About this file

This document outlines technical specifications for an ammunition contract opportunity. It provides details on reporting shipment requirements, contact procedures, hazardous material classifications, testing and inspection requirements, material age limits, and critical safety item documentation. Key information includes five national stock numbers for ammunition items, lot acceptance test and failure analysis procedures, energetic material traceability and certification requirements, and application of DFARS clauses around ammunition and explosives safety.

View the file

Other files for this federal contract opportunity

Other files attached to F-15 SMDC, newest first.
File Type Posted
TransInstruction15.pdf PDF
F01-069-7777 SPI.pdf PDF
EDL_013339317.pdf PDF
EDL_010697776.pdf PDF
CADPAD Item Marking Instruction - Ver 1.5 - 20190501.pdf PDF
F010142406 SPI1.pdf PDF
QALI F-15 SMDC.pdf PDF
FD2020-20-50006 (USAF)_50007 (FMS)_CDRLS_updated.pdf PDF
REPSHIP 11 Mar 14.pdf PDF
EDL_010697777.pdf PDF
FA821320R3010.pdf PDF
Bid Sets 20-50007.pdf PDF
ADC SOW Jan 2018.pdf PDF
F01-333-9317 SPI.pdf PDF
F010174540 SPI2.pdf PDF
PHST-SOW w_Packaging.pdf PDF
F01-069-7776 SPI.pdf PDF
20-50006 Bid Sets.pdf PDF
ES7034 (Attachment 5).pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

(version 15 Jun, 2016)

FD2020-20-50006 (USAF) / 50007 (FMS)

NSN: 1377-01-333-9317ES

1377-01-069-7776ES

1377-01-069-7777ES

1377-01-017-4540ES

1377-01-014-2406ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of

Availability (NOA) including FMS case and requisition numbers by mail to:

AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or

Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): See Attached

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.3, 19

Apr 2016, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129.

7. Hazard Classification Information:

Hazard Class/Division: 1.4

Storage Compatibility Group: S

DOT Marking/Proper Shipping Name: EX*

DOT Class/Hazard Class: 1.4S

DOT Label/Shipping Label: Explosive 1.4S

UN Serial No.: 0349

UN Proper Shipping Name/UN No: Articles Explosive Nos (HNs) mailto:ooalc.gacp.transportation@us.af.mil

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. .

If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D)

NORs – CDRL (DI-SESS-80642D)

RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: __B_, Reason: ___Admin or Operational Use__(ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883, Method 1014.13 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.

Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval. The Lot

Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

11. Lot Acceptance Test Requirements are: IAW Latest Govt Approved Vendor ATP

12. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

13. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the

PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ

Organization E-mail: quinn.tidwell@us.af.mil

14. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)

15. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase

Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

16. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed _36__ months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121

(http://www.pmddtc.state.gov/regulations_laws/itar.html).

17. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed _36_ months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis

(when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components.

The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost;

therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA:

19. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment Clause ES7034)

20. Vendor shall submit a Bill of Materials (BOM) for Diminishing Manufacturing Sources and

Material Shortages (DMSMS) Management.

21. Item unique identification (IUID) marking is required. If required, marking shall be in accordance with MIL-STD-130 and DoD 5000-64.

22. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives http://www.pmddtc.state.gov/regulations_laws/itar.html

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and

Explosives

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

F15 Individual SMDC

Lines/Cord Sets

NSN P/N DODIC CAGE

01-333-9317 7829332-50 ZY78 06331/17610

01-069-7776 7829332-10 ZY36 06331/17610

01-069-7777 7829332-30 ZY37 06331/17610

01-017-4540 812503-301AH SN31 06331/17610

01-014-2406 812503-353AH SM65 06331/17610

This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. Other characteristics requiring inspection or special oversight from DCMA: SEE QALI

Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5).

(Engineer shall provide ATTACHMENT #5, Clause ES7034 to Item Manager)

Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance –

Ammunition and Explosives

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air

Shipments

Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment #5).

(Engineer shall provide ATTACHMENT #5, Clause ES7034 to Item Manager)