AHEC-25700-R On-Call Construction_Service Provider_Revised 3-29-24.pdf
PDF 489 KB Posted
- Solicitation number
- AHEC-25700-R
- Issued by
- Denver County, Denver City, Colorado
About this file
This document is a Request for Proposal (RFP) AHEC-25700-R issued by the Auraria Higher Education Center (AHEC) for On-Call Contractor/Service Provider Small Construction Pre-Qualification. The RFP seeks to establish a pre-qualified list of contractors to perform various trade services for on-call/as-needed projects across the Auraria Campus, which includes the Community College of Denver, Metropolitan State University of Denver, and University of Colorado-Denver. Projects will range from $50,000 up to $500,000, with contractors required to perform services in multiple trades including General Contractor (Large, Small, and Historical Restoration), Plumbing, Electrical, Mechanical/HVAC, Asbestos Abatement, and several other specialized trades. The contract term will be one fiscal year from July 1, 2024 through June 30, 2025, with the proposal due date of April 15, 2024 at 10:00 AM Mountain Time.
AHEC plans to create an On-Call Small Construction Pre-qualification Short List containing up to six contractors for Large Projects, four for Small Projects, four for Historical Restoration, and six contractors for other trades. The solicitation allows current contractors to submit either a new proposal (which will forfeit their existing score) or a renewal proposal to maintain their current ranking. Contractors must provide comprehensive documentation including business information, project references, personnel qualifications, trade-specific credentials, insurance certificates, and experience modification rates. The evaluation will be numeric, with awards made to offerors whose proposals are most advantageous to AHEC, considering factors such as business information, references, personnel, trade capabilities, and past performance. In the event of a tie, AHEC will use a coin flip or similar method to determine the awarded vendor.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AURARIA HIGHER EDUCATION CENTER
REQUEST FOR PROPOSAL (RFP) COVER SHEET
Date:
March 5, 2024 (Revised 3/29/24) RFP Number: AHEC-25700-R
Return all Sealed Proposals to:
Auraria Higher Education Center – See section 1.14 for delivery instructions
Purchasing Agent: Bryan McClure
RFP Due Date: April 15, 2024 RFP Opening Time: 10:00AM (Mountain)
On-Call Contractor / Service Provider – Small Construction – Pre-Qualification for Auraria Higher Education Center
Per the attached specifications, terms and conditions
F.E.I.N.: Terms:
(Minimum of Net 45) Delivery Date:
Signature:
Typed/Printed Name:
Title:
Company Name:
Address:
City: State: Zip:
Phone Number: Fax Number:
IMPORTANT: The following information must be on the outside of the RFP Return Envelope:
RFP Number – Opening Date and Time
Is this a NEW PROPOSAL _________ or RENEWAL PROPOSAL____________
Offerors are urged to read the RFP thoroughly before submitting a proposal. Offerors are required to submit Federal employer Identification Number (FEIN).
This sheet must be completed, signed, and submitted with proposal.
AHEC-25700-R
TABLE OF CONTENTS
SECTIONS PAGE
Table of Contents
SECTION 1: ADMINISTRATIVE INFORMATION
SECTION 2: SCOPE OF SERVICES
SECTION 3: PROPOSAL SUBMITTAL FORMAT
SECTION 4: EVALUATION
ATTACHMENTS
Attachment A: Insurance Requirements
Attachment B: Sample Certificate of Insurance
Attachment C: W-9
Attachment D: Personnel Rate Sheet
Attachment E: Restoration & Repair Rate Sheet
Attachment F: FY24 On-Call List with Scores
Attachment G: The Contractor’s Handbook: Working Successfully at The Auraria Higher Education Center
SECTION 1: ADMINISTRATIVE INFORMATION
1.1.1
1.1 ColoradoVSS and BidNet Registration
The State of Colorado uses a financial management system called the Colorado Operations Resource Engine (CORE). All solicitations issued by the Auraria Higher Education Center (AHEC) either on its behalf, or on behalf of the Institutions we serve, will be posted on the following websites:
ColoradoVSS: https://codpa-vss.cloud.cgifederal.com/webapp/PRDVSS2X1/AltSelfService and the Rocky Mountain E-Purchasing System (aka BidNet): https://www.bidnetdirect.com/colorado.
Solicitation details for goods and services, as well as construction notices on ColoradoVSS and BidNet are public. There is no cost to register and it’s not required for ColoradoVSS; however, registration for BidNet is required and there is no cost unless the “push” notification option is selected. During the solicitation process, all official communication with vendors will be via notices on ColoradoVSS and BidNet. Notices may include any modifications to administrative or performance requirements, answer to inquires received, clarifications to requirements, and the announcement of the apparent winning vendor. It is incumbent upon vendors to carefully and regularly monitor ColoradoVSS or BidNet for any such notices.
If you have not registered and would like to become a registered supplier on ColoradoVSS: click here or BidNet: click here.
1.2 Official Means of Communication
During the solicitation process for this RFP, all official communication between AHEC’s Procurement Office and offerors will be via postings on the ColoradoVSS and BidNet. AHEC will post notices that will include, but not be limited to, modifications to administrative or performance requirements, answers to inquiries received, clarifications to requirements, and the announcement of the apparent winning offeror.
It is incumbent upon offerors to carefully and regularly monitor ColoradoVSS or BidNet for any such notices.
1.3 State of Colorado Solicitation Instructions/Terms and Conditions
Any proposal submitted in response to this RFP is subject to the State of Colorado Solicitation Instructions/Terms and Conditions found on ColoradoVSS and BidNet.
1.4 Purpose of the RFP
Auraria Higher Education Center (AHEC) intends to select a list of pre-qualified Contractors/Service Providers to perform various trade services for on-call/as-needed projects throughout the entire Auraria Higher Education Center Campus, which also includes the Community College of Denver (CCD), Metropolitan State University of Denver (MSU Denver), and University of Colorado-Denver (UCD), from $50,000 up to $500,000.00. Each project shall adhere to the procurement rules and shall include bonding requirements as deemed necessary.
AHEC reserves the right to add or remove Contractors/Service Providers; refer to Section 2: Scope of Services for more details.
https://codpa-vss.cloud.cgifederal.com/webapp/PRDVSS2X1/AltSelfService https://www.bidnetdirect.com/colorado http://www.colorado.gov/vss https://www.bidnetdirect.com/colorado
1.5 Term of the Contracts
The term of the contracts resulting from this RFP publication will be for a period of one (1) fiscal year commencing upon July 1, 2024 through June 30, 2025. It is agreed that all work in progress or work awarded on or before June 30 of each fiscal year shall continue to completion.
AHEC reserves the right to cancel these contracts at any time without cause, upon written notice given thirty (30) days in advance. AHEC will give written documentation to the contractor as to the reason for cancellation. Authorized services performed shall be paid for through the cancellation date.
1.6 Number of Awards
AHEC intends to award multiple contracts as a result of this RFP, depending on offerors' qualifications and abilities to perform the various services identified in the RFP.
1.7 RFP Cancellation
AHEC reserves the right to cancel this entire Request for Proposal, at any time, without penalty.
1.8 Document Information
This document, including attachments, constitutes a formal Request for Proposal (RFP) and is a competitive procurement; therefore, the offeror must carefully follow the instructions herein in order to be considered fully responsive to the RFP. AHEC reserves the right to reject a proposal that is determined to be incomplete, or which does not follow the required structure and format; however, when such statements are innocent or inadvertent in the opinion of AHEC, AHEC further reserves the right to either request clarifications or waive them as informalities.
1.9 Issuing Office
This RFP is issued by the AHEC Procurement Office. The AHEC Procurement Office is the sole point of contact concerning this RFP. The AHEC Procurement Office is the procurement authority for this solicitation and as such issues that may arise herein.
The remainder of this page intentionally left blank.
1.10 Schedule Of Activities
Listed below are specific and estimated dates and times of actions related to this RFP. The actions with specific dates must be completed as indicated unless otherwise changed by AHEC. In the event that AHEC finds it necessary to change any of the specific dates and times in the calendar of events listed below, it will do so by issuing a modification to this RFP on ColoradoVSS and BidNet. There may or may not be a formal notification issued for changes in the estimated dates and times.
Activity Date and Time (Mountain Time) Request for Proposal Notice Published on ColoradoVSS and BidNet March 5, 2024
OPTIONAL Pre-Proposal Meeting via Zoom March 15, 2024 at 9:00AM
Written Inquiry Deadline March 22, 2024 at 2:00PM
Modification Issued with Answers to Written Inquiries (if necessary) March 29, 2024 (Estimated)
Proposal Submission Deadline April 15, 2024 at 10:00AM Notice of Awards April 30, 2024 (Estimated)
Agreement Start 7/1/2024
Agreement Term One (1) fiscal year; commencing on July 1, 2024 through June 30, 2025.
1.11 OPTIONAL Pre-Proposal Meeting (Zoom)
To ensure sufficient information is available to Offerors preparing responses, an optional pre-proposal meeting has been scheduled (see date and time listed in the Schedule of Activities). The intent of this meeting is to have AHEC staff available to discuss the procurement process and provide a briefing of the services to be performed. The pre-proposal meeting will be a Zoom meeting:
Join Zoom Meeting
LINK
https://us06web.zoom.us/j/89821124016?pwd=nqN8yXnvBExWbcM0d9fG02ZY4nW4eI.1
Meeting ID: 898 2112 4016 Passcode: 966604
*Interpretation services* If you require or would like the Pre-Proposal Meeting to be available in your native language, please contact Bryan McClure by email: bryan.mcclure@AHEC.edu least 3 days before the session and please specify your native language so we can make arrangements for language interpretation.
Offerors should allow one (1) hour for the meeting. Any substantial clarifications resulting from the meeting will be posted on ColoradoVSS and BidNet.
https://us06web.zoom.us/j/89821124016?pwd=nqN8yXnvBExWbcM0d9fG02ZY4nW4eI.1 mailto:bryan.mcclure@AHEC.edu
1.12 Written Inquiries
Offerors may make written inquiries concerning this RFP to obtain clarification of requirements. No inquiries will be accepted after the date and time indicated in the Schedule of Activities. The AHEC Procurement Office prefers that all inquiries be sent by e-mail to:
Procurement Office, Auraria Higher Education Center
E-mail: bryan.mcclure@ahec.edu
RFP # AHEC-2700-R
Address written inquiries to: Bryan McClure
Response to offerors inquiries (if required) will be published as a modification on ColoradoVSS and in a timely manner. The only official responses to an offeror’s inquiries are those responses that are published as a modification on ColoradoVSS and BidNet. Offerors should not rely on any other statements, either written or oral, that alter any specification or other term or condition of this RFP.
Offerors are responsible for monitoring ColoradoVSS and BidNet for publication of modifications to this solicitation.
1.13 Modifications or Withdrawals of Proposals
Proposals may be modified or withdrawn by the offeror prior to the established due date and time.
1.14 Proposal Submission – Electronic Delivery Preferred
Proposals must be received on or before the date and time indicated in the Schedule of Activities. Late proposals will not be accepted. It is the responsibility of the offeror to ensure that AHEC receives the proposal on or before the proposal opening date and time, regardless of the delivery method used.
Offerors shall allow sufficient delivery time to ensure receipt of their proposals by the time specified. Only one delivery type (mail or electronic) is required.
It is preferred that proposals are submitted electronically through BidNet. The electronic proposal submission should be saved as one (1) PDF document with the file name consisting of the following information: Company Name, Trade, and the type of proposal (New or Renewal) (example: ABC Company_General Contractor_Renewal).
If submitting for one trade or multiple trades, only one (1) electronic BidNet submission is required. If submitting for multiple trades, the Contractor/Service Provider must include within their BidNet submission separate electronic file(s) with the proposals for each trade and include all required documentation for the specific trade. AHEC will not incorporate any missing information or combine files from one proposal to another. Failure to meet this requirement may result in disqualification of proposal.
For proposals submitted by mail or delivery service, offerors must submit one (1) hardcopy marked “original” and one (1) electronic copy via USB flash drive. The electronic copy must be a complete and exact copy of the hardcopy submittal and should be saved as one (1) PDF document with the file name consisting of the following information: Company Name, Trade, and the type of proposal (New or Renewal) (example: ABC Company_General Contractor_Renewal). If submitting for more than one trade, proposals can be combined in one package, but each trade must have a proposal (hard copy and electronic copy) that includes all required documentation for the specific trade. AHEC mailto:bryan.mcclure@ahec.edu will not incorporate any missing information or combine files from one proposal to another.
Failure to meet this requirement may result in disqualification of proposal.
The Request for Proposal cover page MUST be signed by the offeror or an officer of the offeror legally authorized to bind the offeror to the proposal. The signed RFP cover page must be included with each proposal copy that is marked ORIGINAL. Proposals which are determined to be at variance with this requirement may not be accepted.
Mail or Delivery Service If sending via mail or delivery service, the proposal package shall be delivered or sent to:
Auraria Higher Education Center Procurement Office
Attn: Bryan McClure (please call 303-880-9902 for access to building for delivery)
RFP # AHEC-25700-R
Mailing Address (US Mail): Campus Box K, P.O. Box 173361, Denver, CO 80217-3361
Delivery Service (e.g., FEDEX): 1201 5th Street, Suite 370, Denver, CO 80204
Proposals must be submitted and sealed in a package. The outer envelope of the package must show the following information:
OFFEROR’S NAME
ATTN: Bryan McClure
RFP NUMBER
PROPOSAL DUE DATE AND TIME
1.15 Alterations in Proposals
Proposals made in pencil shall be rejected. Alterations in cost figures shall be rejected unless initialed in ink by the person responsible for, or authorized to make decisions as to the cost specified. Proof of authorization shall be provided upon request. The use of “white out” is considered an alteration.
1.16 Addendum or Supplements to Request for Proposal
In the event that it becomes necessary to revise any part of this RFP, a modification notice will be sent via ColoradoVSS and BidNet.
1.17 Acceptance of RFP Terms
A proposal submitted in response to this RFP shall constitute a binding offer. The autographic signature of the offeror or an officer of the offeror legally authorized to execute contractual obligations shall indicate acknowledgment of this condition. A submission in response to this RFP acknowledges acceptance by the offeror of all terms and conditions including compensation, as set forth herein. Offeror shall identify clearly and thoroughly any variations between its proposal and the AHEC's RFP. Failure to do so shall be deemed a waiver of any rights of the offeror to subsequently modify the terms of performance, except as outlined or specified in the RFP.
1.18 Confirmation of Submission
Offerors may send an e-mail message to the Purchasing Agent of record indicating that the proposal has been sent and requesting confirmation by return e-mail upon AHEC’s receipt of proposal. If offeror requires confirmation, it is the offeror's responsibility to confirm in this way receipt of the proposal in advance of the posted deadline.
1.19 Protested Solicitations and Awards
Any actual or prospective offeror or contractor who is aggrieved in connection with the solicitation or award of a contract may protest to AHEC’s Director of Procurement and Distribution Services. The protest must be submitted in writing within seven (7) working days after such aggrieved person knows, or should have known, of the facts giving rise thereto.
With regard to the emphasized language above, it is important for bidders to note that a challenge to the solicitation’s requirements, or specifications, must be made within seven (7) working days of when the protest item is known.
Announcement of the Notice of Intent to Award will be made via a posting on ColoradoVSS and BidNet.
The requirement for timely submission of any protest (7 working days) will begin on the first working day following posting of the award notice on ColoradoVSS and BidNet.
1.20 Confidential/Proprietary Information
Any restrictions of the use or inspection of material contained within the proposal shall be clearly stated in the proposal itself. Written requests for confidentiality shall be submitted by the offeror with the proposal. The offeror must state specifically which elements of the proposal are to be considered confidential/proprietary.
Confidential/proprietary information must be readily identified, marked and separately packaged from the rest of the proposal. Co-mingling of confidential/proprietary and other information is NOT acceptable. Neither a proposal, in its entirety, nor proposal cost information, will be considered confidential and proprietary. Any information that will be included in any resulting contract cannot be considered confidential.
AHEC will make a written determination as to the apparent validity of any written request for confidentiality. In the event AHEC does not concur with the offeror's request for confidentiality, the written determination will be sent to the offeror. Ref. Section 24-72-201 et. Seq., C.R.S., as amended, Public (open) Records.
1.21 RFP Response Material Ownership
AHEC has the right to retain the original proposal response and other proposal response materials for its files. As such, AHEC may retain or dispose of all copies as is lawfully deemed appropriate. Proposal response materials may be reviewed by any person after the "Notice of Intent to Make an Award" has been posted on ColoradoVSS and BidNet, subject to the terms of Section 24-72-201 et seq., C.R.S., as amended, Public (Open) Records. AHEC has the right to use any or all information/material presented in reply to the RFP, subject to limitations outlined in the paragraph, Confidential/Proprietary Information (above). Offerors expressly agree that AHEC may use the materials for all lawful State purposes, including the right to reproduce and distribute copies of the material submitted for purposes of evaluation, and as part of the resulting contract, and to make the information available to the public in accordance with the provisions of the Colorado Open Records Act.
1.22 Selection of Proposal Notice
An Evaluation Committee will review and evaluate offers submitted and make a recommendation for award. This selection will be for award to the responsible offeror(s) whose proposal(s) are determined to be most advantageous to AHEC.
1.23 Notice of Intent to Award
AHEC reserves the right to make an award on receipt of initial proposals, so offerors are encouraged to submit their most favorable proposal at the time established for receipt of proposals. Offerors not meeting the requirements identified in the RFP shall be ineligible for further consideration. AHEC may conduct discussions with offerors in the competitive range for the purpose of promoting understanding of AHEC’s requirements and the offeror’s proposal, to clarify requirements, make adjustments in services to be performed, and in prices. Changes to proposals, if permitted, will be requested in writing from offerors.
1.24 Award of Contract
Award(s) will be made to the responsible offeror(s) whose proposal(s) will be the most advantageous to AHEC. In the event the parties are unable to enter into a contract, AHEC may elect to cancel the "Notice of Intent to Make an Award" and make the award to the responsible offeror whose proposal would subsequently have received the award.
1.25 Acceptance of Proposal Content
The contents of the proposal (including persons specified to work for AHEC) of the successful Offeror will become contractual obligations if acquisition action ensues. Failure of the successful Offeror to accept these obligations in a state contract, purchase order, or similar authorized acquisition document may result in cancellation of the award and such Offeror may be removed from future solicitations.
1.26 Ownership of Contract Products/Services
Proposals, upon established opening time, become the property of AHEC. All products/services produced in response to the contract resulting from this RFP will be the sole property of AHEC, unless otherwise noted in the RFP. The contents of the successful Offeror's proposal will become contractual obligations.
1.27 Incurring Costs
AHEC is not liable for ANY cost incurred by offerors prior to issuance of a legally executed contract, purchase order, or other authorized acquisition document. No property interest, of any nature, shall occur until a contract is awarded and signed by all required parties. All costs incurred in the response to the RFP are the sole responsibility of the offeror.
1.28 Non-Discrimination
Offerors shall comply with all applicable state and federal laws, rules and regulations involving non-discrimination on the basis of race, color, religion, national origin, age or sex.
1.29 Rejection of Proposals
AHEC reserves the right to reject any and all proposals, waive informalities and minor irregularities in proposals received as determined by AHEC, and to accept any portion of a proposal or all items proposed if deemed in the best interest of AHEC. Failure of an offeror to provide any information requested in this RFP (and in the manner or format required) may result in disqualification of the proposal.
1.30 Parent Company
If an offeror is owned or controlled by a parent company, the name, main office address and parent company's tax identification number shall be provided in the proposal. The tax identification number of the offeror responding to the RFP must be provided. The offeror must be a legal entity with the legal right to contract.
1.31 Prime Contractor
AHEC will consider the selected offeror to be the sole point of contact with regard to contractual matters including the performance of services and the payment of any and all charges. There may be areas for use of subcontractors or partners in this project. AHEC encourages use of small businesses wherever viable. If you are using subcontractors/partners, your proposal must list the subcontractors/partners, their area(s) of expertise, and include all other applicable information herein requested for each subcontractor/partner.
1.32 Taxes
AHEC, as purchaser, is exempt for all federal excise taxes under Chapter 32 of the Internal Revenue Code and from all state and local government use taxes (ref. Colorado Revised Statutes Chapter 39-26- 114(a)). Seller is hereby notified that when materials are purchased in certain political sub-divisions (for example – City of Denver) the seller may be required to pay sales tax even though the ultimate product or service is provided to the State of Colorado. This sales tax will not be reimbursed by AHEC.
1.33 Assignment and Delegation
Except for assignment of antitrust claims, neither party to any resulting contract may assign or delegate any portion of the agreement without the prior written consent of the other party.
1.34 Legislative Changes
AHEC reserves the right to amend any resulting contract in response to legislative changes, which affect the services related to this RFP.
1.35 Order of Precedence
In the event of any conflict or inconsistency between terms of this Request for Proposal and the proposal (offer), such conflict or inconsistency shall be resolved first, by giving effect to the terms and conditions of the resulting contract, second to the Request for Proposal, and third, to the proposal.
1.36 Venue
The parties agree that venue for any action related to performance of this contract shall be in the City and County of Denver, Colorado.
1.37 Contract Cancellation
AHEC reserves the right to cancel for cause, any contracts resulting from this RFP, by providing timely written notice to the Contractor/Service Provider.
1.38 Insurance
Awarded Contractors/Service Providers shall procure, at their own expense, and maintain for the duration of the term, the insurance coverage as described in the attached Insurance Requirements (Attachment A).
1.39 Past Performance
Each offeror’s past performance will be reviewed as part of AHEC’s overall evaluation. This evaluation will take into account past performance information submitted as a part of such offeror’s proposal including, but not limited to, information regarding predecessor companies, key personnel who have relevant experience, and subcontractors performing major or critical aspects of the service(s), if such information is relevant. Offerors without a record of relevant past performance or for whom information on past performance is not available will receive a neutral past performance rating. AHEC will consider offeror’s performance on past or current AHEC contracts with requirements similar to AHEC requirements for this contract. AHEC will consider information provided by offeror regarding any problems encountered on the identified contracts and any associated corrective actions.
1.40 Key Personnel
AHEC shall consider Contractor “Key Personnel” and therefore essential to the work being performed.
Contractor shall immediately notify AHEC in writing prior to replacing “Key Personnel”. Replacement personnel must have the same skill level and qualifications, or better, than the personnel they are replacing. AHEC must approve the replacement personnel in writing prior to new personnel commencing work and the change must not delay the project. AHEC’s approval of replacement Key Personnel shall not be delayed nor unreasonably withheld. Contractor shall take commercially reasonable action to transfer their “departing” personnel’s project knowledge to the Contractor’s substitute personnel to ensure continuity of services performed.
1.41 References
AHEC may contact the references provided by an offeror (primary sources) to validate the offeror’s experience. Other individuals and entities, (secondary sources) identified as possessing relevant information during the course of discussions with the references provided by an offeror, also may be contacted by AHEC. AHEC reserves the right to consider representations by these individuals or entities (secondary sources) concerning project scope, timeliness of performance, project management capabilities, and other information relevant to determining the quality of an offeror’s past experience and demonstrated capabilities.
1.42 Conflicts of Interest
Offeror avers that to his/her knowledge, no AHEC employee has any personal or beneficial interest whatsoever in the service or property described herein. See CRS §24-18-201 and CRS §24-50-507.
The signatory hereto avers that he/she is familiar with CRS §18-8-301, et seq. (Bribery and Corrupt Influence) and CRS §18-8-401, et seq. (Abuse of Public Office) as amended, and that no violation of such provisions is present.
SECTION 2: SCOPE OF SERVICES
2.1 General Information
AHEC’s Facilities Management is requesting proposals from Contractors/Service Providers to pre-qualify for the On-Call Small Construction Project Program. Under the Small Construction Program, selected Contractors/Service Providers will provide general contracting and maintenance services for the following trades: GENERAL CONTRACTOR - LARGE PROJECTS, GENERAL CONTRACTOR -SMALL -
PROJECTS, GENERAL CONTRACTOR - HISTORICAL RESTORATION –, RESTORATION & REPAIR,
PLUMBING, ELECTRICAL (MEDIUM VOLTAGE), ELECTRICAL (BUILDING), MECHANICAL/HVAC,
ASBESTOS ABATEMENT, WELDING, CONCRETE, CASE WORK, PAINTING, MOVING, ROOFING,
CAMPUS SIGNAGE, FIRE ALARM, FIRE SUPPRESSION, SECURITY CAMERA, SECURITY
SYSTEM, ACCESS CONTROL, AUTOMATIC DOOR OPERATOR/ACCESS TECHNOLOGY,
FLOORING, and WINDOW & GLASS.
An On-Call Small Construction - Pre-qualification Short List will be created and it will contain up to six (6) General Contractors – Large Projects, up to four (4) General Contractor – Small Projects, up to four (4) General Contractor - Historical Restoration contractors and up to six (6) Contractors/Service Providers for all other trades. AHEC Procurement Services, at its sole discretion, shall determine the final actual number of Contractors/Service Providers for the On-Call Small Construction - Pre-qualification List.
Notation of new Contractor/Service Providers: General Contractor - Small Projects and General Contractor – Historical Restoration. This year AHEC is going to break up the General Contractor (GC) category into three (3) distinct categories: (1) small projects, which are approximately $30,000 - $50,000 in total costs that require minimal coordination and are short in duration; (2) larger projects that require a fully-loaded team including a Project Manager, Superintendent and multiple subcontractor trades; and (3) General Contractor - Historical Restoration.
AHEC often has small projects that require only one or two subcontractors and are not financially feasible for larger GCs because they don’t require a fully loaded team, so we are creating a new General Contractor - Small Project category for the smaller projects.
AHEC also has homes that are listed on the National Historical registry that require special handling, so we are creating a new category for this year called, General Contractor - Historical Restoration, which will involve properly repairing historical, mostly exterior aspects, of historic residences and other small historic buildings on campus, including things like repairing porches and wood elements.
GCs may submit for all three categories, but need to understand the costs for the smaller projects will need to be streamlined.
All proposals submitted for the General Contractor - Small Projects and General Contractor - Historical Restoration categories are required to submit a NEW PROPOSAL.
Proposals submitted for the General Contractor - Large Projects may submit a Renewal Proposal, if applicable and desired and per the paragraph directly below.
Current On-Call Contractors/Service Providers will have the option to submit a new (proposal scored) or renewal proposal (established score remains); see attachment F titled “FY24 On-Call List with Scores.”
Section 3, Proposal Submittal Format explains the requirements for each option. In the event a proposal (new or renewal) is not received, AHEC will consider this action as the current Contractor/Service Provider no longer interested in the Small Construction Program and will forfeit their score and spot on the list.
Contractors/Service Providers who are NOT identified on the FY24 On-Call List (Attachment F) must submit a “new” proposal; see Section 3.2 for submittal requirements.
Failure to submit any requested documents may result in disqualification.
AHEC intends to review the Contractors/Service Providers list on a bi-annual basis and may remove any Contractors/Service Providers who are performing poorly, rarely participate in project opportunities (i.e., no-show to pre-bid/walk-through invites, or rarely submit a project quote/bid), or are no longer interested in participating in this program.
Contractor understands that AHEC’s employees may be English-speaking only, and agrees to provide at least one employee who is proficient in English to be present while Contractor is performing the work to ensure that the ability of AHEC’s English-speaking employees to clearly communicate with the Contractor’s employees is not impaired (i.e., a translator). This employee must have the proven ability to read signs, labels, work schedules and simple instructions in English; understand and follow oral directions in English; write simple messages in English and speak English sufficiently to communicate clearly with the public and with AHEC’s employees. AHEC does not provide a translator for Contractor’s non-English proficient employees.
Be advised pre-qualification under this RFP is not a guarantee of work.
2.2 Overview
It is the intent of AHEC to select Contractors/Service Providers that are capable of successfully executing construction projects in occupied education environments/spaces without incurring disruption of on-going programs.
Work may be performed for any properties owned and managed by AHEC, or for any of the institutions on the Auraria Campus. Projects to be bid under the Small Construction Project Program shall not exceed in total cost:
• $500,000 for General Contractor - Large Projects and Restoration & Repairs services
• $250,000 for General Contractor - Small Projects, General Contractor – Historical Restoration, and all other trades
Submitted proposals will be evaluated by trade and by a select panel that will be involved in the projects or understand the aspects of the services required under the small construction project program.
2.3 Pre-qualified Contractors/Service Providers: Project Selection Process
The selection process for work under the On-Call Small Construction Project Program will be based upon the following:
• Pre-qualification process: 100% based on qualifications
• Project Documented Quote Process: 100% based on the firm, fixed-priced documented quote, verification and understanding of the project scope, and project schedule. Pre-or Post-qualifications may occur for specialized projects.
Contractors/Service Providers that have been named on the pre-qualification list under the respective trade will conduct a two (2) step process to be selected for project work:
• All Contractors/Service Providers under the respective trade will be invited to provide a documented quote on projects that become available under the Small Construction Project Program between:
o $50,000 and $500,000 for General Contractor - Large Projects and Restoration & Repair services o $50,000 and $250,000 for General Contractor - Small Projects, General Contractor – Historical Restoration, and all other trades
• A contract or purchase order, depending on project value, will be awarded to the responsive, responsible Contractor/Service Provider with the lowest documented quote for that project.
AHEC reserves the right to:
• Invite any single pre-qualified Contractor/Service Provider to provide a quote for projects under $50,000.
• May negotiate with the lowest acceptable quote to make the quote more advantageous to the agency.
• Publicly bid any construction project under $500,000.
2.4 Project Requirements and Award Process
Contractors/Service Providers submitting a project documented quote/bid shall:
• Quote the entire project including labor, material, and schedule.
• Include parking costs for all Contractors/Service Providers, sub-contractors, and any additional vendors needed for each project. Parking passes will not be provided to all construction team members. Parking passes will be issued to awarded bidder on a per project basis in accordance to AHEC Parking Policy. It will be the awarded Contractor’s/Service Provider’s responsibility to maintain and distribute the parking passes. Contractor/Service Provider shall pay any parking fines incurred as the result of parking in a non-designated area.
It is highly encouraged that all Contractors/Service Providers review the Contract Forms and Procedural Forms made available on the State of Colorado, Office of the State Architect’s (OSA’s) official website:
https://www.colorado.gov/osa.
Commitment documents (contracts and purchase orders) are per State of Colorado Office of the State Architect standard agreements. Modifications to the agreements will not be accepted. Any and all discrepancies with the State of Colorado Office of the State Architect standard agreements after award may result in dismissal as a program participant. It shall be further noted that the General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23) apply to ALL construction projects awarded in accordance with this RFP, regardless of dollar amount.
Specific information and forms may be found at:
https://osa.colorado.gov/state-buildings/project-management-policies-guidelines
The following is intended as a guide; it includes, but is not limited to, project requirements for each project value:
Projects less than $50,000:
• Purchase Order may be used as commitment document
• Purchase Order will serve as Notice to Proceed
• Per State Procurement Requirements, Contractors/Service Providers must provide detailed labor and materials prices as requested by the assigned Project Manager (Projects that are bid may be lump sum pricing because they are competitively bid).
This detailed information must include: # of hours and per hour labor rate (that matches Attachment D, Personnel Rate Sheet) and a quote for materials from supplier on supplier letterhead.
https://www.colorado.gov/osa https://osa.colorado.gov/state-buildings/project-management-policies-guidelines
Projects between $50,000 and less than $150,000:
• Bid Bond required for projects $50,000 or greater
• Purchase Order may be used for projects less than $150,000 o Purchase order will serve as Notice to Proceed
• Retainage required on projects $150,000 or greater
• Contactor’s Design/Bid/Build Agreement required for projects $150,000 or greater o Notice to Proceed required prior to beginning on-site work
Project between $150,000 and less than $500,000:
• Bid Bond required
• Contractor’s Design/Bid/Build Agreement required
• Performance Bond required
• Labor and Material Bond required
• Notice to Proceed required prior to beginning on-site work
• Retainage required
• Notice of Final Settlement published before the final payment is made and retainage is released.
• Shall require a project specific safety plan and manual. Manual must be approved by the assigned Project Manager and Campus Environmental, Health and Safety personnel prior to construction start.
• Follow the Office of the State Architect close-out requirements
2.5 Contractor/Service Provider Responsibilities
• Preferred, but not required, use of Contractors/Service Providers from AHEC’s On-Call Pre-qualified List.
• Adhere to the latest version of all contractual and procedure documents.
• Comply with all AHEC Procurement and project policies and procedures.
• Comply with The Contractor’s Handbook: Working Successfully at the Auraria Higher
Education Center 2nd Edition; to be issued to successful Pre-qualified Contractors/Service Providers (Attachment G for reference).
• Shall comply with all OSHA regulations for construction. Corrections to comply with OSHA requirements shall be remedied immediately. No activities should be undertaken that may place faculty, students, staff, or the general public at risk. If these activities are required, they must be coordinated in advance with the assigned Project Manager.
• Shall coordinate material deliveries, utility outages and impacts to the campus community in advance of those events. Communication bulletins or Methods of Procedures must be submitted at least three (3) weeks in advance of any activity that may impact normal campus activities. All deliveries for construction projects must be received on campus before 7:00 AM each morning after advanced review and approval by the assigned Project Manager.
• Shall route all correspondence to and through the assigned Project Manager. Any correspondence not sent to, or copied to, the assigned Project Manager will be approached as if it was never sent. All project correspondence and information must reference campus project number and project name.
• Shall coordinate submittal review with the designated Project Manager on all projects.
• Submit all pay applications/invoices by email to: Facilitiesinvoices@ahec.edu. Pay applications/invoices will be routed from this e-mail to the respective Project Manager.
Note: DO NOT send pay applications/invoices directly to the Project Manager as this could delay payment. Pay applications/invoices must include project number, project name, and Project Manager. Failure to include such information may result in the rejection or delay of payment processing (at no fault of AHEC). By State Statute, payment terms are 45 days from the date of submittal of a correct pay application or invoice. (The submission date for pay applications/invoices returned to the Contractor for correction is the date of receipt of the corrected submittal.)
• All meeting times, deadlines, and timeframes shall always be met or adhered to.
Contractors/Service Providers must communicate with the assigned Project Manager to include tardiness to a meeting/event, or inability to make a planned appointment. No shows, lack of discipline and follow-up by Contractors/Service Providers may impact future work opportunities.
• Substitution of Project Manager/Supervisor: if a substitution becomes necessary, the Contractor/Service Provider shall make sure the replacement person holds the same level of skill, licenses, and certifications as held by the person being replaced. Proposed replacement must be coordinated with the assigned Project Manager and must be pre-approved. AHEC reserves the right to disallow the substituted person.
• Contractor/Service Provider keys will be assigned to companies per project. Keys must be returned to the campus lock box in the Facilities Services building at the end of each shift and to the assigned Project Manager at the completion of each project. There is a $25 deposit required for the Contractor/Service Provider ID that will be assigned to each company. Deposit shall be cash or company check only. Deposit is returned when Contractor/Service Provider ID is returned. Companies are required to sign and adhere to the campus key and key box policies. No exceptions.
• Shall bring all necessary tools, equipment, and manpower to meet the proposed project schedule. AHEC will not provide any tools, equipment, or labor to supplement responsibilities of the awarded project Contractor/Service Provider.
• Shall provide the following Personal Protective Equipment (PPE) to all employees working on the Auraria Campus: hard hats, safety glasses, high visibility vests, hard toe shoes, long paints, and shirts with sleeves 4" or longer. PPE is required at all times while on campus in active work zones. No exceptions. Firms that do not adhere to this requirement will be removed from the program.
AHEC reserves the right to update and to require contractors to comply with health policies as provided by the Center for Disease Control Rules and Regulations and to comply with any requirements imposed by Colorado Department of Public Health and Environment (CDPHE), or local Health Departments.
• Individual Contractors/Service Providers (one-person firms) may submit proposals for any of the trades identified in the RFP o If submitting for multiple trades, Individual Contractors/Service Providers must include separate, clearly marked files within their proposal for each trade they want to be considered for, and include all required documentation for the specified trade(s).
o AHEC will not incorporate any missing information or combine files from one proposal to another.
o Failure to meet this requirement may result in disqualification of proposal.
• Prevailing wages may apply for projects over $500K; when applicable projects are estimated to be close to that amount, AHEC will include the prevailing wage information in the bid notices.
mailto:Facilitiesinvoices@ahec.edu
SECTION 3: PROPOSAL SUBMITTAL FORMAT
3.1 Submittal Requirements
A Contractor/Service Provider who is NOT identified on the FY24 On-Call List (Attachment F) under the respective trade and any Contractor/Service Provider wanting to be considered for the General Contractor – Small Projects, and General Contractor – Historical Restoration categories must submit a “new” proposal. Current FY24 On-Call Contractors/Service Providers who elect to submit a “new” proposal will forfeit their listed score and spot under the respective trade. “New” proposals shall be submitted in accordance to Section 3.2 – New Proposal Outline/Format and will be evaluated in accordance to Section 4: Evaluation.
FY24 On-Call Contractors/Service Providers who want to keep their existing score under the respectful trade must submit a “renewal” proposal in accordance to Section 3.5 – Renewal Proposal.
3.2 NEW Proposal Outline/Format
Each proposal shall not exceed a total of twenty (20) pages single-sided or ten (10) pages double-sided, excluding cover and tabs. Note: any cover letter, or Table of Contents, which are not required, will NOT count against this page total. Additional information, if provided, shall appear at the end of the proposal under its own tab and shall not exceed four (4) pages single-sided or two (2) double-sided pages. All required attachments will NOT count toward the page limit.
Tab 1: Contractor/Service Provider Business Information
• Request for Proposal Cover Sheet (completed and signed)
• Business summary must include:
o Specify trade seeking consideration under (refer to trade names in Section 2.1) and the type of proposal (new or renewal), o Primary contact person for this RFP including phone number and email address, o History of business, to include, but not limited to: size and number of years in business in the State of Colorado and how many years of experience in the institutional or heavy commercial industry?
• Certificate of Insurance (Attachment B; highlighted language must be included)
• W-9 form (Attachment C)
• Certificate of Good Standing from the Colorado Secretary of State’s Office
• Letter from Surety expressing the Contractor’s/Service Provider’s bonding ability and capacity (maximum bonding for this program is $500,000 per project).
Tab 2: Contractor/Service Provider Acknowledgement
Each statement below must be present in the Contractor’s/Service Provider’s proposal and clearly be marked with “Accept” or “Decline.”
• Contractor/Service Provider must verify field conditions, identify and correct any issues that are not code compliant in the immediate area of each project. All projects on the Auraria Campus must be brought up to current code requirements when applicable. If a code regulation does not exist, the Contractor/Service Provider will perform work using best practices known to the trade that will result in promoting the public’s health, safety, and welfare;
• Contractor/Service Provider will obtain all permits, when required and/or applicable to the project, and maintain applicable insurance requirements;
• Contractor/Service Provider will obtain all bonds, when required and/or applicable to the project;
• Any and all discrepancies, objections, exemptions, or modifications to the Office of State Architect forms, agreements, and/or the terms and conditions will not be accepted. It is understood that any and all requested changes made after an award may result in dismissal as a program participant.
Tab 3: Project References
Provide a minimum of three (3) project references within the last three (3) years that your business has completed, or currently has in progress, related to the respective trade seeking consideration under, as specified below:
Each project should have an original bid amount range as follows:
• $50,000 up to $500,000 for General Contractors - Large Projects and Restoration & Repair projects;
• $50,000 up to $250,000 for General Contractors - Small Projects, General Contractor - Historical Restoration, Plumbing, Electrical (Medium Voltage), Electrical (Building), Mechanical HVAC, Asbestos Abatement, Fire Alarm, Fire Suppression, and Flooring projects;
• Up to $50,000 for Painting, Moving, Welding, Casework, Campus Signage, Concrete, Roofing, Security Camera, Security Systems, Access Control, and Automatic Door Operator/Access Technology, and Window/Glass projects.
Each project reference must include:
• Project Name
• Project Type (new construction, renovation, maintenance, etc.)
• Project Amount (breakdown to include original bid, change orders, and final contract value)
• Project Description
• Project Environment (i.e., Higher Education, hospital, research/manufacturing facility, etc.)
• Project Status: Completed/Delayed/In Progress and include date. If delayed, explain why.
• Owner’s Principle Representative and/or Architect/Engineer contact (name, address, phone number and email address)
• Project Manager/Superintendent/Key Personnel with descriptions of function(s) they performed
Project references for the following trades must demonstrate experience in:
• Welding: architectural/structural/maintenance welding such as doors, stairs, hand rails, platforms, etc.
• Concrete: flatwork, stems walls, and stamped concrete.
• Case Work: custom millwork such as countertops, base and wall cabinets, etc.
• Painting: drywall finishing and paint.
• Moving: various building spaces such as offices, classroom, lab, etc.
• Roofing: commercial and/or residential installation of roof coverings such as valleys, gutters, downspouts, and waterproofing.
• Campus Signage: fabricating, installing, and maintaining quality 3-D lettering systems.
• Security Camera: ability to install and maintain Avigilon camera systems.
• Security System: installing and maintaining Honeywell systems such as Vista and Vista
128BPT to include panic alarm and intrusion detection.
• Access Control: installing and maintaining access control and closed circuit TV (CCTV) to include panic alarm, intrusion detection, and camera systems.
• Automatic Door Operator/Access Technology: Stanley automatic door installation on swing doors.
• Flooring: providing and installing Shaw product flooring such as carpet (rolls and tiles), luxury vinyl tile (LVT), vinyl composition tile (VCT), and tile in an institutional or commercial environment.
• Window & Glass: providing and installing commercial grade windows as well as historic applications.
Proposers without a record of relevant past performance or for whom information on past performance is not available will receive a neutral past performance rating; however, Contractor/Service Provider must provide a written explanation for any unavailable project information.
Tab 4: Personnel
Provide brief resume, or summary of qualifications, including the number of years of supervisory experience, for the following personnel who will be assigned to work on the Auraria Campus:
• Project Manager(s)
• Superintendent(s)
• Foreman(men)
Include the number of any additional in-house personnel that will be made available to perform work on projects (i.e. technicians, laborers, etc.) and briefly describe job duties/responsibilities.
All trades must FULLY complete Attachment D titled “Personnel Rate Sheet” for their respective trade; does not count toward page limit.
Rates shall remain firm for period of July 1, 2024 through June 30, 2025. AHEC reserves the right to negotiate rates upon Contractor/Service Provider selection and at the time of any renewal.
Tab 5: Claims
Provide information on any claims and/or lawsuits your business has been involved in during the last five
(5) years.
Each Contractor/Service Provider must respond to the following:
• Has your business ever…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .