Alumni Chiller 100_ CD set drawings.pdf
PDF 2 MB Posted
- Attached to
- Chiller Replacement at Alumni Hall_GSC
- Solicitation number
- PE-57600-RFQ-2026-000000011
- Issued by
- Johnson County, Georgia
About this file
This file contains 100% construction documents prepared by NBP Engineers for Gordon State College's Alumni Hall Chiller Replacement project located in Barnesville, Georgia. The project involves the replacement of an existing air-cooled chiller with a new 70-ton nominal capacity unit equipped with a BACnet/MSTP communication card, hot gas bypass compressors, and variable speed condenser fan on the lead circuit. The construction documents include mechanical room and chiller yard demolition and new work drawings, HVAC flow diagrams, electrical power diagrams, and detailed schedules and specifications. A mandatory pre-bid meeting is scheduled for December 18, 2025, at 10:00 am at the GSC Facilities conference room (Building 5) located at 419 College Drive in Barnesville, Georgia, with attendance required for all contractors interested in submitting bids.
The documents specify that the new chiller unit must meet minimum capacity ratings of 54.0 tons at minimum load and 42.0 tons nominal capacity, with a maximum pressure drop of 120.0 feet of head and water flow of 8.10 gallons per minute at full load. The project includes replacement of the existing 400-amp fused disconnect with a new 200-amp fused disconnect for the new chiller, installation of new 3#4/0 AWG copper conductors in 2.5-inch intermediate metal conduit from the disconnect to the chiller, and extension of existing 120-volt control circuits with new 3#10 AWG conductors in 3/4-inch conduit. The design documents were completed on September 30, 2025, by NBP Engineers (COA #PEF000774 with expiration June 30, 2026) and are designated as 100% Construction Documents suitable for contractor bidding and project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
GORDON STATE COLLEGE
Barnesville, Georgia
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP Project No.: 25072
Alumni Hall - Chiller Replacement
M001
M301
M401
LARGE SCALE - MECHANICAL ROOM & CHILLER YARD - DEMOLITION & NEW WORK - HVAC
SHEET TITLE
LOCATION MAP
NOT TO SCALE
09.30.2025 100% Construction Documents
E001
E301 LARGE SCALE - MECHANICAL ROOM & CHILLER YARD - DEMOLITION & NEW WORK - HVAC POWER
FLOW DIAGRAM & DETAILS - HVAC
ABBREVIATIONS, LEGEND, & SCHEDULE - HVAC
LEGEND, SCHEDULE, NOTES, & DETAILS - ELECTRICAL
P:\25072\25072m001.dgn
DATE PLOTTED
DGN FILE
30-SEP-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25072\25072m001.dgn
AS SHOWN
ZAP
LTF
DRH
25072
09.30.2025
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
A lu m n i H a ll C h il le r
R e p la c e m e n t
C O
N S T
R U
C T
IO
N
D
C U
M E
N T S
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
M001
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CONDENSATE DRAIN
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
PCR
CONNECT TO EXISTING
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
MINIMUM
CAPACITY-MBH
RATING
EWT LWT
WATER
FLOW-GPM
EVAPORATOR DATA
MAXIMUM PRESSURE
DROP-FT-H O
FOULING
FACTOR
MAX. TOTAL
INPUT
ELECTRICAL DATA
KW
MARK VOLTAGE/PHASE/HERTZ
EACH
REMARKS
AIR COOLED CHILLER SCHEDULE
MIN.
IPLV
CHR-1 54.0 42.0 120.0 8.10 460/3/600.0001 17.6825.2
MANUFACTURERS
YORK
(LAYOUT BASIS)
TRANE
YLAA CGAM78.8
NOTES:
1 2
MINIMUM
TONS
NOM. CAPACITY
UNIT MUST HAVE A BACNET/MSTP COMMUNICATION CARD.
UNIT COMPRESSORS MUST HAVE HOT GAS BYPASS AND VARIABLE SPEED CONDENSER FAN(S) ON LEAD CIRCUIT.
HVAC
LEGEND, & SCHEDULE -
ABBREVIATIONS,
P:\25072\25072m301.dgn
DGN FILE
30-SEP-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25072\25072m301.dgn
AS SHOWN
ZAP
LTF
DRH
25072
09.30.2025
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
A lu m n i H a ll C h il le r
R e p la c e m e n t
N S T
R U
C T
C U
M E
N T S
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
MECHANICAL
CHILLER YARD
MECHANICAL
CHILLER YARD
T
LAHA
LIGHTING CONTROL PANEL
H R
H S
C H
R
C H S
HR
C H S
C H
R
3"
4"
G
G
3"HR/S 4"CHR/S
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
4"{
CHEMICAL FEED TANK
EXISTING
EXPANSION TANK
EXISTING
EXPANSION TANK
EXISTING
EXISTING P-2
EXISTING P-1
EXISTING P-3
EXISTING P-4
EXISTING VFD-1
EXISTING VFD-2
FEED TANK
CHEMICAL
EXISTING
EXISTING DDC
EXISTING UH-1
EXISTING CONCRETE PAD
CONCRETE PAD
EXISTING
EXISTING MUW
T
C H
R
C H S
GD
W
EXHAUST FAN & DUCTWORK
EXISTING INLINE
T
T
G
B-1
EXISTING
EXISTING
B-2
FLUE
BOILER
EXISTING
CONCRETE PAD
EXISTING
MECHANICAL ROOM & CHILLER YARD - DEMOLITION - HVAC
LARGE SCALE - ALUMNI HALL -
SCALE:
= 1'-0
4 0 2 4 8
T
NEW WORK - HVAC
DEMOLITION &
& CHILLER YARD -
MECHANICAL ROOM
ALUMNI HALL -
M301
LAHA
LIGHTING CONTROL PANEL
H R
H S
C H
R
C H S
HR
C H S
C H
R
3"
4"
G
G
3"HR/S 4"CHR/S
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
4"{
CHEMICAL FEED TANK
EXISTING
EXPANSION TANK
EXISTING
EXPANSION TANK
EXISTING
EXISTING P-2
EXISTING P-1
EXISTING P-3
EXISTING P-4
EXISTING VFD-1
EXISTING VFD-2
FEED TANK
CHEMICAL
EXISTING
EXISTING DDC
EXISTING UH-1
EXISTING CONCRETE PAD
CONCRETE PAD
EXISTING
EXISTING MUW
T
TO BE REMOVED
EXISTING AIR COOLED CHILLER
C H
R
C H S
GD
W
SCALE:
= 1'-0
4 0 2 4 8
MECHANICAL ROOM & CHILLER YARD - NEW WORK - HVAC
LARGE SCALE - ALUMNI HALL -
LINE LEGEND
POINT OF CONNECTION
NEW WORK
EXISTING TO REMAIN
DEMOLITION
EXHAUST FAN & DUCTWORK
EXISTING INLINE
T
T
G
B-1
EXISTING
EXISTING
B-2
FLUE
BOILER
EXISTING
NEW AIR COOLED CHILLER CHR-1
BE REMOVED
SUPPORT TO
EXISTING PIPE
CONCRETE PAD
EXISTING
(TYP.)
SUPPORT
NEW PIPE
4" CHS/R
P:\25072\25072m401.dgn
DGN FILE
30-SEP-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25072\25072m401.dgn
AS SHOWN
ZAP
LTF
DRH
25072
09.30.2025
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
A lu m n i H a ll C h il le r
R e p la c e m e n t
N S T
R U
C T
C U
M E
N T S
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
M401
CHR-1
CHILLED WATER SYSTEM
SUMMARIES
INPUT/OUTPUT
DDC PANELS
ACP
OUTPUTS INPUTS SOFTWARE
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT. LOGS
F A
IL
U R
E
M
D E (S
T E S
A
N D
N O
T E S
T R
E
L
G
S Y
S T
G
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
A
K E
U P
S E
T P
O
IN
T
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IM
IT
R U
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
U
S
A R
T
S T
O P
D A
Y
N
IG
H
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
P
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
C U
R R
E
L A
Y
D
IF
F
P
R E S
S U
R E
S P
E
N T
R O
L
S T
E A
M
W A
T
F
O W
O P
E R
A T
IN
A T
U S
D R
IV
E
S
T A
T U
S
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
S P
E E
D
IN
D
IC
A T
IO
N
G
F
O W
U S
A
F
B T
U
K W
H
S T
A T
U S
TAG
NOTES:
OPERATING PARAMETERS TO THE BAS.
CHR-1 CHILLER
CHILLED WATER FLOW DIAGRAM - HVAC
NOT TO SCALE
AIR COOLED CHILLER ISOMETRIC
DRAIN VALVE WITH HOSE
CONNECTION AT LOW POINT
M.A.V. AT
HIGH POINTS
(FOR ESTIMATING PURPOSES ONLY. PROVIDE PIPING ARRANGEMENT FOR UNIT FURNISHED.)
C H S
C H
R
CABLE ON PIPING
OUTDOORS ABOVE
GRADE
FLANGE ON GROUND
CONDUCTOR TO EVAPORATOR
ELECTRIC HEATING
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE NOT TO SCALE
C H S
C H
R
4"
CHR-
1. PROVIDE FULL INTEGRATION THROUGH THE BACNET INTERFACE CARD FOR INPUT OF ALL
HVAC
& DETAILS -
FLOW DIAGRAM
P:\25072\25072e001.dgn
DGN FILE
30-SEP-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25072\25072e001.dgn
AS SHOWN
MJS
BCO
KMS
25072
09.30.2025
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
A lu m n i H a ll C h il le r
R e p la c e m e n t
N S T
R U
C T
C U
M E
N T S
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
E001
ELECTRICAL
NOTES, & DETAILS -
LEGEND, SCHEDULE,
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
RECEPTACLES
CIRCUITS
ELECTRICAL LEGEND
DUPLEX RECEPTACLE - NORMAL
QUAD - NORMAL
GFCI DUPLEX RECEPTACLE - NORMAL
GFCI QUAD - NORMAL
SPECIAL - TYPE NOTED OR SHOWN
WEATHER PROOF RECEPTACLE (GFCI)
ELECTRIC WATER COOLER RECEPTACLE(GFCI)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
FLEXIBLE RACEWAY
RACEWAY EXPOSED
WP
AC
ABOVE COUNTER DUPLEX RECEPTACLE (COORDINATE
HEIGHT WITH ARCHITECT)DUPLEX RECEPTACLE - TAMPER PROOFT
HOMERUN - ONE ARROW PER CIRCUIT
NOTES:(THIS SHEET ONLY)
NEW CHILLER 480V @175A MOCP
EXISTING CHILLER 480V @350A MOCP
REPLACE EXISTING CHILLER IN PLACE
PARTIAL POWER RISER - CHILLER REPLACEMENT
NOT TO SCALE
F
ELEC/MECH ROOM
WP
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
PANELBOARD-250 VAC OR LESS
RECESSED
PANELBOARD-OVER 250 VAC
SURFACE MOUNTED
PANELBOARD-OVER 250 VAC
RECESSED
BACKBOARD
J
M
GENERAL EQUIPMENT
T
JJ
TRANSFORMER
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED BREAKER-RECESSED IN WALL
ENCLOSED CIRCUIT BREAKER
EMERGENCY PUSHBUTTON
COMBINATION STARTER AND DISCONNECT
EXHAUST FAN
MANUAL STARTER AND MOTOR RATED SWITCH
MOTOR
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
DISCONNECT SWITCH: "F" IF FUSED
F
SLAB OR BELOW GRADE
GROUNDING CONDUCTOR- UNDER
G
C GROUND ROD - C IF CHEMICAL
GROUND CONNECTION (SCHEMATIC)
OF CONDUCTOR/CONDUIT SIZE AND TYPE.
EXISTING DISCONNECT FOR NEW DISCONNECT. NOTIFY ENGINEER
REUSE EXISTING FEEDER CONDUTORS AND CONDUIT SERVING
200A/3P/3R
FCHILLER
NEW
CHILLER
F
30A/3P/3R
FREC
NEW
EXTERIOR
NEW 3#10AWG IN 3/4" C.
FOR NEW CHILLER CONTROLS CIRCUIT. EXTEND CIRCUIT AS REQUIRED WITH
RE-USE EXISTING 120V CIRCUIT SERVING EXISTING CHILLER CONTROL PANEL
REQUIRED WITH CHILLER MANUFACTURER PRIOR TO ORDERING.
200A/3P/3R FUSED DISCONNECT. COORDINATE EXACT FUSE TYPE
RELACE EXISTING 400A/3P/3R FUSED DISCONNECT IN PLACE WITH NEW
CUT EXISTING CONDUIT FLUSH TO SLAB AND SEAL ALL PENETRATIONS.
ABANDON EXISTING 3.5" CONDUIT AND CONDUCTORS IN PLACE.
ROUTED EXPOSED ALONG THE SAME PIPE PATH AS THE CHILLED WATER.
PROVIDE NEW 3#4/0AWG CU, 1#6G, 2.5" IMC FROM DISCONNECT TO CHILLER
RECEPTACLE BACKBOXES. RECEPTACLES TO BE REPLACED AS INDICATED ON 1/E301.
REUSE CONDUIT AND CONDUCTORS FROM THE FEEDER TO THE EXISTING
REPLACE EXISTING DISCONNECT SERVING RECEPTACLES IN PLACE WITH NEW.
GROUNDING
P:\25072\25072e301.dgn
DGN FILE
30-SEP-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25072\25072e301.dgn
AS SHOWN
MJS
BCO
KMS
25072
09.30.2025
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
B a rn e s v il le
G e o rg ia
A lu m n i H a ll C h il le r
R e p la c e m e n t
N S T
R U
C T
C U
M E
N T S
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
MECHANICAL
CHILLER YARD
MECHANICAL
CHILLER YARD
NEW AIR COOLED CHILLER CHR-1
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
CHEMICAL FEED TANK
EXISTING
EXPANSION TANK
EXISTING
EXPANSION TANK
EXISTING
EXISTING P-2
EXISTING P-1
EXISTING P-3
EXISTING P-4
EXISTING VFD-1
EXISTING VFD-2
FEED TANK
CHEMICAL
EXISTING
EXISTING DDC
EXISTING UH-1
EXISTING CONCRETE PAD
CONCRETE PAD
EXISTING
T
T
B-1
EXISTING
EXISTING
B-2
CONCRETE PAD
EXISTING
EXISTING HA
EXISTING LA
TRANSFORMER
EXISTING PAD MOUNTED
EXISTING LIGHTING CONTROL PANEL
WP
WP
UNISTRUT FRAME
TO RECEPTACLE MOUNTED ON
UNDERGROUND AND STUBBED UP
EXISTING 3/4" CONDUIT ROUTED
WP WP
30A/3P/3R
FREC
ROUTED UNDER GROUND IN PLACE.
ABANDON EXISTING 3.5" CONDUIT
SCALE:
= 1'-0
4 0 2 4 8
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
CHEMICAL FEED TANK
EXISTING
EXPANSION TANK
EXISTING
EXPANSION TANK
EXISTING
EXISTING P-2
EXISTING P-1
EXISTING P-3
EXISTING P-4
EXISTING VFD-1
EXISTING VFD-2
FEED TANK
CHEMICAL
EXISTING
EXISTING DDC
EXISTING UH-1
EXISTING CONCRETE PAD
CONCRETE PAD
EXISTING
TO BE REMOVED
EXISTING AIR COOLED CHILLER
SCALE:
= 1'-0
4 0 2 4 8
T
T
B-1
EXISTING
EXISTING
B-2
MECHANICAL ROOM & CHILLER YARD - DEMOLITION - HVAC POWER
LARGE SCALE - ALUMNI HALL -
MECHANICAL ROOM & CHILLER YARD - NEW WORK - HVAC POWER
LARGE SCALE - ALUMNI HALL -
E301
NEW WORK - HVAC POWER
DEMOLITION &
& CHILLER YARD -
MECHANICAL ROOM
ALUMNI HALL -
CONCRETE PAD
EXISTING
F F
EXISTING HA
EXISTING LA
TRANSFORMER
EXISTING PAD MOUNTED
EXISTING LIGHTING CONTROL PANEL
EXISTING RECEPTACLE MOUNTED ON UNITSTRUT FRAME.1
WP
WP
UNISTRUT FRAME
TO RECEPTACLE MOUNTED ON
UNDERGROUND AND STUBBED UP
EXISTING 3/4" CONDUIT ROUTED
WP WP
NOTES:(LARGE SCALE 1 ONLY)
NOTES:(LARGE SCALE 2 ONLY)
WP
RECEPTACLES IS TO BE REPLACED IN PLACE.
EXISTING 30/3P/3R FUSED DISCONNECT SERVING DOWNSTREAM
CHILLER IS TO BE REPLACED IN PLACE.
EXISTING 400A/3P FUSED DISCONNECT SERVING EXISTING
RE-USE EXISTING CONDUIT AND CONDUCTORS.
PROVIDE A NEW 30A/3P/3R FUSED DISCONNECT IN PLACE OF EXISTING DISCONNECT.
400A/3P/3R
FCHILLER
GENERAL NOTES:(THIS SHEET ONLY)
A
DOCUMENTS AND ACTUAL CONDITIONS AT THE SITE MAY VARY.
OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT"
BEEN PREPARED USING "AS-DESIGN" DOCUMENTS. NEITHER THE
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE
B
TO COMPLETE THE DEMOLITION/NEW WORK.
CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED
SCOPE OF DEMOLITION/NEW WORK AND IN NO WAY RELIEVES THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL
C COORDINATE DEMOLITION WORK WITH NEW WORK.
D
AREA REQUIRING WORK.
COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO OR NEAR
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS,
E
TEXTURE, QUALITY, ETC.)
MATERIAL, SIZE, ALIGNMENT, JOINT WORK, FINISHES, COLOR,
SURFACES SHALL BE REPAIRED TO MATCH EXISTING (IN
MECHANICAL, ELECTRICAL, AND PLUMBING WORK), SUCH
WHERE SURFACES ARE DAMAGED BY DEMOLITION (INCLUDING
F
EXISTING SURROUNDINGS.
ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH
COVER FOR ANY ABANDONED BOXES. WHERE CONDUIT IN SLAB IS
SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK
LONGER BE IN USE TO THE POINT OF LAST TERMINATION. THERE
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO
30A/3P/3R
FREC
RECEPTACLE IS SERVED BY 30A FUSED DISCONNECT.
BACKBOX, CONDUIT, AND CONDUCTORS.
RECEPTACLE WITH WEATHERPROOF COVER. RE-USE EXISTING
REPLACE EXISTING RECEPTACLE WITH NEW GFCI TYPE
F F 200A/3P/3R
FCHILLER
30A/3P/3R
FREC
BE REMOVED
SUPPORT TO
EXISTING PIPE
EXTEND CIRCUIT AS REQUIRED WITH NEW 3#10AWG IN 3/4"C.
RE-USE EXISTING 3/4" CONDUIT AND 120V CIRCUIT FOR CONTROLS POWER.
SEAL ALL EXPOSED PENETRATIONS.
ON UNITSTRUT FRAME. CUT CONDUIT FLUSH TO SLAB AND
REMOVE EXISTING 3.5" AND 3/4" CONDUIT MOUNTED
ROUTED UNDER GROUND IN PLACE.
ABANDON EXISTING 3.5" CONDUIT
CHILLER CONTROLS
ON UNITSTRUT FRAME SERVING
EXISTING 3/4" CONDUIT MOUNTED
DISCONNECT.
DISCONNECT. RE-USE EXISTING CONDUCTORS AND CONDUIT SUPPLYING EXISTING
PROVIDE A NEW 200A/3P/3R FUSED DISCONNECT IN PLACE OF EXISTING 400A/3P/3R
MANUFACTURER'S RECOMMENDATIONS AND MAKE ALL FINAL CONNECTIONS
EXPOSED ALONG THE SAME PIPE PATH AS THE CHILLED WATER. INSTALL PER
PROVIDE NEW 3#4/0AWG CU, 1#6G, 2.5"C FROM FCHILLER TO NEW CHILLER. ROUTE
| 25072aCov |
| 25072m001 |
| References |
| tb, 25072tb.dgn |
| 25072m301 |
| References |
| tb, 25072tb.dgn |
| afp1, 25072afp.dgn |
| afp2, 25072afp.dgn |
| existing, 25072m301.dgn |
| 25072m401 |
| References |
| tb, 25072tb.dgn |
| 25072e001 |
| References |
| tb, 25072tb.dgn |
| 25072e301 |
| References |
| tb, 25072tb.dgn |
| afp1, 25072afp.dgn |
| afp2, 25072afp.dgn |
| existing, 25072e301.dgn |
| hvac new, 25072m301.dgn |
File details come from the government source that posted it. Updated .