About this file

This document outlines technical requirements for a federal contract solicitation for BBU-36A/B Impulse Cartridges. Key requirements include providing REPSHIP reports within specified timeframes, coordinating transportation with DCMA, using specified DODIC and lot numbering standards, submitting ammunition data cards and test plans, complying with materials aging and traceability standards, and conducting testing and inspections in accordance with various military standards. The solicitation also requires adherence to quality, program management, and safety standards, and outlines submission of documentation such as quality plans, test reports, and progress updates. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is listed as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to BBU-36A/B Impulse Cartridges, newest first.
File Type Posted
Section_M_BBU3615July21.pdf PDF
FA821321R3029_______0004.pdf PDF
FA821321R3029_______0003.pdf PDF
016406470-EDL-BBU-36.pdf PDF
FA821321R3029_______0002.pdf PDF
FA821321R3029_______0001.pdf PDF
SPI-2169-F01-640-6470.pdf PDF
FORM158-FD2020-20-50194.pdf PDF
PPI_Form.pdf PDF
LRFOP_Worksheet_Example.pdf PDF
Quantity_Bands_BBU36.pdf PDF
ES7035_Description_Sheets.pdf PDF
1653-F2DCAE0233A101-FD2020-20-50194-8-24-20.pdf PDF
EDL-BBU-36.pdf PDF
Section_L_BBU369jun21.pdf PDF
F_O_O_P_BBU36.pdf PDF
JQR-BBU-36May2019signed.pdf PDF
20-50194__Data_Package_Bid_Sets.pdf PDF
CDRL-1423-FD2020-20-50194-BBU-36Rev060721.pdf PDF
Section_M_BBU369Jun21.pdf PDF
SOW-SPI.pdf PDF
REPSHIP.pdf PDF
Example_LRFOP_BBU36.pdf PDF
ES7034_Rework_Repair_Clause_Jan_2012.pdf PDF
CDRLExhibitList.pdf PDF
FA821321R3029.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-20-50194

NSN: 1377-01-640-6470

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): MG11

4. One copy of all shipping documents shall be furnished to 429 SCMS/GUMAB, by mail to: 6038

Aspen Ave, hill AFB, Utah 84056-5805 or F requisition number. MIPR number and line item.

Fax to: (801)777-5545, or Email: hill.outgoing.mipr@us.af.mil and shall identify requisition number, MIPR number line item.

5. All SF 1080 billings shall show complete fund citation, MIPR and line item number.

6. Ammunition lot numbering shall be accomplished. Reference MIL-STD-1168C for guidance.

Each energetic ingredient and component used in production lot(s) shall be from a single material lot.

7. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

8. Items shall be marked using accepted practices for marking (reference MIL-STD-130N for guidance). Minimum item marking shall include Government/Manufacturer Part Number, Lot Number (reference MIL-STD-1168C), and Serial Number if applicable.

9. Shelf Life Code marking NOT required per MIL-STD-129R.

10. Physical Security of Arms, Ammunition & Explosive (AA&E) items shall be safeguarded as sensitive in accordance with DoDM 5100.76, April 17, 2012 28 February 2014, DFARS 252.223- 7007 and the following sensitivity/category code:

(If Yes, select one of the following) (If GFM is used, select SRC applicable to GFM) mailto:ooalc.gacp.transportation@us.af.mil mailto:hill.outgoing.mipr@us.af.mil

Ammunition and Explosives SRC IV Ammunition and Explosives SRC IV

11. Hazard Classification Information:

Hazard Class/Division: 1.4 Compatibility Group: S DOT Marking/EX Number:

DOT Shipping Lables: EXPLOSIVES 1.4S UN Number.: UN0454 Proper Shipping Name: IGNITERS Net Explosive Weight per item (NEW): 0.00191 NEW Unit of Measurement: pounds NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

12. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For

Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.

Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E) NORs – CDRL (DI-SESS-80642E) RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: D, Reason: Critical Technology (ref. DoD 5230.24)

13. The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval. The Lot Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

14. Lot Acceptance Test Requirements are: PER ITEM SPECIFICATION USAF

15. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s):

WAWF/WARP

CDRL: (DI-NDTI-80809B)

16. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHCC Organization E-mail: MATTHEW.ADAMS.48.CTR@us.af.mil

17. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

18. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

19. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.

Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

20. The contractor shall comply with MIL-STD-1171/B for propellants, explosives and /or chemical materials used in the end item(s) or component(s) on this contract. Acceptance and description sheets shall be submitted in WARP (see Attachment ES7035). CDRL (DI-MGMT-81978)

21. A detailed end item component listing for Ammo Data Card reporting is required (See

Attachment ES6200)

22. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment ES7034)

23. DoD Preferred Methods for Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. (See Attachment ES7650) If MIL-STD-1916 is utilized it is mandatory to have contractor provide a QAPP CDRL as the vehicle to submit alternate acceptance methods (e.g. process control and statistical control methods).

http://www.pmddtc.state.gov/regulations_laws/itar.html

24. First Article Test/Inspection Report IAW AFMC form 260 CDRL (DI-NDTI-80603A)

FAT-Contractor Test

25. First Article Test Plan and Procedures CDRL (DI-NDTI-81307A)

26. The contractor shall provide a Quality Assurance Program Plan (QAPP) which meets the requirements of ISO 9001:2015. The QAPP shall include a corrective action and disposition system for nonconforming material. The contractor QA requirements shall flow down to all tiers of subcontracts and assure subcontractor/vendor supplies conform to the requirements of this contract. The contractor’s quality program shall focus on the prevention and detection of discrepancies to assure delivered products satisfy the life cycle and performance requirements.

This deliverable will be a living document and therefore revisions may be periodically required and resubmitted for approval. Upon request, the contractor shall supply quality manuals, operating procedures, or work instructions as referenced in the QAPP or as referenced in the contractor’s ISO 9001:2015 Quality Management System. CDRL (DI-QCIC-81794)

27. The Contractor shall prepare a MSA Package, consisting of the Assessment Plan, associated data, and analysis, to the government for review and approval. CDRL (DI-QCIC-81960)

28. The Contractor shall submit a MSA package, consisting of the Assessment plan, associated data, and analysis, to the Government for review and approval CDRL (DI-QCIC-81960)

29. The Contractor shall submit a Critical Characteristics Control Plan (Required if MSE is used for procurement). CDRL (DI-MGMT-80004A)

30. The Contractor may voluntarily submit Critical Plans of Action (Required if MSE is used for procurement). CDRL (DI-MGMT-80004A)

31. The contractor shall host a post award meeting at the contractor’s facility no later than 30 days after contract award and provide minutes of the meeting. CDRL (DI-ADMN-81505) PM email lauren.buckner@us.af.mil

32. Contractor shall plan and provide a Conference Agenda for all Program Reviews (PRs)/Technical

Reviews (TRs) at their facilities and/or subcontractors facilities.

CDRL (DI-ADMN-81249B) PM Email: lauren.buckner@us.af.mil

33. Contractor shall prepare and deliver conference minutes for all PRs and TRs.

CDRL (DI-ADMN-81505) PM Email: lauren.buckner@us.af.mil

34. Contractor shall prepare and submit monthly progress reports documenting program status of milestones, schedule, cost objectives, and technical performance requirements. CDRL (DI- MGMT-80227) PM email lauren.buckner@us.af.mil

35. Contracts involving ammunition and explosives (AE) will contain:

mailto:lauren.buckner@us.af.mil mailto:lauren.buckner@us.af.mil

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

36. Procurement data package will be provided by the USAF.