This is an Air Munition Specification document dated March 10, 2025, for contract FD2020-25-50041, identifying ammunition items by MNSN 1377001720428 and ANSNs 1377015608285 and 1377016605588. The Department of Defense Identification Code (DODIC) is MT82. The specification establishes comprehensive technical and administrative requirements for ammunition manufacturing, quality assurance, and delivery.

Key requirements include: contractors must provide advanced Report of Shipment (REPSHIP) notifications to consignees no later than 24 hours before arrival and within two hours of ammunition shipment departure; ammunition data cards must be completed per attachment specifications and accompany shipments; items must be marked per CAD/PAD Item Marking Instruction Version 1.6; shelf life code marking is not required. Energetic materials and components, including all explosives, propellants, pyrotechnics, cartridges, and initiators, cannot exceed 24 months from original manufacturing date and must be traceable to DoD-qualified manufacturers and ITAR-compliant (parts 120 and 121). Raw ingredients in blended materials have the same 24-month requirement. Percussion primers require sensitivity and dud testing certification/recertification within 24 months (or 2 years if Navy certified) and must be stored in temperature and humidity-controlled sealed containers with desiccant. The item is designated as a Critical Safety Item (CSI) with government engineer approval authority retained for Material Review Board decisions. Lot Acceptance Test Plans must be submitted 90 days before testing with 30-day approval allowance; contractors may pre-select up to 30 percent of production lot test samples with minor cosmetic defects. All rework and repair of nonconforming material requires EBH procurement engineering authority approval. Contractors must provide Obsolescence Alert Notices and Diminishing Manufacturing Sources and Material Shortages (DMSMS) Health Assessment Reports as contractual deliverables.

View the file

Other files

File Type Posted
F01-419-8796_SPI.pdf PDF
ADC_SOW_Jan2018.pdf PDF
Section_L_CADPAD.pdf PDF
REPSHIP.pdf PDF
Item_Description_5588ES.pdf PDF
Item_Description_8285ES.pdf PDF
AD_P_1377_17_SPI.pdf PDF
5588ES_EDL.pdf PDF
8258ES_EDL.pdf PDF
Item_Description_0428ES.pdf PDF
0428ES_EDL.pdf PDF
ItemMarkingInstruction.pdf PDF
PackagingSOW.pdf PDF
Statement_of_Objectives_SOO.pdf PDF
Section_M_CADPAD.pdf PDF
FA821326R3016.pdf PDF
CDRLs.pdf PDF
JFQR.pdf PDF
AD_P_1377_5_SPI.pdf PDF
ES7034.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

(Version 6 Feb 2024)

AIRMUNITION SPECIFICATION

DATE: 10 MAR 2025

FD2020-25-50041

MNSN: 1377001720428

ANSN: 1377015608285, 1377016605588

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to:

AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): MT82

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, dated 6 March 2023, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129R (C3).

7. Hazard Classification Information: See JHCS 50041 Attachment Hazard Class/Division:

Compatibility Group:

DOT Marking/EX Number:

DOT Shipping Labels:

UN Number:

Proper Shipping Name:

Net Explosive Weight per item (NEW):

NEW Unit of Measurement:

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC.

If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be mailto:ooalc.gacp.transportation@us.af.mil submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E) NORs – CDRL (DI-SESS-80642E) RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: B, Reason: Controlled Technical Information (ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883L, Method 1014.18 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.

Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are: Contractor in accordance with latest government-approved ATP

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization:

Organization E-mail: matthew.tanner.7@us.af.mil

13. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

17. Percussion primers shall have been certified /recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2-year certification. Primers shall be stored in a temperature and humidity-controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.

MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: SECTION E – PRODUCTION LOT

TEST

19. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture.

The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.

20. Any Rework or repair on nonconforming material, beyond approved operation procedures and/ or after product has been submitted to the government shall be approved by EBH procurement http://www.pmddtc.state.gov/regulations_laws/itar.html engineering authority prior to rework and repair of the nonconforming material. (See Attachment #5, ES7034).

21. Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists. CDRL (DI-MGMT-81941)

22. Contractor shall provide Diminishing Manufacturing Sources and Material Shortages (DMSMSHealth Assessment Report to support DMSMS management activities as a part of the Department of Defense (DoD) Total System Life Cycle Management responsibilities. CDRL

(DI-MGMT-82273)