AL-1704-8935A.pdf
PDF 4 MB Posted
- Attached to
- LBL ALS-U Crotch Chamber Tank SR
- Solicitation number
- JS-2024-005_RFQ
- Issued by
-
Department of Energy
About this file
This document is a Specification for the manufacturing design, fabrication, dimensional inspection, fiducialization, vacuum testing, and delivery of two types of vacuum chambers, VC12-IR and VC12-Diag, for the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory (LBNL).
The key details include:
- The VC12-IR chambers are located in sectors 2, 5 and 10, and the VC12-Diag chamber is located in sector 7 of the storage ring.
- The subcontractor is required to provide a first article unit, followed by the complete production quantities of 3 VC12-IR chambers and 1 VC12-Diag chamber.
- Detailed requirements are provided for the subcontractor's quality plan, control plan, manufacturing documentation, testing, packaging, and shipping.
- The subcontract will be issued under LBNL's prime contract with the Department of Energy. LBNL will provide oversight and approval of key deliverables and milestones.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AL-1686-7718B.pdf | ||
| AL-1580-1800D.pdf | ||
| AL-1704-5291A.pdf | ||
| AL-1620-9887A.pdf | ||
| AL-1454-4437A.pdf | ||
| AL-1453-7407A.pdf | ||
| AL-1454-2764A.pdf | ||
| AL-1454-2756A.pdf | ||
| AL-1559-8951A.pdf | ||
| 6. AL-1208-0209 ALS-U QA Survey.pdf | ||
| AL-1698-2423A.pdf | ||
| 01 JS-2024-005 RFQ.pdf | ||
| 5. Rep Cert Form.docx | DOCX document | |
| 4b. GP-Commercial Foreign.pdf | ||
| AL-1709-7009A.pdf | ||
| AL-1220-7841F.pdf | ||
| AL-1705-5717A.pdf | ||
| AL-1704-8936A.pdf | ||
| 4a. GP-Commercial Domestic.pdf | ||
| AL-1713-7011A.pdf | ||
| AL-1704-8934A.pdf | ||
| AL-1476-9886A.pdf | ||
| AL-1453-8149E.pdf | ||
| 02 Sample Subcontract .pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR - VC12-IR & VC12-Diag - SOW
Thomas GAUCHER
Release Date: Apr 10 2024 10:04:22 AM PDT
Document Number: AL-1704-8935 Revision: A
Document Status: Released
Document Type: SPECIFICATION
Category Code: AL7531
ALS-U - STORAGE RING
VACUUM CHAMBERS
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D Z4
Downloaded by: Thomas Gaucher at April 11, 2024 07:24:04
AL-1704-8935 Rev. A Doc. Status: Released Page 2 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Table of Contents
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Introduction
4.1 Project Overview
4.2 Scope Overview
4.3 Description of Items
4.3.1 VC12-IR
4.3.2 VC12-Diag
4.4 Roles and Responsibilities
5 Deliverables
5.1 Deliverables
5.1.1 Documentation Deliverables
5.1.2 Drawings and CAD Models Deliverables
5.1.3 LBNL provided models and drawings
5.1.4 Hardware Deliverables
5.1.4.1 Components included
5.1.4.2 First article
5.1.4.3 Production
5.2 Scope of Work Execution Requirements
5.2.1 Management and Quality Assurance
5.2.2 Final Design Review Requirements
5.2.3 First article
5.2.4 First article delivery
5.2.5 Complete Production
5.2.6 Delivery
5.3 Final documentation package(s)
6 Management, Reporting, Documentation and reviews
6.1 Schedule
6.2 Reporting requirements
6.3 Proposal documentation requirements
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 3 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.4 Reviews
6.5 Hold points
7 Fabrication
8 Packaging and shipping specifications
8.1 Container
8.2 Marking
8.3 Packaging
8.4 Handling and storage
9 Quality Assurance
9.1 Quality plan
9.2 Control plan
9.3 Type of control points
9.4 Deviation requests
9.5 Nonconformance reports
9.6 Numbering and/or Serialization
9.7 Completed ACL
10 Applicable Documents
Appendix A: Control Plan
Appendix B: CAD Model and drawing requirements ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 4 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline
2 APPROVALS
The following individual(s) must approve this document:
Approver Project Role Ken Chow Chief Engineer/ Accelerator Mechanical
Systems lead Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM and Technical Lead Windchill Approved / Concurred By
KPChow,jianiniu,oomolayo
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ACL Acceptance Criteria List ALS-U Advanced Light Source Upgrade ARO After Receipt of Order CAD Computer Aid Design CMM Coordinate Measuring Machine CP Control Plan FAT Factory Acceptance Test FDR Final Design Review HP Hold Point
ID
KOM
Insertion Device Kick Off Meeting
LBNL Lawrence Berkeley National Laboratory LCW Liquid Cooled Water NCR Nonconformance Report NP Notification Point NTP Notification To Proceed SR Storage Ring UHV Ultra High Vacuum VC Vacuum Chamber W Witness ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 5 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
4 INTRODUCTION
4.1 Project Overview
ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9
GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to
40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat (MBA) lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
Any resulting Subcontract will be between the University and the party identified as the
Subcontractor and will be issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter “U.S.
Government”), represented by the Department of Energy (hereinafter “DOE”) for the management and operation of LBNL and the performance of research and related work.
4.2 Scope Overview
This scope of work is for the final manufacturing design, fabrication, dimensional inspection, fiducialization, vacuum testing and delivery of vacuum chambers for the ALS-
U project. There are two types of vacuum chambers in this scope – VC12-IR & VC12-Diag.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 6 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
4.3 Description of Items
The VC12-IR chambers are located in sector #2, #5 and #10 and VC12-Diag is located on the sector #7 of the Storage Ring (SR). Each sector of the SR is divided into units comprising one straight section and one arc section. The arc section is further divided into four raft units as depicted inFigure 4-4. Each raft includes magnets, vacuum chamber assemblies, and support structures, as illustrated in Figure 4-3. The VC12-IR and Diag chambers as shown consist an electron beam and a photon beam channel that share the same upstream flange. and an electron beamline on the downstream. In both cases the electron beam exists at the downstream flange while the photon beam is deflected out of the top port of the chamber using a mirror -M1. The mirror is not in this scope of work.
Figure 4-1: VC12-IR
Figure 4-2: VC12-Diag
Upstream
Downstream ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 7 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Figure 4-3: Sector 3 Raft #4 VC12-IR support / Magnet, VC12-IR and support
VC12-IR
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
All officially released LBNL documents are watermarked and contain LBNL Document
Figure 4-4: Sector #4 (Magnet, Vacuum chamber and support)
Straight Section Bend Section
Raft # 01
Bend Section
Raft # 02
Bend Section
Raft # 03
Bend Section
Raft # 04 Electron Beam Direction ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
All officially released LBNL documents are watermarked and contain LBNL Document
4.3.1 VC12-IR
The VC12-IR chamber is designed for housing the M1 mirror for the IR beamline. It also absorbs thermal loads passing through the mirror as well as provide ports for pumping.
The chamber is primarily constructed from 316L stainless steel, copper C18150, and
C10100. The chamber incorporates the following features:
A DN40 gauges port (1)
A DN100 NEG cartridge port (2)
A DN100 Gate valve port (3)
A DN125 for Mirror + its ancillaries port (4)
An angle valve port (5)
Figure 4-5 VC12-IR + its features
The upstream flange features a keyhole aperture to allow passage for the electron beam and the photon beam
The downstream of the vacuum chamber has one flange for the electron beam
On VC12-IR, only the main beam chamber (AL-1453-8149) is a part of the scope. The image in Figure 4-5 with the entire features is for illustrative purpose.
(1)
(3)
(2)
(4)
(5)
Upstream side
Downstream side ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 10 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
4.3.2 VC12-Diag
The VC12-Diag chamber is for design for housing the M1 mirror for the diagnostic beamline. It also acts as a crotch absorber as well as provide ports for pumping. The VC12-
Diag is primarily constructed from 316L stainless steel, copper C18150, and C10100. The chamber incorporates the following features
A DN40 gauges port (1)
A DN100 NEG cartridge port (2)
A DN100 port for viewport (3)
A DN100 port for diagnostic system (4)
DN40 port (5)
Figure 4-6 VC12-Diag + its features
The upstream flange features two apertures to allow passage for the electron beam and the photon beam
The downstream of the vacuum chamber has one flanges for the electron beam
On VC12-IR, only the main beam chamber (AL-1476-9886) is part of this scope. The image in Figure 4-6 with the entire features is for illustrative purposes.
(3)
(2)
(4)
(5)
Upstream side
Downstream side ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 11 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
4.4 Roles and Responsibilities
The subcontract will name two University specialists to oversee the contractual and technical aspects of the procurement:
The University Procurement Specialist is responsible for contract administration from solicitation to subcontract award, and any contractual issues that arise thereafter.
The University Technical Representative is responsible for the technical aspects, beginning with the subcontract award through receipt and acceptance of deliverables.
The Subcontractor must identify a project manager who will act as the single point of contact for the University representatives. The project manager must be available for the duration of the subcontract to resolve issues and provide technical, programmatic, and schedule updates as specified in this SOW and in the subcontract.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 12 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5 DELIVERABLES
This section details the required hardware and documentation deliverables for each phase of the subcontract execution process. It also details the technical management and oversight requirements during the execution process.
5.1 Deliverables
5.1.1 Documentation Deliverables
Table 5-1 provides the list of documentations to be provided by the selected Subcontractor to LBNL. Fabrication cannot start prior to the review, approval, and closure of all related FDR action items.
Table 5-1: List of subcontractor produced documentation and reports Id Documentation Due Date
Schedule and Progress reports 1 Initial schedule 7 days ARO
2 Weekly status / progress meeting For the duration of the contract 3 Monthly status Summary & Updated Schedule 5th of each month
Quality Documentation 4 Management and Quality Plan (5.2.1) 7 days ARO 5 Control plan (see Table 5-8 and §9.1) 10 days before FDR 6 Control plan duly completed and signed 10 days prior shipment 7 Acceptance Criteria List duly completed and signed 10 days prior shipment
Manufacturing Documentation 8 Manufacturing Drawing 10 days before FDR 9 Final 3D model 10 days before FDR 10 Bill of Material 10 days before FDR 11 Manufacturing plan (see Table 5-8) 10 days before FDR 12 Test Plan and Associated procedures (see Table 5-8) 10 days before FDR 13 Test report (dimension, He leak, etc…) 10 days prior shipment
14 Nonconformance Report or / and deviation request Within 3 business days of occurrence
15 Material Certification 10 days before manufacturing
Delivery documentation 16 List of packing crates and contents 10 days prior shipment 17 Shipping plan (see §8) 10 days prior shipment
Other 18 Certificate of Conformance 10 days prior shipment 19 Final document package (see §5.3) 10 days prior shipment
*Days noted herein are based on a 5 business day work week ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 13 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5.1.2 Drawings and CAD Models Deliverables
LBNL will provide the vendor with final drawings and CAD models. The fabrication must take into consideration all requirement of the Engineering Specification Document AL-
1704-8934. The vendor is able to propose changes to the design for ease of manufacture or improved performance. Such changes will be reviewed and approved/declined by
LBNL technical representative. The tolerances and dimensions stipulated in the LBNL drawings must be respected except in cases where a waiver in writing, has been explicitly provided by LBNL technical representative.
5.1.3 LBNL provided models and drawings
LBNL is providing the vendor the design information packages, see Table 5-2
Table 5-2: LBNL design package type
Id Drawing Description
1 AL-1453-8149 WLDMT, VC12 –IR, SR
2 AL-1476-9886 WLDMT, VC12 –Diag, SR
3 AL-1705-5717 Flange, Obround, Blank
4 AL-1698-2423 Flange, RF, Gen II QF50 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 14 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5.1.4 Hardware Deliverables
The schedule and phasing of hardware delivery is defined in this section
5.1.4.1 COMPONENTS INCLUDED
In addition to the vacuum chambers, each chamber delivery must include blank flanges, fittings, support brackets and chambers supports as listed in Table 5-3 for VC12-IR and in Table 5-4 for VC12-Diag. LBNL will supply vacuum seals, chain clamps and fiducialization hardware as illustrated in. Table 5-5.
Table 5-3 Components that subcontractor will source or manufacture for VC12-IR ID Features Illustration LBNL ID
1 VC12-IR
AL-1453-8149
DN100,
Blank flange
HW-1001-0102
DN125, Blank flange
HW-1000-2063
DN40, Blank
HW-1000-7177
Obround
AL-1705-5717
QF50, Blank
AL-1698-2423
Fitting 8mm
OD
HW-1000-5922
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 15 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Table 5-4 Components that subcontractor will source or manufacture for VC12-Diag ID Features Illustration LBNL ID
1 VC12-Diag
AL-1476-9886
DN100,
Blank flange
HW-1001-0102
DN125, Blank
HW-1000-2063
DN40, Blank
HW-1000-7177
Obround
AL-1705-5717
QF50, Blank
AL-1698-2423
Fitting 8mm
OD
HW-1000-5922
DN16, Blank
HW-1000-7614
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 16 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Table 5-5: Materials to be Integrated provided by LBNL
Id Features Illustration LBNL ID Quantity
Flange Chain Clamps
DN50
HW-1000-3036 6
Seal Helicoflex
2.290”ID
HW-1000-7226 6 + 2
7 Oval Helicoflex seal
HW-1000-9647 6 + 2
9 Pressure ring QF50
AL-1614-6599 24
Fiducial ball
½ inch
AL-1551-3974
Lump sum
Note: The additional number in the "quantity" column represents the quantity of spares provided by LBNL to the vendor any spare items that have not been consumed subsequent to LBNL receipt of all deliverables at the conclusion of the effort must be returned to
LBNL.
5.1.4.2 FIRST ARTICLE
The selected subcontractor is required to produce one chamber and its ancillaries as the first article.
Table 5-6: List of first articles
5.1.4.3 PRODUCTION
Table 5-7 list the production articles and the respective quantities. The quantities include one spare as determined by LBNL. The subcontractor can propose the delivery order and batches otherwise full delivery in a single shipment applies.
Table 5-7: List of production articles
Id Drawing ID Description Qty Due Date
1 AL-1709-7009 VC12-IR + all features 3 24 weeks
After First Article
Approval 2 AL-1713-7011 VC12-Diag + all features 1
Id 2D drawing Description Qty Due Date
1 AL-1709-7009 VC12-IR + all features 1 16 weeks After FDR Approval ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 17 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5.2 Scope of Work Execution Requirements
5.2.1 Management and Quality Assurance
The selected subcontractor will be responsible for supplying an initial Schedule and a
Quality Plan within 7 days ARO. This must include organizational policy on quality, controlled documents for Non-conformance, material inspection, and subcontractor qualification (see §9.1)
5.2.2 Final Design Review Requirements
A final design review is required once the subcontractor has completed the detail manufacturing design for all chambers and tooling. The selected subcontractor must be responsible for supplying all documentations related to the FDR prior to fabrication of the chambers. Documentations must take into account the VC12-IR & VC12-Diag
Chambers engineering specification (AL-1704-8934).
CAD model and drawing requirements are detailed in Appendix B:
The FDR is required to include the following documentation:
1. Control Plan1 and Manufacturing plan1 for the VC12-IR & VC12-Diag Chambers
2. Final manufacturing drawings (Required if Design was modified)
3. Final CAD model (Required if Design was modified)
4. Test plan and associated procedures
5. Bill of material
Close out of the FDR includes review, written approval, and resolution of all related FDR action items prior to fabrication. This is also required to satisfy the Notice to Proceed, reference §9.3.
1 See Table 5-8 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 18 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Table 5-8: Documentation description Documents Description
Manufacturing plan
The manufacturing plan documents step-by-step all the manufacturing process from the procurement of raw material to the delivery (except tests for FAT, which are covered in the test plan). The manufacturing plan has to contain at least the following details:
Standards required for the procurement of raw material
Description of each step of the fabrication
Internal procedures applicable to this effort
Procedures and/or standards used for fabrication must be referenced in the manufacturing plan.
Test Plan
The test plan at a minimum documents step-by–step activities of all tests prior to the FAT to validate the vacuum hardware such as:
He leak test
Bakeout
RGA
Outgassing rate
Beam center measurement in reference to fiducials
All criteria relative to tests performed have to be mentioned in the test plan. Procedures and/or standards used for tests must be referenced in the test plan.
Control plan
The control plan must describe all steps of the fabrication, including, verification of materials, manufacturing/execution operations, inspection, tests and delivery and any work to be performed by subcontractor. LBNL will provide a template to the selected subcontractor (see §9.2 for more detail) ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 19 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5.2.3 First article
Following approval of the FDR, a first article will be produced. The first article will be subjected to the same testing and quality assurance processes as the production units.
After assessments of the first article, LBNL will give the selected subcontractor approval for the rest of the production. Reference §5.1.4.2 First Article, and §9.3 Notice to Proceed for additional information.
5.2.4 First article delivery
The selected subcontractor will be responsible for delivering the complete production to LBNL in accordance with the parameters outlined in this document. Refer to section §5.2.6 for the delivery conditions.
5.2.5 Complete Production
In accordance with section 5.2.3 LBNL will give final approval for the commencement of fabrication of the production units once the first article unit has been received and satisfactorily tested.
Prior to shipment of the production units, the subcontractor must provide the following:
1. Complete VC12-IR & VC12-Diag Chambers packed in an appropriate crate.
2. Completed FAT and associated reports
3. Final and completed CP
4. Final and completed ACL
5. Quality assurance receipts and certifications
6. Nonconformance or deviation documentation pertaining to each individual assembly
7. Final, approved shipping plan
8. Written authorization from LBNL to proceed with shipping
LBNL personnel reserve the right to perform an evaluation of hardware, documentation, and shipping scheme at the subcontractor’s production site prior to authorizing shipment.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 20 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
5.2.6 Delivery
The selected subcontractor will be responsible for delivering the complete production to LBNL in accordance with the parameters outlined in this document. The VC12-IR & VC12- Diag chamber shall be delivered as depicted in the picture below and under nitrogen.
Figure 5-1: View of the VC12-IR ready to be delivered
Figure 5-2: View of the VC12-Diag ready to be delivered
5.3 Final documentation package(s)
LBNL will be provided a full and complete documentation package at the end of the production. Refer to Appendix B: for specific file requirements. The documentation package must contain the items listed below.
1. A complete, as-built bill of materials identifying both fabricated and commercially available components
2. A complete, as built CAD model in an editable format
3. Complete, as built drawings in English, and in an editable format.
4. Other documentation as requested ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 21 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 MANAGEMENT, REPORTING, DOCUMENTATION AND REVIEWS
6.1 Schedule
The following table provides the main schedule items and hold points.
Table 6-1: Summary of timetable of the project
Section # Designation Schedule Responsibility
§5.2.1 Management and
Quality plan 7 days ARO subcontractor
§5.2.2 Final VC12-IR & VC12- Diag Chambers design review (FDR) 4 weeks ARO subcontractor
HP#1 Approval of the FDR 2 weeks after completion of
FDR
LBNL.
§5.2.3 Completion of Manufacturing (First article)
16 weeks after approval of FDR subcontractor
§5.2.4 Delivery
(First article) 2 weeks after completion of manufacturing subcontractor
HP#2
Approval of the first article 2 weeks after delivery
LBNL.
§5.2.5 Completion of Manufacturing (Production)
24 weeks after approval of first article subcontractor
HP#3
Approval of the production 2 weeks after completion of each manufacturing batch
LBNL.
§5.2.6 Delivery 2 weeks after each approval of manufacturing batch subcontractor ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 22 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.2 Reporting requirements
Upon award of the subcontract, the LBNL technical representative will contact the selected subcontractor to set up a Project Kick-off meeting. This meeting will establish the requirements for communication and introduce the portal that will be used for data exchange.
Written progress updates are required on before the fifth of each month. This may include drawings, manufacturing plans, test plans, QA plans, schedule updated or other documents upon request in any state.
Visits by LBNL personnel, including access to the factory where the units are being built, as the discretion of LBNL, may be required.
Subcontractor must be responsible for maintaining an action item list for documenting the actions resulting from each meeting, identifying the responsible party and providing an anticipated completion date for each action.
Other reports or data as requested in writing.
6.3 Proposal documentation requirements
Upon subcontract award, a Windchill Project portal will be established by LBNL and access provided to the subcontractor. Windchill will be used as the repository for all information, QA data, and drawing transference related to the magnet development and production. A brief overview of Windchill will be provided at the kickoff meeting.
Additional training may be available upon request.
An electronic copy of all required documentation noted in the Deliverables section of this document is required. Appendix B: specifies acceptable file formats for the final drawings and CAD models.
Other document formats include .docx, .xlsx, and other editable file formats may be used with advance written approval from the LBNL technical representative.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 23 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.4 Reviews
A final design review is required for this project. The LBNL technical representative will work with the subcontractor to establish an appropriate timeline and location for all reviews. Reviews may be conducted at either the subcontractor’s or the LBNL site or via web/video conference tools. External, non-LBNL reviewers may be included at LBNL’s discretion.
Review drawings, documentation, and presentations are required to be delivered to the
LBNL technical representative a minimum of 10 business days prior to the scheduled review.
6.5 Hold points
The Table 6-2 provides the list of control points. Additional control points may be identified following review of the Control Plan §9.2.
Table 6-2: List of hold points
Section Activity Control point Type §5.2.2 Closeout of FDR NTP §5.2.4 Approval of first article NTP §5.2.5 Approval of complete production NTP
Control point types are defined in §9.3.
7 FABRICATION
The selected subcontractor must follow the SR - VC12-IR & VC12-Diag - ESD referenced as AL-1704-8934 for the fabrication of all chambers.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 24 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
8 PACKAGING AND SHIPPING SPECIFICATIONS
The selected subcontractor must submit to LBNL a shipping plan and be approved in writing by LBNL before the first shipment. The following points must be described in the shipping plan
8.1 Container
Containers or crates for the VC12-IR & VC12-Diag Chambers may be used for both shipping and storage. Construction of the containers must be sufficient to adequately support and protect the chambers throughout shipping.
Crates must be reusable with sides that attach using clips or other standard attachments that allow for ease of disassembly and/or reuse. LBNL must evaluate and approve shipping crate designs prior to fabrication of the crates or utilizing them for shipping.
Crates can contain multiple chambers. The crates must be strapped on all sides prior to and during shipment.
8.2 Marking
The exterior of the crates must have markings that clearly identify tie-downs, lifting points, and the crate center of gravity.
Mark the exterior of the crate with clear and obvious labels indicating the presence of fragile contents. Shipments originating outside of the United States must have pictorial labels or labels written in both the originating native language and English.
The exterior of the crate must have up arrows indicating the appropriate crate orientation.
Crates must be marked with the serial numbers of each chambers contained therein.
All shipping containers must be labeled with all subcontract information including subcontract number, LBNL point of contact individual, and delivery information.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 25 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
8.3 Packaging
All VC12-IR & VC12-Diag Chambers including cooling channels must be free of any liquid prior to shipping. The use of desiccant is strictly forbidden.
The chambers must be blocked/cribbed/supported to prevent movement or overstressing the component during transport. The following must be included:
Each chamber needs to be assembled along with each associated LCW fitting, cooling tube loops, steel support(s), flange blanks and chain clamps
Placement of foam between the chambers (if crate contains multiple chambers)
Placement of foam between the chambers and the sides of the crate to assist in minimizing movement during transportation.
Chambers shipping containers should incorporate a moisture barrier to prevent condensation during air shipment.
The exterior of the crate must have self-adhesive shock indicators affixed.
8.4 Handling and storage
The subcontractor must pay particular attention during phases of lifting operation to avoid damage on the chambers
Should the chambers require storage, the storage location must be a temperature and moisture controlled, secured storage facility. Ambient air temperature during storage is between 10 C and 40 C.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 26 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
9 QUALITY ASSURANCE
The VC12-IR & VC12-Diag Chambers must follow the same quality assurance during the first article and production fabrication. The quality assurance is depicted in the following subsection.
9.1 Quality plan
As part of our project requirements, we are requesting that the vendor provide a comprehensive quality plan to ensure the successful execution and delivery of the project.
The quality plan should encompass various essential components to guarantee adherence to high standards throughout the project lifecycle. Below are the specific elements that should be included:
Quality Manual: The vendor must provide a detailed quality manual outlining the company's quality management system (QMS). This manual should encompass all relevant quality procedures, standards, and methodologies adopted by the company to ensure consistency and effectiveness in delivering quality products or services.
Organizational Chart: An organizational chart specific to the project should be included, illustrating the hierarchical structure of the team involved. This chart will help delineate roles, responsibilities, and reporting lines within the project team, ensuring clarity and accountability.
Key Personnel: A list of key personnel involved in the project, along with their respective roles and responsibilities should be provided. This includes project managers, quality assurance personnel, technical experts, and any other relevant stakeholders critical to the project's success.
Subcontractor Information: If any subcontractors are engaged in the project, their names, roles, and scope of work should be clearly stated in the quality plan.
Additionally, measures to ensure the quality and performance of subcontracted work should be outlined.
Project-Specific Procedures: The quality plan should outline specific procedures and protocols to be applied within the context of the project. This may include quality control measures, inspection processes, testing methodologies, and any other relevant procedures tailored to the project's requirements.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 27 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
QA Documentation Presentation: A presentation of the quality assurance (QA) documentation should be included, highlighting the key documents, records, and forms utilized to manage and track quality throughout the project lifecycle. This shall include Control Plans (see §9.2), inspection reports, non-conformance reports (see §9.5), deviation request (see §9.4) and corrective action plans.
9.2 Control plan
The Control Plan must cover the entire scope of the phase/task, including any work to be performed by subcontractors like verification of materials, manufacturing/execution operations, inspection and test and delivery. LBNL will provide the selected subcontractor the template of Control Plan (see Appendix A:) and applicable document in §10.
Each activity once finished must be dated and signed by the subcontractor and the LBNL technical representative. The identification of the records released during activity execution (test report, dimensional report, NCR) must be registered with the Control Plan. The Control Plan must be delivered to and approved by the University prior to the FDR. Notification points (NP, W, HP) will be added by LBNL before returning to the selected subcontractor.
9.3 Type of control points
Notification point (NP): means that a notification must be sent to the entity before a task is performed. The notified can decide to visit or not. NP does not affect the production flow of the selected subcontractor. Notification sent to LBNL 10 working days before scheduled operation, LBNL will respond to the subcontractor within 5 working days of the scheduled operation of its intention.
Witness (W): means a visit/presence at the action to witness/monitor. Action cannot occur without the presence or without a written waiver. The production flow is interrupted (before the action) in order to allow the mandatory inspection/surveillance.
Notification sent to LBNL 10 working days before scheduled operation, LBNL will respond to subcontractor within 5 working days of schedule operation of its intention.
In case of “no-show” of a technical representative or delegate: the subcontractor must formally notify the technical representative and may proceed with production after 2 working days.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 28 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Hold point (HP): the process and all related activities cannot continue (work cannot proceed beyond this point) without the relevant HP being cleared. This can be a record of acceptance, an event or a written waiver. Production flow for the associated process is interrupted (after the action) until clearance is given.
Notification sent to LBNL 10 working days before scheduled operation, LBNL notifies the selected subcontractor within 10 working days of the result on the HP activity:
o On rejection: The selected subcontractor has 5 working days to propose a recovery plan, o On objection (duly justified): The selected subcontractor has 10 working days to answer (and if applicable propose a recovery plan).
For HP requiring witness by LBNL, in case of “no-show” of a technical representative or delegate: the subcontractor must formally notify the technical representative and may proceed with production after 2 working day.
Notice to Proceed (NTP): the current process cannot continue (next tasks) without the relevant NTP being cleared. The NTP notification point for this contract must be the following:
Successful completion and acceptance of the FDR. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied.
Successful completion and acceptance of the First article. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied
Successful completion and acceptance of production articles test report prior to shipment. LBNL will provide a written approval to the selected subcontractor indicating the NTP that has been satisfied
9.4 Deviation requests
Any deviations from the LBNL documents must be requested by the subcontractor and approved by LBNL prior to implementation. LBNL will provide a standard deviation request form however; a subcontractor’s existing or internal document may be utilized with LBNL approval. Deviation requests apply to requests to modify processes or documented drawings. Deviation requests DO NOT apply to hardware that is built and does not conform to the specification.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 29 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
9.5 Nonconformance reports
A nonconformance report provides a summary for products or procedures, which do not conform to the defined requirements. Nonconformance may be determined and reported by either the subcontractor or LBNL staff. LBNL will provide a standard nonconformance report form however; a subcontractor’s existing or internal document may be utilized with LBNL approval. Nonconformance reports are to be submitted to LBNL within 2 business days of the nonconformance identification.
Nonconformance reports apply to hardware that is built and does not conform to the specification(s). LBNL will provide a written disposition establishing a path forward for each nonconformance. No operations may be performed on the nonconforming item without LBNL’s written disposition or approval to proceed.
9.6 Numbering and/or Serialization
Each chamber must be serialized. The following indicate the methodology of serialization
Designation Serialization
AL-1476-9886
AL-1476-9886-0001
AL-1476-9886-0002
The serialization must be laser etched on the top of all chamber. See location of the serialization on the picture below (blue square).
Table 9-1: Location of the serialization on VC12-Diag ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 30 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Designation Serialization
AL-1453-8149
AL-1453-8149-0001
AL-1453-8149-0002
AL-1453-8149-0003
AL-1453-8149-0004
The serialization must be laser etched on the top of all chamber. See location of the serialization on the picture below (blue square).
Table 9-2: Location of the serialization on VC12-IR ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 31 of 35
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
9.7 Completed ACL
The subcontractor must provide a completed ACL to LBNL technical representative before shipping each chamber. The ACL shows that the following requirements are validated:
1. Visual Inspection
2. CMM measurement
3. Magnetic permeability
4. Bakeout / RGA scan
5. He leak test
6. HPN2 backfill
7. CMM after bakeout
8. Water Pressure Test
9. All Required Documentation
The ACL must include the criteria of the requirements and the results of the test related to the requirement. See doc AL-1704-8936.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
All officially released LBNL documents are watermarked and contain LBNL Document
10 APPLICABLE DOCUMENTS
This section identifies applicable documents that are considered to be a part of this document. All information contained in an applicable document must be valid to the full extent, unless specifically noted within this document. Applicable documents must be obtained from the LBNL Document Control Center (DCC).
Table 10-1: Applicable documents ID Document ID Title
1 AL-1704-8934 SR - VC12-IR & VC12-Diag - ESD 2 AL-1704-8936 SR - VC12-IR & VC12-Diag - ACL 3 AL-1220-7841 UHV_Chamber_&_Component_Production_Requirements 4 AL-1405-1295 Control plan template
5 AL-1453-8149 WLDMT, VC12 –IR, SR
6 AL-1476-9886 WLDMT, VC12 –Diag, SR 7 AL-1705-5717 Flange, Obround, Blank 8 AL-1698-2423 Flange, RF, Gen II QF50 9 AL-1709-7009 VC12-IR + all features
10 AL-1713-7011 VC12-Diag + all features ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
All officially released LBNL documents are watermarked and contain LBNL Document
APPENDIX A: CONTROL PLAN
Extract of the control plan to be completed by the subcontractor ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
All officially released LBNL documents are watermarked and contain LBNL Document
APPENDIX B: CAD MODEL AND DRAWING REQUIREMENTS
The following requirements are applicable to 2-d drawings and 3D CAD models supplied in support of the MRR
1. All dimensions are to be in millimeters.
2. Dimensioning scheme to adhere to ASME Y14.5 (2009 or later), “Dimensioning and Tolerancing”.
3. Unless otherwise specified, all features to be modeled at the mean.
4. Threads, both internal and external to be modeled as cosmetic, for external threads the solid geometry to be at the maximum minor diameter, for internal threads the solid geometry to be at the maximum minor diameter. Threads represented as helical features is forbidden.
5. A material must be specified and the properties of the material must be applied to the object, such that the weight/mass of the object is a property of the file/object.
The material file must include these properties, density, modulus of elasticity, Poisson’s ratio, Coefficient of Thermal Expansion and Thermal Conductivity. The units of these properties to be consistent with the units of the model, and in SI
Units (International System of Quantities).
6. All solid models must be “water tight”, meaning there cannot be “holes” or “gaps” in the solid surface such that the feature does not close upon itself.
7. Drawings and Models must use English as the language used to describe the dimensions, notes, descriptions, text and features.
8. A minimum note based tolerance scheme to use is, X ± 1, X.X ± 0.5, X.XX ± 0.15, Angles ± 0.5°. Alternate: Individual tolerance of each dimension, not making use of a note based scheme. The vendor may use a scheme which has tolerances that are smaller than the minimum.
9. ALS-U will supply the batch of serial numbers to be applied/consumed for items requiring serial numbers. ALS-U Serial Numbers must be used, vendor generated serial numbers are not allowed.
10. If an item is to be serialized ALS-U must approve of the marking method to be used for attaching the ALS-U supplied serial number to the object, and the process must be included in the drawing describing the object, possibly included in the notes of the drawing.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
AL-1704-8935 Rev. A Doc. Status: Released Page 35 of 35
All officially released LBNL documents are watermarked and contain LBNL Document
11. The 3-D CAD Model digital file must one that is consumable by PTC’s Creo
Parametric software. The preferred format is Creo Parametric (check with LBNL for current version). Consumable in this context means when imported into Creo
Parametric (check with LBNL for current version), the file is interpreted by Creo properly, there are no failures, and the integrated model can be regenerated successfully. If the vendor does not use Creo Parametric, then they must supply the software name and version, along with the file format they would supply to be used by LBNL.
12. The CAD Drawing digital file must one that is consumable by PTC’s Creo
Parametric software. The preferred format is Creo Parametric (check with LBNL for current version). Consumable in this context means when imported into Creo
Parametric (check with LBNL for current version), the file is interpreted by Creo properly, there are no failures, and the integrated model and drawing can be regenerated successfully.
13. The 3-D CAD Model and the Drawing files must be parametric. Parametric meaning that if any feature, dimension, attribute, data set is modified in one object, the other object automatically inherits the change upon regeneration.
14. Drawings should use driven dimensions inherited from the model. Creating dimensions which only exist in the drawing is not recommended and may be a cause for rejection of the drawing.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: A pr il th , 2
D C
C A ut h
K ey
: D J0
2R H
2D
File details come from the government source that posted it. Updated .