About this file
This Statement of Work (SOW) details a dock leveler replacement project for Building 301 at an Air Force facility. The project requires removing the existing non-functional dock leveler and installing a new one, including mounting, hard-wire power connections, and controls. The work must comply with multiple building, electrical, and safety codes including International Building Code, National Electrical Code, and Air Force Instructions (AFI).
The solicitation is issued by the 55th Civil Engineering Squadron (55 CES) under the Department of the Air Force Air Combat Command. Key dates include: questions due by 26 September 2025 at 8:00 AM CST, with answers available by 10:00 AM CST the same day, and offers due on 29 September 2025 at 7:00 AM CST. Contractor responsibilities include obtaining necessary security and safety clearances, environmental permits, providing system warranty, and delivering O&M manuals. Contact points are SSgt Colin Meyers and SrA Craig Johnson, who can be reached via email for questions and offer submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IMG_0479.jpg | JPG image | |
| IMG_0475.jpg | JPG image | |
| IMG_0480.jpg | JPG image | |
| Dock Leveler Questions Answers.docx | DOCX document | |
| Solicitation - FA460025Q0087 - full v2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Date of Request: 24 June 2025 NexGen IT Service Request #: 16817734 Project title: B301 Dock Leveler Replacement
Objectives:
a. To install a new dock leveler located in B301, Entrance 1.
Existing Conditions:
a. The current dock leveler is due to be replaced and is incapable of operating at full capacity.
General Requirements:
Project includes, but is not limited to, the following work elements. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO). All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, ETL, NFPA 72 and any other applicable code requirement. The contractor shall maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members. Work shall be completed in a neat, substantial, and competent manner.
Requirements
1. Remove old leveler:
a. Dispose of old leveler and debris
2. Install new leveler:
a. To include mounting and any hard wire power and controls to the new leveler after installation.
Additional General Requirements
· Ensure all construction meets federal regulations for safety standards.
· Shall be IAW AFI UFC 3-110-03.
· All security requirements must be met to include times of demolition and construction.
· At close out the contractor shall provide Full System Warranty, no less than 1 year and O&M manuals.
· The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to complete the installation and integration of the prime mission equipment in accordance with the approved site design and installation plan. In addition, the Contractor shall be responsible for the following actions:
a. Obtaining all necessary security and safety clearances for facilities and personnel. This includes obtaining escort badges necessary for unaccompanied work within the area.
b. Obtaining necessary certifications for installation equipment and technologies to be installed.
c. Obtaining environmental and life safety approvals.
d. Acquiring all necessary federal, state, local and base environmental and civil engineering permits and approvals.
e. Redlining installation drawings based upon actual installation results and accommodations due to real-time installation change requirements.
f. Cleaning-up and restoring the site to its original or better condition within 10 workdays after project completion. This includes removal of any portable offices that may have been used to support implementation of the site design at the base.
g. Repairing damage to Government property resulting from contractor activities, assuring the property is returned to its original or better condition.
h. Removing all debris at the end of each shift or more frequently if required to keep the work area safe and useable.
i. Disposing of excess equipment and materials in accordance with General Requirements.
Security Requirements The contractor or duly authorized representative shall comply with pertinent Air Force security regulations while working on the project(s). Special security clearances such as Confidential, Secret, etc., are not required by the A-E for this/these design(s). ALL POSSIBLE PRECAUTIONS AND EFFORTS SHALL BE MADE TO PREVENT THE DISCLOSURE OF ANY INFORMATION THAT MIGHT PROVIDE THE CONSTRUCTION CONTRACTORS, MANUFACTURERS, OR SUPPLIERS AN ADVANTAGE OVER OTHERS.