This document is an Acceptance Criteria List (ACL) for the DCCT (Direct Current Current Transformer) Module component of the Advanced Light Source Upgrade (ALS-U) Project at Lawrence Berkeley National Laboratory.
The ACL establishes quality assurance requirements for the unpackaged DCCT Module, designated as Category Code LS189505 with document number AL-1876-8204, Revision A, released March 3, 2026. The document specifies a "High" level of care for this component and identifies seven acceptance criteria that must be verified during acceptance testing. The acceptance criteria include: (1) design document compliance verification through review of the DCCT Module Technical Note AL-1752-7584; (2) visual inspection to confirm no damage affecting chassis functionality; (3) power supply initialization verifying the FLT12 status signal reads above 14.3 VDC; (4) positive current fault test with output set to +1A DC; (5) negative current fault test with output set to -1A DC; (6) signal generator and waveform verification confirming sine wave output at 20±2 Vpp and 10±1 Hz; and (7) verification of CH1 and CH2 sine wave signals at 0.52±.02Vpp with a 180°±0.1° phase shift. All verification procedures are documented in reference document AL-1876-8207, the SR DCCT-Module Acceptance Test Procedure. The PS (Power Supply) subsystem is identified as the verifying entity responsible for confirming compliance with each criterion through testing and documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response to Questions 2 - RFP MG 05212026.pdf | ||
| Response to Questions 1 - RFP MG 052122026.pdf | ||
| AL-1852-0746_SOW_C.pdf | ||
| Rep Cert Form RFP MG-05212026.docx | DOCX document | |
| AL-1752-7072_LT-EL-SR-PS-CTP-6302-01_REV-C.zip | ZIP file | |
| AL-1752-7073_LT-EL-SR-PS-CTP-6302-02_REV-C.zip | ZIP file | |
| AL-1752-7178B.pdf | ||
| RFP-LPTA MG05212026.pdf | ||
| Sample SubK MG-05212026.pdf | ||
| Price Proposal Schedule Attachment A - RFP MG-05212026.xlsx | XLSX spreadsheet | |
| AL-1752-7143B.pdf | ||
| GP-Commercial Supplies and Services.pdf | ||
| AL-1752-7584D.pdf | ||
| Past Performance Reference Information Form Attachment B.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
ALS-U SR DCCT-Module ACL
Release Date: Mar 3 2026 10:49:10 AM PST
Document Number: AL-1876-8204 Revision: A
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: LS189505
DCCT unpackaged
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
ZA
Downloaded by: Martha Gamarano Grausz at May 19, 2026 10:03:42
AL-1876-8204 Rev. A Doc. Status: Released Page 2 of 6
TABLE OF CONTENTS
Revision History
Approvals
Abbreviations and Acronyms
Authorizing Document
Reference
Acceptance Criteria Listing Form ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
AL-1876-8204 Rev. A Doc. Status: Released Page 3 of 6
REVISION HISTORY
Rev. CM Number Description of Change A Baseline
APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Approver Name Project Role (ex. Project Manager) Alessandro Ratti Accelerator Electrical Eng. Systems Lead Alessandro Morato ALS-U PS CAM/Tech Lead Danny Padrazo BNL Technical Representative William Waldron Accel. Electr. Eng. Systems Tech Deputy Jiani Niu ALS-U QA Manager Elliot Newman ALS-U Lead Systems Engineer Windchill Approved / Concurred By
ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ALS-U Advanced Light Source Upgrade LBNL Lawrence Berkeley National Laboratory QA Quality Assurance
AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111
LBNL ALS-U Quality Assurance Plan, AL-1024-3173
REFERENCE
AL-1876-8207, SR DCCT-Module Acceptance Test Procedure ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☒ High ☐ Medium ☐ Low
Prepared by: Group:
Email: Location:
Phone: Date:
Part Name: Quantity:
Part Number: S/N (if applicable)
NCR Reviewers
Additional Remarks:
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
AL-1876-8204 Rev. A Doc. Status: Released Page 5 of 6
Develop at design phase Fill out after acceptance work
NO. REQ ID Acceptance Criteria Description Supporting
Procedure ID
Verifying
Entity
NCR ID
(if any) Actual Value
Verification
Outcome
Verification
Report/Traveler
0.
260-274
(datasheet verification)
Acceptance criteria compliance through design document review
(Type Verification)
DCCT Module
Technical
Note:
AL-1752-7584
PS
subsystem
PASS ☐
FAIL ☐
INITIALS
DATE
1. N/A
Visual Inspection
Visually inspect the DCCCT Module.
Verify that there is no damage affecting the chassis functionality.
“Visual
Inspection” in
AL-1876-8207
2. N/A
Power Supply Initialization
Verify that the FLT12 status signal reads above 14.3 VDC when DCCT Module is powered by Lab PS
“Power
Supply
Initialization” in AL-1876-
3.
Positive Current Fault Test
With the Kepco Power Supply output set to +1A DC, slowly lower the −15 V output on the Lab PS and verify that the
FLT12 status signal on the DMM drops below 1 VDC.
“Positive
Current Fault
Test” in AL-
1876-8207
4. N/A
Negative Current Fault Test
With the Kepco Power Supply output set to -1A DC, slowly lower the −15 V output on the Lab PS and verify that the
FLT12 status signal on the DMM drops below 1 VDC.
“Negative
Current Fault
Test” in AL-
1876-8207 ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
AL-1876-8204 Rev. A Doc. Status: Released Page 6 of 6
Develop at design phase Fill out after acceptance work
5. N/A
Signal Generator and Waveform
Verification
With the Signal Generator controlling the Kepco Power Supply with a ±10V
10Hz sin wave:
Verify Ch3 of Oscilloscope sees a sin wave at 20±2 Vpp, 10±1 Hz
“Signal
Generator and
Waveform
Verification” in AL-1876-
6.
Verify:
CH1 and CH2 display sine wave signals with 0.52±.02Vpp
“Signal
Generator and
Waveform
Verification” in AL-1876-
7.
Verify:
CH2 and CH1 have a phase shift of 180°
± 0.1°
“Signal
Generator and
Waveform
Verification” in AL-1876-ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ar ch rd , 2
D C
C A ut h
K ey
: E O
N 1R
Q
EL
File details come from the government source that posted it. Updated .