About this file
This is an amendment to special conditions for the Switzerland Park Project, a reclamation initiative managed by the Colorado Parks and Wildlife Division. The amendment clarifies requirements and responses to contractor inquiries from a pre-bid meeting held on September 9, 2026. Key project requirements include controlled access to project sites via designated Google Earth routes, with minimal tree and limb removal permitted only for safe equipment access. Upon project completion, all disturbed areas and access roads must be repaired, re-graded to approximate existing contours, and revegetated using Division-provided seed mixture at ten pounds per acre without commercial fertilizer or manure. Revegetation and erosion control measures are required as specified in the project's special conditions documents, while a project sign is not required.
A bid bond is not required for this solicitation. All terms and conditions of the original Documented Quote remain in effect except as modified by this amendment, which contractors must acknowledge by receipt and acceptance on the bid schedule and submission of the original bid schedule. The amendment establishes that contractors must adhere to revegetation specifications outlined in the General Bid Specifications from 2009 and comply with applicable sections covering erosion control and site restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Conditions
Switzerland Park Project
Amendment No. 1 DQ1 PKAA 2027*0077
September 16, 2026
Thank you for attending the on-site Pre-Bid Meeting held on September 9, 2026. The following clarifications and amendments should be noted and incorporated into the bid documents:
The Division’s responses to questions received from Contractor(s) during and after the Pre-Bid Meeting are below:
1. Please confirm a bid bond is not required for this solicitation
A bid bond is NOT required for the project
2. Is the contractor allowed to cut in access roads to gain access to all the sites including the removal of trees if needed?
The contractor is required to follow the access routes indicated on Google Earth in the Google Drive folder to access the project features. The access road regrading (cutting) shall be limited to for safe equipment access only.
Limited tree and tree limb removal is allowed for equipment access to the project features and access to the waste piles utilized as backfill material. The tree and tree limb removal shall be limited to the minimum required for safe and effective access to the features and waste piles.
3. What is the repair / reclamation / revegetation expectation of the contractor after the work is complete for the access roads?
Pursuant to the Revegetation Requirements section of the project Special Conditions document, all areas disturbed during reclamation work and any other areas specified in these Special Conditions will be revegetated according to the
Revegetation Specifications in the General Bid Specifications, 2009.
Commercial fertilizer/Manure/Commercial fertilizer or manure is not required for this project.
All access roads shall be repaired and re-graded to the approximate existing contours and revegetated with the DRMS provided seed mixture at a rate of ten
(10) pounds per acre.
4. Section 2 for Backfilling states: 2.5.6 Revegetation, Project Sign, and
Erosion Control If required, revegetation, furnishing, placing, and maintaining Project Sign, and Erosion Control shall be completed in accordance with Section 20 – Revegetation, Section 21, Project Sign, and Section 22, Erosion Control. Please confirm if any portion of Section 2.5.6 is required.
Revegetation and erosion control are required as indicated in the Special Conditions document(s) and table(s) for the project. A project sign is NOT required for the project.
All terms and conditions of the Documented Quote other than as changed by this amendment remain the same.
Receipt and acceptance of this amendment shall be acknowledged on the bid schedule where noted and by submitting the Original Bid Schedule.
Special Conditions
Switzerland Park Project
| Amendment No. 1 DQ1 PKAA 2027*0077 |
| September 16, 2026 |