 06B (VFT) None Detected E309
PAX - 115 - 06B (FA) None Detected E309
07 No PAX - 115 - 07A None Detected W109
PAX - 115 - 07B None Detected W109
08 No PAX - 115 - 08A (VFT) None Detected Hall near w109
PAX - 115 - 08A (FA) None Detected Hall near w109
PAX - 115 - 08B (VFT) Not Analyzed W104
PAX - 115 - 08B (FA) <1% Chrysotile W104
Yes 10,800 Square Feet
Damaged
No Not Applicable Not Applicable
Vinyl Floor Tile and Floor
Adhesive
12" x 12" White with Gray Streaks Floor Tile with Tan Floor
Adhesive
Throughout the Building
No Not Applicable Not Applicable
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Light Gray Floor Tile with Tan
Floor Adhesive
Throughout the Building
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Dark Blue Floor Tile with Tan
Floor Adhesive
Throughout the Building
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
09 No PAX - 115 - 09A (VFT) None Detected C109
PAX - 115 - 09A (FA) <1% Chrysotile C109
PAX - 115 - 09B (VFT) Not Analyzed C109
PAX - 115 - 09B (FA) <1% Chrysotile C109
10 No PAX - 115 - 10A (VFT) None Detected W101
PAX - 115 - 10A (FA) None Detected W101
PAX - 115 - 10B (VFT) None Detected W106D
PAX - 115 - 10B (FA) None Detected W106D
11 No PAX - 115 - 11A (VFT) 3% Chrysotile W215
PAX - 115 - 11A (FA) None Detected W215
PAX - 115 - 11B (VFT) Not Analyzed W215
PAX - 115 - 11B (FA) None Detected W215
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Gray Mottle Floor Tile with Tan Floor Adhesive
Throughout the Building
Yes 480 Square Feet Damaged
Vinyl Floor Tile and Floor
Adhesive
9" x 9" Green Floor Tile with Tan Floor
Adhesive
Throughout the Building
No Not Applicable Not Applicable
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Blue Mottle Floor Tile with Tan
Floor Adhesive
Throughout the Building
Yes 1,200 Square Feet
Damaged
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
12 No PAX - 115 - 12A (VFT) 3% Chrysotile E111
PAX - 115 - 12A (FA) None Detected E111
PAX - 115 - 12B (VFT) Not Analyzed E111A
PAX - 115 - 12B (FA) None Detected E111A
13 No PAX - 115 - 13A 3% Chrysotile E111
PAX - 115 - 13B Not Analyzed E111A
14 No PAX - 115 - 14A None Detected Stairwell
PAX - 115 - 14B None Detected Stairwell
Stair Treads Brown Stairwells No Not Applicable Not Applicable
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Black Floor Tile with Tan Floor
Adhesive
Throughout the Building
Yes 240 Square Feet Damaged
Vinyl Floor Tile and Floor
Adhesive
12" x 12" Red Floor Tile with Tan Floor
Adhesive
Throughout the Building
Yes 240 Square Feet Damaged
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
PI1 Yes Previous Sampled Material
30% Chrysotile - - - - -
PI2 Yes Previous Sampled Material
25% Chrysotile - - - - -
PI3 Previous Sampled Material
45% Chrysotile - - - - -
CF1 Previous Sampled Material
30% Chrysotile - - - - -
CF2 Yes Previous Sampled Material
30% Chrysotile - - - - -
CF3 Yes Previous Sampled Material
30% Chrysotile - - - - -
2,875 Linear Feet
Damaged
325 Each Damaged
Damaged
Damaged
Thermal Pipe Fitting
Insulation
White Hard Elbow on 2" Large Pipe
Throughout the Building
Yes
Thermal Pipe Fitting
Insulation
White Hard Elbow on 8" Large Pipe
Throughout the Building
Yes 225 Each Damaged
Thermal Pipe Fitting
Insulation
White Hard Elbow on 24" Large Pipe
Throughout the Building
No Yes 60 Each
Thermal Pipe Insulation
White Insulation on 2" Large Pipe
Throughout the Building
Yes Yes 3,200 Linear Feet
Yes 615 Linear Feet Damaged
Thermal Pipe Insulation
White Insulation on 8" Large Pipe
Throughout the Building
Yes
Thermal Pipe Insulation
White Insulation on 24" Large Pipe
Throughout the Building
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
DI1 Yes Previous Assumed Material
DIM1 No Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
PIM1 No Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CT1 Yes Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CT2 Yes Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CT3 Yes Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
120 Square Feet Damaged
Ceiling Tile
2' x 2' Fissured/Pinhole
Throughout the Building
No2' x 2' Fissured
Ceiling Tile 2' x 4' Fissured/Pinhole
Throughout the Building
No
Ceiling Tile Throughout the Building
No
Thermal Insulation
Mastic
Gray Mastic on White Insulation
Ductwork
Throughout the Building
No
Thermal Insulation
Mastic
Gray Mastic on White Pipe Insulation
Throughout the Building
No
Thermal Insulation
White Insulation on Ductwork
Throughout the Building
Yes
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbestos- Containing
Material
Approximate Quantity of Asbestos
Condition of Material
CT4 Yes Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CT5 Yes Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CTM1 No Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
CTM2 No Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
DW1 No Previous Sampled Material
None Detected - - - - - Not Applicable Not Applicable
JCI No Previous Sampled Material
None Detected - - - - - Not Applicable Not ApplicableJoint Compound
White Throughout the Building
No
Mastic under CT2 Throughout the Building
No
Wall and Ceiling Board
White Throughout the Building
No
Ceiling Tile Adhesive
Ceiling Tile 1' x 1' Solid Throughout the Building
No
Ceiling Tile Adhesive
Mastic under CT1 Throughout the Building
No
Ceiling Tile 1' x 1' Dot Throughout the Building
No
According to EPA, asbestos-containing material (ACM) is defined as any material containing greater than 1% asbestos using laboratory analysis or, by NESHAP, NAVAL AIR STATION PATUXENT RIVER
MARYLAND
Homogeneous Material Number
Material Type
Material Description
Material Locations Friable Sample Numbers Sample Results Sample
Locations
Asbesto…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .