This document is an Acceptance Criteria List (ACL) for the DCCT (Direct Current Current Transformer) Module component of the Advanced Light Source Upgrade (ALS-U) Project at Lawrence Berkeley National Laboratory.

The ACL establishes quality assurance requirements for the unpackaged DCCT Module, designated as Category Code LS189505 with document number AL-1876-8204, Revision A, released March 3, 2026. The document specifies a "High" level of care for this component and identifies seven acceptance criteria that must be verified during acceptance testing. The acceptance criteria include: (1) design document compliance verification through review of the DCCT Module Technical Note AL-1752-7584; (2) visual inspection to confirm no damage affecting chassis functionality; (3) power supply initialization verifying the FLT12 status signal reads above 14.3 VDC; (4) positive current fault test with output set to +1A DC; (5) negative current fault test with output set to -1A DC; (6) signal generator and waveform verification confirming sine wave output at 20±2 Vpp and 10±1 Hz; and (7) verification of CH1 and CH2 sine wave signals at 0.52±.02Vpp with a 180°±0.1° phase shift. All verification procedures are documented in reference document AL-1876-8207, the SR DCCT-Module Acceptance Test Procedure. The PS (Power Supply) subsystem is identified as the verifying entity responsible for confirming compliance with each criterion through testing and documentation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory

Latest version of this document can be found in the LBNL Document Control Center.

A hardcopy of this document is for reference ONLY.

ALS-U SR DCCT-Module ACL

Release Date: Mar 3 2026 10:49:10 AM PST

Document Number: AL-1876-8204 Revision: A

Document Status: Released

Document Type: ACCEPTANCE CRITERIA LIST (ACL)

Category Code: LS189505

DCCT unpackaged

O ffi ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

ZA

Downloaded by: Martha Gamarano Grausz at May 19, 2026 10:03:42

AL-1876-8204 Rev. A Doc. Status: Released Page 2 of 6

TABLE OF CONTENTS

Revision History

Approvals

Abbreviations and Acronyms

Authorizing Document

Reference

Acceptance Criteria Listing Form ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

AL-1876-8204 Rev. A Doc. Status: Released Page 3 of 6

REVISION HISTORY

Rev. CM Number Description of Change A Baseline

APPROVALS

The following individual(s) shall approve this document:

Approver Project Role Approver Name Project Role (ex. Project Manager) Alessandro Ratti Accelerator Electrical Eng. Systems Lead Alessandro Morato ALS-U PS CAM/Tech Lead Danny Padrazo BNL Technical Representative William Waldron Accel. Electr. Eng. Systems Tech Deputy Jiani Niu ALS-U QA Manager Elliot Newman ALS-U Lead Systems Engineer Windchill Approved / Concurred By

ABBREVIATIONS AND ACRONYMS

ALS Advanced Light Source ALS-U Advanced Light Source Upgrade LBNL Lawrence Berkeley National Laboratory QA Quality Assurance

AUTHORIZING DOCUMENT

LBNL QA Plan PUB 3111

LBNL ALS-U Quality Assurance Plan, AL-1024-3173

REFERENCE

AL-1876-8207, SR DCCT-Module Acceptance Test Procedure ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

ACCEPTANCE CRITERIA LISTING FORM

Level of Care : ☐ Very High ☒ High ☐ Medium ☐ Low

Prepared by: Group:

Email: Location:

Phone: Date:

Part Name: Quantity:

Part Number: S/N (if applicable)

NCR Reviewers

Additional Remarks:

ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

AL-1876-8204 Rev. A Doc. Status: Released Page 5 of 6

Develop at design phase Fill out after acceptance work

NO. REQ ID Acceptance Criteria Description Supporting

Procedure ID

Verifying

Entity

NCR ID

(if any) Actual Value

Verification

Outcome

Verification

Report/Traveler

0.

260-274

(datasheet verification)

Acceptance criteria compliance through design document review

(Type Verification)

DCCT Module

Technical

Note:

AL-1752-7584

PS

subsystem

PASS ☐

FAIL ☐

INITIALS

DATE

1. N/A

Visual Inspection

Visually inspect the DCCCT Module.

Verify that there is no damage affecting the chassis functionality.

“Visual

Inspection” in

AL-1876-8207

2. N/A

Power Supply Initialization

Verify that the FLT12 status signal reads above 14.3 VDC when DCCT Module is powered by Lab PS

“Power

Supply

Initialization” in AL-1876-

3.

Positive Current Fault Test

With the Kepco Power Supply output set to +1A DC, slowly lower the −15 V output on the Lab PS and verify that the

FLT12 status signal on the DMM drops below 1 VDC.

“Positive

Current Fault

Test” in AL-

1876-8207

4. N/A

Negative Current Fault Test

With the Kepco Power Supply output set to -1A DC, slowly lower the −15 V output on the Lab PS and verify that the

FLT12 status signal on the DMM drops below 1 VDC.

“Negative

Current Fault

Test” in AL-

1876-8207 ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

AL-1876-8204 Rev. A Doc. Status: Released Page 6 of 6

Develop at design phase Fill out after acceptance work

5. N/A

Signal Generator and Waveform

Verification

With the Signal Generator controlling the Kepco Power Supply with a ±10V

10Hz sin wave:

Verify Ch3 of Oscilloscope sees a sin wave at 20±2 Vpp, 10±1 Hz

“Signal

Generator and

Waveform

Verification” in AL-1876-

6.

Verify:

CH1 and CH2 display sine wave signals with 0.52±.02Vpp

“Signal

Generator and

Waveform

Verification” in AL-1876-

7.

Verify:

CH2 and CH1 have a phase shift of 180°

± 0.1°

“Signal

Generator and

Waveform

Verification” in AL-1876-ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch rd , 2

D C

C A ut h

K ey

: E O

N 1R

Q

EL

File details come from the government source that posted it. Updated .