About this file

This document is an Information for Bidders form from the State of Colorado Office of the State Architect for the Colorado Department of Transportation's Alamosa Drainage Project (Project No. 26570). The document provides comprehensive instructions for potential bidders, including requirements for bid submission, bid forms, and alternates. Bidders are required to use the attached bid form, indicate project completion timelines in calendar days, and submit a bid security of at least 5% of the bid price for projects estimated at $50,000 or more.

The bidding process includes specific provisions for bid evaluation, such as considering deductible and additive alternates in determining the lowest responsible bidder, with consideration given to the Colorado resident bidder preference. Additional key requirements include compliance with state and local laws, building codes, and regulations, with specific attention to apprenticeship, prevailing wage requirements, and environmental considerations such as reporting embodied carbon emissions. Bidders must exclude federal excise, manufacturers', state sales, and use taxes from their bids, and have the option to propose "or equal" materials with prior written approval from the Architect/Engineer.

View the file

Other files for this state and local contract opportunity

Other files attached to Alamosa Facility Grading & Drainage Improvements, newest first.
File Type Posted
Alamosa Drainage Project - Advertisement - Appendix D - Prevailing Wages.pdf PDF
Alamosa Drainage Project - Advertisement.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix C - Direct Labor Burden Calculation.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix B - Bid Form.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix B1 - Bid Bond Form.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix F - Performance Bond.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix M - Stormwater Management Plan.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix N - Right of Way Permit.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix E - Contract Wage Compliance Form.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix G - Labor and Material Bond.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix H - Sample Contract.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix I - Procedural Documents.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix J - Scope of Work.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix K - Construction Drawings.pdf PDF
Alamosa Drainage Project - Advertisement - Appendix L - Construction Specifications.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBP-6.12 Page 1 of 2 Rev. 05/2024

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAMS

INFORMATION FOR BIDDERS

Institution or Agency: Colorado Department of Transportation Project No./Name: 26570/Alamosa Drainage Project

1. BID FORM: Bidders are required to use the Bid form attached to the bidding documents. Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, also in calendar days. Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:

2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.

3. APPLICABLE LAWS AND REGULATIONS: The bidder’s attention is called to the fact that all work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.

4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.

5. TAXES: The bidder’s attention is called to the fact that the Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the

GENERAL CONDITIONS.

6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.

7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two (2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.

8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative. Bidders should note the Method of Award is applicable to this Bid as stated below.

A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the

SBP-6.12 Page 2 of 2 Rev. 05/2024 base bid combined with deductible alternates, deducted in numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid plus all additive alternates added in the numerical order in which they are listed in the alternates bid form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.

C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.

10. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation (Advertisement for Bids, Documented Quotes, or Requests for Proposals) whether settlement will be advertised in newspapers or electronic media.

STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
INFORMATION FOR BIDDERS
Colorado Department of Transportation
24741/Coal Creek 4+1 Bay VSF

File details come from the government source that posted it. Updated .