Agreement- GC Services Tenant Fit Out Project at Jacob K Javits FOB.pdf
PDF 276 KB Posted
- Attached to
- GC Services for the Tenant Fit Out Project at the Jacob K. Javits Federal Building, New York, NY
- Solicitation number
- 47PC0322R0007
About this file
This solicitation is for general contractor (GC) services for a tenant fit out project on the 37th and 38th floors of the Jacob K. Javits Federal Building in New York, NY. The project includes demolition, construction, and installation of architectural, structural, mechanical, electrical, plumbing and fire protection systems. The work must be performed within a highly secure occupied building without disruption to existing tenants. The period of performance is 10 days after NTP to achieve substantial completion within 242 calendar days of NTP, with final completion within 60 days thereafter. Pricing is in the form of firm fixed price contract line items for the base contract and any alternates. The solicitation includes specifications, drawings, wage determinations and other attachments outlining project requirements. The contracting agency is the General Services Administration Public Buildings Service Region 2.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol. Reference No. 47PC0322R0007 GSA Contract No: TBD
Construction Contract for: GC Services for the Tenant Fit Out Project on the 37th and 38th floors at the Jacob K. Javits Federal Building, New York, NY
The Agreement
Document: C101/FEBRUARY 2022 (The Agreement)
Table of Contents
I. Project Information A. Project Summary B. The Contract C. Period Of Performance D. Work Conditions/Site Requirements E. Authorized Representatives F. Contract Liquidated Damages Rate G. Buy American Exceptions H. Statement of Work, Specifications, Drawings, Exhibits and Other Attachments
II. Prices A. Basis of Pricing B. Contract Price Form
III. Terms and Conditions A. Contractor Responsibilities B. Project Schedule C. Submittals D. Finality of Contract Modifications E. Liquidated Damages F. Insurance Requirements G. Order of Precedence H. Administrative Matters I. Non-Compliance with Contract Requirements J. Safeguarding Sensitive Data and Information Technology Resources K. Options and Allowances L. Equal Employment Opportunity Plan
IV. Contract Clauses A. Clauses Incorporated in Full Text
1. FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
2. FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 08)
3. GSAR 552.204-9 Personal Identity Verification Requirements (JUL 2021)
4. GSAR 552.252-6 Authorized Deviations in Clauses (Deviation FAR 52.252-6)
(Sep 99)
5. FAR 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020)
6. Buy American Requirements
7. FAR 52.228-11, Pledges of Assets (DEVIATION APR 2020)
8. FAR 52.232-40, Providing Accelerated Payments to Small Business
Subcontractors (DEVIATION APR 2020)
B. Clauses Incorporated by Reference C. Subcontract Requirements
Document: C101/FEBRUARY 2022
I. Project Information
I.A. Project Summary
The project is for a General Contractor to provide construction services for the Tenant Fit Out Project at the Jacob K. Javits (Javits) Federal Building located at 26 Federal Plaza in New York, NY.
The Javits Federal Building is a 41 story tower built in 1967 with a 45 story annex added in 1974. The project is being completed on the 37th and 38th floors. It will total approximately 92,000 square feet. This project will require work to be performed in an occupied building within highly secure areas without disruption to the operations of the existing tenants; and will include but not be limited to such work items as: removal and reinstallation of spray-on fireproofing, modifications to the mechanical, electrical, plumbing, and fire and life-safety systems along with a complete fit out of architectural finishes.
I.B. The Contract
(1) The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.
(2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract.
I.C. Period of Performance
(1) Commencement. The Contractor shall commence performance within 10 days after the Contractor receives the Notice to Proceed (NTP).
(2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 242 calendar days from issuance of Notice to Proceed (NTP).
(3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 60 calendar days of Substantial Completion.
I.D. Work Conditions/Site Requirements
Refer to all drawings and specifications for a complete set of requirements. Specifically, the contractor shall refer to Section 011400 Work Restrictions.
Document: C101/FEBRUARY 2022
I.E. Authorized Representatives
(1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing:
Authorized Representative Information:
Contracting Officer’s Information
Name: Winnie Eng
Address: One World Trade Center, 55th Floor, New York, NY 10007
Telephone: 212-264-2575
Email: Winnie.Eng@gsa.gov
(2) For the applicable authorities and limitations see Section IV of this Agreement, GSAR 552.236-70.
I.F. Contract Liquidated Damages Rate In accordance with GSAR 552.211-12, Liquidated Damages – Construction, in Section IV of this Agreement, liquidated damages shall be calculated at the rate of $2,265.11 per calendar day.
I.G. Buy American Exceptions For the applicable Buy American clause and any exceptions, see Section IV of this Agreement, GSAR 552.236-70.
I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments
The following documents are incorporated by reference into this Contract.
(1) Specifications for GSA Tenant Fit Out, Dated May 6, 2022 and includes the following sections:
VOLUME 1
Division 00 – Procurement And Contracting Requirements 003100 Available Project Information
Access Request to the Telephone/Electrical Closet Permit for Welding, Cutting, or Brazing Fire Protection System Impairment Notification Building Access Request
Document: C101/FEBRUARY 2022
Division 01 - General Requirements 011000 Summary 011400 Work Restrictions 012100 Allowances 012300 Alternates 012500 Substitution Procedures 012900 Payment Procedures 013000 Project Management Information System 013100 Project Management and Coordination 013110 Critical Path Method (CPM) Scheduling 013200 Construction Progress Documentation 013220 Photographic Documentation 013300 Submittal Procedures 013510 Historic Building Treatment Procedures 014000 Quality Assurance and Control Requirements 014200 References 014339 Mockups 015000 Temporary Facilities and Controls 015930 Security Regulations
Contractor Information Worksheet 015950 Safety and Health 016000 Product Requirements 017000 Execution Requirements 017310 Cutting and Patching 017320 Selective Demolition 017350 Fire Prevention Precautions for Hot Work 017419 Construction and Demolition Waste Management and Disposal 017700 Closeout Procedures 017810 Project Record Documents 017822 Operation and Maintenance Documentation 017825 Building Information and Modeling (BIM) and Construction
Operations Building Information Exchange (COBie) 018111 Sustainable Design Requirements 018119 Construction Indoor Air Quality Requirements 018200 Demonstration and Training 018601 General Acoustical Requirements 019113 General Commissioning Requirements
Division 02 - Existing Condition 024121 Non-ACM Fireproofing Removal Work Plan 028200 Management of Lead Containing Paint
Division 03 - Concrete 035416 Hydraulic Cement Underlayment
Division 05 - Metals 055000 Metal Fabrications 057000 Decorative Metal
Document: C101/FEBRUARY 2022
Division 06 - Wood, Plastics and Composites 061053 Miscellaneous Rough Carpentry 064023 Interior Architectural Woodwork 064113 Wood-Veneer-Faced Architectural Cabinets 064216 Flush Wood Paneling
Division 07 - Thermal and Moisture Protection 072100 Thermal Insulation 072119 Foamed-in-Place Insulation 078100 Applied Fireproofing 078413 Penetration Firestopping 078443 Joint Firestopping 079200 Joint Sealants 079219 Acoustical Joint Sealant
Division 08 - Openings 081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083474 Acoustically Rated Door Assemblies
084126.23 Interior All Glass Entrances
084213 Aluminum-Framed Entrances 087100 Door Hardware 088000 Glazing
Division 09 - Finishes 090161 Stone Cleaning and Restoration 090163 Terrazzo Repair and Cleaning
090190.52 Maintenance Repainting
092116.23 Gypsum Board Shaft Wall Assemblies
092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Tiling 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096536 Static-Control Resilient Flooring 096543 Linoleum Flooring 096623 Resinous Matrix Terrazzo Flooring 096813 Tile Carpeting 097200 Wall Coverings 097723 Fabric Wrapped Panels 098413 Fixed Sound Absorptive Panels 099123 Interior Painting 099301 Concrete Floor Sealer
Division 10 - Specialties
101423.16 Room-Identification Panel Signage
102113.14 Stainless-Steel Toilet Compartments
102113.19 Plastic Toilet Compartments
102600 Wall and Door Protection
Document: C101/FEBRUARY 2022
102800 Toilet Accessories 104413 Fire Protection Cabinets 104416 Fire Extinguishers Division 11 - Equipment 113013 Appliances Division 12 - Furnishings 122413 Roller Window Shades 123216 Manufactured Plastic-Laminate-Clad Casework
123623.13 Plastic-Laminate-Clad Countertops
123640 Stone Countertops
123661.16 Solid Surfacing Countertops
123661.19 Quartz Agglomerate Countertops
VOLUME 2
Division 21 - Fire Suppression 211313 Wet-Pipe Sprinkler Systems
Division 22 – Plumbing 220000 General Provisions for Plumbing Work 220523 General-Duty Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 220548 Noise and Vibration Control for Plumbing Systems 220533 Heat Tracing for Plumbing Piping 220719 Plumbing Piping Insulation
220719.11 Under-Lavatory Pipe and Supply Covers – Plumberex
220800 Commissioning of Plumbing 221005 Plumbing Piping 223000 Plumbing Equipment 224000 Plumbing Fixtures
Division 23 - Heating Ventilating And Air Conditioning 230002 Heating, Ventilation & Air Conditioning General Conditions 230003 Access Doors in General Construction 230004 Unit Prices 230200 Firestopping 230513 Electric Motors 230516 Expansion Fittings and Loops for HVAC Piping 230517 Sleeves and Escutcheons for HVAC Piping 230519 Meters and Gauges for HVAC Piping and Ductwork 230523 Valves 230529 Hangers, Anchors, Supports 230540 Acoustics 230548 Noise and Vibration Control for HVAC Systems 230548 Vibration Isolation 230553 Systems Identification 230593 Testing, Adjusting and Balancing 230700 Insulation 230800 Commissioning of HVAC Systems 230900 Instruments
Document: C101/FEBRUARY 2022
230923 Building Management System (BMS) 231113 Sheet Metal, Ductwork and Accessories 232500 Pipe Cleaning and Chemical Water Treatment 232600 Water Specialties 233305 Noise Control Accessories for Ductwork 233320 Duct Cleaning 233600 Air Terminal Units 233610 Air Outlets and Inlets 233620 Induction Units 234100 Air Filters and Cleaners 235210 Piping and Accessories 237305 Fans 238219 Fan Coil Units 238500 Variable Frequency Motor Controllers 238600 Electric Motor Controllers
Division 26 – Electrical 260001 Electrical General Conditions 260002 Unit Prices 260005 Access Doors in General Construction 260265 Testing, Adjusting and Balancing 260270 Temporary Lighting and Power 260280 Equipment Connections and Coordination 260290 Ceiling, Floor and Wall Electrical Penetration Fire Seals 260519 600 Volt Wire and Cable 260526 Grounding System 260533 Raceways and Boxes 260548 Noise and Vibration Control for Electrical Systems 260553 Identification for Electrical Systems 260573 Overcurrent Protective Device Coordination Study 260800 Commissioning of Electrical Systems 260960 Relays and Remote-Control Switches 262213 Low-Voltage Distribution Transformers 262416 Panelboards 262726 Wiring Devices 262813 Fuses (600V and Less) 262816 Disconnect Switches 262913 Installation of Individual Motor Controllers 265000 Luminaires and Accessories 265006 Lighting Control Devices
Division 27 – Communications 270500 Common Work Results for Communications 270526 Grounding and Bonding for Communications Systems 270528 Pathways for Communications Systems 270529 Hangers and Supports for Communications Systems 270536 Cable Trays for Communications Systems 270544 Sleeves and Penetrations for Communications Systems 270553 Identification for Communications Systems 271000 Structured Cabling – General Requirements
Document: C101/FEBRUARY 2022
271116 Communications Cabinets, Racks, and Enclosures 271123 Communications Cable Management and Cable Runway 271126 Communications Power Distribution Units 271131 Plywood Backboards for Communications Rooms 271313 Communications Copper Backbone Cabling & Terminations 271323 Communications Optical Fiber Backbone Cabling & Terminations 271513 Communications Copper Horizontal Cabling & Terminations 274116 Integrated Audio-Video Systems and Equipment
Division 28 - Electronic Safety And Security 280000 Common Work Results for Electronic Safety and Security 280553 Identification for Electronic Safety and Security 281100 Security Equipment Room Fittings 281500 Access Control Hardware Devices 282000 Video Surveillance 284600 Fire Detection and Alarm
(2) Construction Drawings for GSA Tenant Fit Out, Dated May 6, 2022 and includes the following sheets:
SHEET NUMBER SHEET TITLE
GENERAL
A0-00 SERIES GENERAL
G-00-01 COVER SHEET
G-00-02 DRAWING INDEX
G-00-03 GENERAL NOTES
G-00-04 MATERIAL SCHEDULE
G-00-06 CODE ANALYSIS AND LIFE SAFETY
G-00-07 LEVEL 37 - EGRESS PLAN
Document: C101/FEBRUARY 2022
G-00-08 LEVEL 38- EGRESS PLAN
ARCHITECTURAL
DEMOLITION
AD-10-00 SERIES PLANS
AD-10-01 LEVEL 37 - DEMO PLAN
AD-11-01 LEVEL 38 - DEMO PLAN
AD-80-00 DEMOLITION PICTURES
ARCHITECTURAL
A-10-00 SERIES PLANS
A-10-01 LEVEL 37- FLOOR PLAN
A-10-02 LEVEL 37 - REFLECTED CEILING PLAN
A-10-03 LEVEL37 - POWER PLAN
A-10-04 LEVEL 37 - FINISH PLAN
A-11-01 LEVEL 38 - FLOOR PLAN
A-11-02 LEVEL 38 - REFLECTED CEILING PLAN
A-11-03 LEVEL 38 - POWER PLAN
Document: C101/FEBRUARY 2022
A-11-04 LEVEL 38 - FINISH PLAN
A-30-00 SERIES SECTIONS
A-30-01 BUILDING SECTIONS
A-40-00 SERIES LARGE SCALE DRAWINGS
A-40-01 ELEVATOR LOBBY ENLARGED PLANS
A-40-02 RECEPTION ENLARGED PLANS AND ELEVATIONS
A-40-03 CORRIDOR ELEVATIONS
A-40-05 CONFERENCE ENLARGED PLANS
A-40-06 CONFERENCE ROOMS ELEVATIONS
A-40-10 OFFICE ENLARGED PLANS
A-40-11 OFFICE ELEVATIONS
A-40-30 PANTRY ENLARGED PLANS
A-40-31 PANTRY ENLARGED PLANS
A-40-32 PANTRY ELEVATIONS
A-40-40 SUPPORT SPACES ENLARGED PLANS
A-40-50 WC ENLARGED PLANS
Document: C101/FEBRUARY 2022
A-40-51 RESTROOMS ELEVATIONS
A-50 - 00 SERIES DETAILS
A-50-01 MILLWORK DETAILS
A-50-02 MILLWORK DETAILS
A-50-10 CEILING DETAILS
A-50-03 GLAZED PARTITION DETAILS
A-60 - 00 SERIES
SCHEDULES, DIAGRAMS AND DETAILS NOT TO
SCALE
A-60-01 PARTITION TYPES
A-60-02 PARTITION AND BASE DETAILS
A-60-05 DOOR SCHEDULE LEVEL 37
A-60-06 DOOR SCHEDULE LEVEL 38
A-60-07 DOOR TYPES & DETAILS
A-60-08 DOOR DETAILS- KI DOORS
A-70 - 00 SERIES 3D PRESENTATION TO SCALE
A-70- 01A LEVEL 37 DIMENSION PLAN_EAST
Document: C101/FEBRUARY 2022
A-70- 01B LEVEL 37 DIMENSION PLAN_WEST
A-70- 02A LEVEL 37 RCP DIMENSION PLAN_EAST
A-70- 02B LEVEL 37 RCP DIMENSION PLAN_WEST
A-71- 01A LEVEL 38 DIMENSION PLAN_EAST
A-71- 01B LEVEL 38 DIMENSION PLAN_WEST
A-71- 02A LEVEL 38 RCP DIMENSION PLAN_EAST
A-71- 02B LEVEL 38 RCP DIMENSION PLAN_WEST
ARCHITECTURAL
SIGNAGE
AS-10-01 LEVEL 37 ARCHITECTURAL SIGNAGE
AS-10.02 LEVEL 38 ARCHITECTURAL SIGNAGE
AS-50.01 ARCHITECTURAL SIGNAGE
AS-50.02 ARCHITECTURAL SIGNAGE
AS-50.03 ARCHITECTURAL SIGNAGE
AS-50.04 ARCHITECTURAL SIGNAGE
AS-50.05 ARCHITECTURAL SIGNAGE
Document: C101/FEBRUARY 2022
AS-50.06 ARCHITECTURAL SIGNAGE
AS-50.07 ARCHITECTURAL SIGNAGE
AS-50.08 ARCHITECTURAL SIGNAGE
AS-50.09 ARCHITECTURAL SIGNAGE
AS-50.10 ARCHITECTURAL SIGNAGE
AS-50.11 ARCHITECTURAL SIGNAGE
AS-50.12 ARCHITECTURAL SIGNAGE
AS-50.13 ARCHITECTURAL SIGNAGE
AS-50.14 ARCHITECTURAL SIGNAGE
AUDIO VISUAL
AV-00-01 AV LEGENDS AND NOTES
AV-00-02 AV PANELS AND RACKS LEGENDS AND NOTES
AV-37-01 AV DEVICE LOCATIONS LEVEL 37
AV-37-02 AV DEVICE LOCATIONS LEVEL 37 RCP
AV-38-03 AV DEVICE LOCATIONS LEVEL 38
AV-38-04 AV DEVICE LOCATIONS LEVEL 38 RCP
Document: C101/FEBRUARY 2022
AV-50-01
AV DEVICE DETAILS CONFERENCE ROOM
(RECESSED)
AV-50-02 AV DEVICE DETAILS 7 SEAT CONFERENCE ROOM
AV-50-04 AV DEVICE DETAILS TYPICAL DISTRIBUTED DISPLAYS
AV-60-01 AV TERMINATION SCHEDULE 37TH FLOOR
AV-60-02 AV TERMINATION SCHEDULE 38TH FLOOR
AV-60-03 AV CABLE SCHEDULE
AV-60-04 AV INFRASTRUCTURE DETAILS
AV-60-10 AV PLATE ELEVATIONS
AV-60-12 AV RACK ELEVATIONS
AV-60-32 AV SIGNAL FLOWS 7 & 9 SEAT CONFERENCE ROOMS
AV-60-37 AV SIGNAL FLOWS MASKING & PAVING SYSTEM
ACOUSTICS
AC-10-01 LEVEL 37 - FLOOR PLAN
AC-11-01 LEVEL 38 - FLOOR PLAN
STRUCTURAL
Document: C101/FEBRUARY 2022
S01-00 GENERAL NOTES AND UNIFORM LOAD DIAGRAMS
S10-01 LEVEL37 FRAMING PLAN
S11-01 LEVEL38 FRAMING PLAN
S50-00 TYPICAL GUIDELELINES AND DETAILS
MECHANICAL
M0 - 00 SERIES GENERAL
M-01-01 MECHANICAL DRAWING LIST
M-03-01 MECHANICAL LOAD CALCULATIONS - LEVEL 37
M-03-02 MECHANICAL LOAD CALCULATIONS - LEVEL 38
MD10 - 00 SERIES DEMOLITION PLANS
MD-10-01 MECHANICAL DEMO PLAN - LEVEL 37
MD-11-01 MECHANICAL DEMO PLAN - LEVEL 38
M20 - 00 SERIES PLANS
M-20-01 MECHANICAL FLOOR PLAN - LEVEL 37
M-20-02 MECHANICAL REFLECTED CEILING PLAN - LEVEL 37
M-21-01 MECHANICAL FLOOR PLAN - LEVEL 38
Document: C101/FEBRUARY 2022
M-21-02 MECHANICAL REFLECTED CEILING PLAN - LEVEL 38
M40 - 00 SERIES ISOMETRIC/3D VIEWS
M-40-01 MECHANICAL ISOMETRIC VIEW AND SECTIONS
M-40-02 MECHANICAL ISOMETRIC DETAILS
M-41-01 LEVEL 37 BEAM PENETRATIONS
M-41-02 LEVEL 38 BEAM PENETRATIONS
M-42-01 MECHANICAL SECTIONS
M50 - 00 SERIES RISER DIAGRAMS
M-50-01 MECHANICAL EXISTING AIR RISER DIAGRAM
M-50-02 MECHANICAL NEW WORK AIR RISER DIAGRAM
M60 - 00 SERIES SCHEDULES
M-60-01 MECHANICAL SCHEDULES SHEET #1
M70 - 00 SERIES DETAILS
M-70-01 MECHANICAL DETAILS SHEET #1
M-70-02 MECHANICAL DETAILS SHEET #2
M-70-03 MECHANICAL DETAILS SHEET #3
Document: C101/FEBRUARY 2022
M80 - 00 SERIES CONTROLS
M-80-01 MECHANICAL CONTROLS SHEET #1
ELECTRICAL
E0 - 00 SERIES GENERAL
E-01-01 ELECTRICAL DRAWING LIST
E-02-01
ELECTRICAL SYMBOLS, ABBREVIATIONS AND SCOPE
OF WORK
E-03-01 ELECTRICAL LIGHTING FIXTURE SCHEDULE
E-03-02 LIGHTING CONTROL DIAGRAM #1
E-03-03 LIGHTING CONTROL DIAGRAM #2
E20 - 00 SERIES PLANS
E20-00 ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 37
E-20-01 ELECTRICAL FLOOR PLAN - LEVEL 37
E-20-02 ELECTRICAL REFLECTED CEILING PLAN - LEVEL 37
E-21-01 ELECTRICAL FLOOR PLAN - LEVEL 38
E-21-02 ELECTRICAL REFLECTED CEILING PLAN - LEVEL 38
Document: C101/FEBRUARY 2022
E50 - 00 SERIES RISER DIAGRAMS
E-50-01 ELECTRICAL POWER RISER DIAGRAMS
E60-00 SERIES ELECTRICAL SCHEDULES
E-60-01 ELECTRICAL SCHEDULES SHEET #1
E-60-02 ELECTRICAL SCHEDULES SHEET #2
E-60-03 ELECTRICAL SCHEDULES SHEET #3
E70-00 SERIES ELECTRICAL DETAILS
E70-01 ELECTRICAL DETAILS SHEET #1
E70-02 ELECTRICAL DETAILS SHEET #2
TELECOMMUNICATI
ON
T0 - 00 SERIES GENERAL
T-01-01 TELECOM DRAWING LIST
T-02-01
TELECOM SYMBOLS, ABBREVIATIONS AND SCOPE OF
WORK
T20 - 00 SERIES PLANS
T-20-01 TELECOM FLOOR PLAN - LEVEL 37
Document: C101/FEBRUARY 2022
T-21-01 TELECOM FLOOR PLAN - LEVEL 38
T30 - 00 SERIES SECURITY PLANS
T-30-01 SECURITY FLOOR PLAN - LEVEL 37
T-31-01 SECURITY FLOOR PLAN - LEVEL 38
T40 - 00 SERIES ENLARGED PLANS
T40 - 01 TELECOM LEVEL 37 ENLARGED TELECOM ROOMS
T40 - 02 TELECOM LEVEL 38 ENLARGED TELECOM ROOMS
T70 - 00 SERIES DETAILS
T-70-01 TELECOM DETAILS - GROUNDING
T-70-02 TELECOM DETAILS - PATHWAY
T-70-03 TELECOM DETAILS - OULTET
T-70-04 TELECOM DETAILS - PATHWAY
T-70-05 TELECOM DETAILS - ACCESS CONTROL
T-70-06 TELECOM DETAILS - CAMERA
PLUMBING
P0 - 00 SERIES GENERAL
Document: C101/FEBRUARY 2022
P-01-01
PLUMBING SYMBOLS DRAWING LIST, GENERAL
NOTES, AND SCHEDULES
P10 - 00 SERIES DEMOLITION PLANS
P-10-01 FLOOR 37 - PLUMBING FLOOR PLAN
P-11-01 FLOOR 38 - PLUMBING FLOOR PLAN
P20 - 00 SERIES DEMOLITION PART PLANS
P-20-01 FLOOR 38 - PART PLAN
P-21-01 FLOOR 38- PART PLANS
P30 - 00 SERIES PLANS
P-30-01 PLUMBING RISER DIAGRAMS
P40 - 00 SERIES PART PLANS
P-40-01 PLUMBING DETAILS
FIRE PROTECTION
FP0 - 00 SERIES GENERAL
FP-01-01
FIRE PROTECTION DRAWING LIST, SYMBOLS AND
ABBREVIATIONS
FPD- 00 SERIES FIRE PROTECTION DEMOLITION
Document: C101/FEBRUARY 2022
FPD-10-01
FIRE PROTECTION DEMOLITION FLOOR PLAN - LEVEL
FPD-11-01
FIRE PROTECTION DEMOLITION FLOOR PLAN - LEVEL
FP10 - 00 SERIES PLANS
FP-10-01 FIRE PROTECTION FLOOR PLAN - LEVEL 37
FP-11-01 FIRE PROTECTION FLOOR PLAN - LEVEL 38
FP-12-01 FIRE PROTECTION TCSP FLOOR PLAN - LEVEL 37
FP-13-01 FIRE PROTECTION TCSP FLOOR PLAN - LEVEL 38
FP70 - 00 SERIES DETAILS
FP-70-01 FIRE PROTECTION DETAILS SHEET
FIRE ALARM
FA0 - 00 SERIES GENERAL
FA-01-01
FIRE ALARM SYMBOLS LIST, GENERAL NOTES,
MATRIX, & DEVICE MOUNTING DETAIL
FA10 - 00 SERIES DEMOLITION PLANS
FA-10-01 FIRE ALARM 37TH REMOVAL PLAN
FA-10-02 FIRE ALARM 38TH REMOVAL PLAN
Document: C101/FEBRUARY 2022
FA20 - 00 SERIES PLANS
FA-20-01 FIRE ALARM 37TH FLOOR PLAN
FA-20-02 FIRE ALARM 38TH FLOOR PLAN
FA40 - 00 SERIES DETAILS
FA-40-01 FIRE ALARM DETAILS
FA50 - 00 SERIES RISER DIAGRAMS
FA-50-01 FIRE ALARM RISER DIAGRAM
(3) Commissioning Plan Dated May 6, 2022
(4) Commissioning Pre-Functional Testing Document Sample Dated May 6, 2022
(5) Commissioning Functional Performance Testing Document Sample Dated May 6,
(6) Javits 26 Federal Plaza HVAC Load and Calculations Report
(7) GSA and USAO - Javits Project Description of Systems Report (IFC) B21.15238.000 dated May 6, 2022
(8) Wage Determination NY20220003, Dated March 25, 2022
(9) Small Business Subcontracting Plan
II. Prices
II.A. Basis of Pricing
(1) Contract Prices. All Contract prices set forth in this Section include all costs necessary to complete the work for which the price is established (e.g., Base Contract, Unit Price, Options) in accordance with the Contract Documents, including, but not limited to, the cost of work performed by subcontractors and consultants, indirect costs, fees, expenses, taxes, and profit.
(2) Knowledge of Conditions Affecting Price. FAR 52.236-3, Site Investigations and Conditions Affecting the Work, is incorporated by reference in this Contract. The Contractor shall be
Document: C101/FEBRUARY 2022 presumed to have established all prices with knowledge of general and local conditions that may affect the cost of Contract performance at the site where the Work is to be performed, to the extent that such information is reasonably obtainable.
(3) Unit Prices and Allowances. If any portion of the Work is to be performed on a unit price basis, the Unit Price shall include all costs of coordinating and incorporating the unit-priced portion of the Work into the Base Contract Work. The Contractor shall only be obligated to perform unit-priced work to the extent that an Allowance has been established. The Contractor shall be obligated to perform such work in excess of a unit quantity for which an Allowance is established only if directed by the Contracting Officer in writing. The Contractor shall be bound to the unit price or prices set forth herein in all equitable adjustments for changes including unit priced work, and no markups shall be applied to such unit prices.
(4) Options. If any portion of the Work is to be performed upon the timely exercise of an Option, the Option Price shall include all costs of coordinating and incorporating the Option-priced portion of the Work into the Base Contract Work. An adjustment to the Contract price for such additional work shall be computed solely on the basis of the Option price or prices set forth herein. Unless otherwise specified, all options may be exercised within 90 days of Contract award.
(5) Bid Rates. If this Contract includes Bid Rates to be used in determination of equitable adjustments (e.g., overhead, profit, daily rates for time-related costs), such rates shall be deemed to include all costs recoverable as components of an equitable adjustment consistent with the requirements, definitions, and exclusions applicable to equitable adjustments set forth in this Contract, and consistent with the Contractor's cost accounting practices. Unless otherwise specified, the bid rates shall be deemed to include only the Contractor's costs, and not the costs of any subcontractors.
II.B. Contract Price Form
CLIN ITEM PRICE
1 Tenant Fit Out - Base Contract $
2 Deduct Alternate #1 37th Floor Restrooms $
Alternate #2 - Use TP-2 Stainless Steel Partitions in the Restrooms in lieu of TP-1 37th Floor $
Alternate #2 - Use TP-2 Stainless Steel Partitions in the Restrooms in lieu of TP-1 38th Floor $
Total Evaluated Price (Sum of CLINs 1-4) $
III. Terms and Conditions III.A. Contractor Responsibilities
GSAR 552.236-71, Contractor Responsibilities is located in Section IV.A. of this Agreement and is supplemented as follows:
(1) For the purposes of FAR 52.236-1, Performance of Work by the Contractor, the Contractor shall perform at least twelve (12) percent of the construction work.
Document: C101/FEBRUARY 2022
(2) The Contractor shall secure and pay for all necessary permits and governmental fees, licenses, and inspections that are customarily secured after award of the Contract and that are legally required at the time of award. The Contractor shall provide a copy of the permits required for execution of the work to the Contracting Officer prior to commencement of any related work.
(3) FAR 52.211-10, Commencement, Prosecution, and Completion of Work, and GSAR 552.211-10, Commencement, Prosecution and Completion of Work is supplemented as follows:
The Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of the Work, as defined in GSAR 552.211-70 Substantial Completion (Mar 2019) and the time specified in Section I (Project Information), “Period of Performance” clause. If the Contract specifies different completion dates for different phases or portions of the Work, the Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of such phases or portions of the Work within the times specified.
III.B. Project Schedule
GSAR 552.236-15, Schedules for Construction Contracts is supplemented as follows:
See Division 1 specification 013110 Prospectus CPM Schedule Specification for all requirements.
III.C. Submittals
FAR 52.236-21, Specifications and Drawings for Construction, and GSAR 552.236-723, Submittals located in Section IV.A. of the Agreement are supplemented as follows:
(1) The Contractor shall prepare and submit to the Contracting Officer shop drawings, samples, calculations, product information, mockups, and other submittals (collectively, "submittals") demonstrating compliance with Contract requirements for all Work components as specified elsewhere in this Contract.
III.D. Finality of Contract Modifications As set forth elsewhere in this Contract, the Contractor is entitled to additional consideration under certain conditions, including the issuance of change orders. It is the Contractor's duty to include in proposals for equitable adjustment or other consideration all compensation to which it may be entitled, including cost and time. Unless otherwise explicitly stated in a modification to the Contract providing such consideration, adjustments to the Contract price or time agreed upon therein shall be deemed to provide all compensation to which the Contractor is entitled, and shall constitute final settlement of the Contractor's entitlement to compensation on account of the change or other condition giving rise to the modification.
III.E. Liquidated Damages
The Contractor acknowledges that time is of the essence for the performance of the Work, and that determining actual damages from delay would be extremely difficult and impractical. If the Contractor fails to achieve Substantial Completion of the Work in accordance with FAR 52.211-12, Liquidated Damages, GSAR 552.211-12, Liquidated Damages and within the time specified in this Contract, the Contractor shall be liable to the Government for liquidated
Document: C101/FEBRUARY 2022 damages at the rate specified in Section I (Project Information), paragraph entitled, “Liquidated Damages Rate,” for each calendar day following the required completion date that the Work is not Substantially Complete.
III.F. Insurance Requirements
(1) The Contractor shall obtain and maintain for the entire life of the Contract, in addition to any insurance required by law, the following minimum kinds and amounts of insurance required pursuant to FAR clause 52.228-5, Insurance – Work on a Government Installation, and GSAR 552.228-5, Government as Additional Insured.
(a) Workers' compensation insurance in the amount required by the jurisdiction in which the Contract is performed. The Contractor shall obtain Employers' liability coverage of at least $2,000,000. If occupational diseases are not covered by workers' compensation insurance, Employers' liability coverage shall include occupational diseases.
(b) Broad form comprehensive commercial general liability insurance in the amount of at least $5,000,000 per occurrence. Such insurance shall include, but not be limited to, contractual liability, bodily injury and property damage.
(c) Comprehensive automobile liability covering the operation of all automobiles used in connection with performing the Contract in the amount of at least $1,000,000 per person and $2,500,000 per occurrence for bodily injury and $1,000,000 per occurrence for property damage.
(2) The Contractor shall require that the licensed design professionals it retains for the Project acquire and maintain professional liability insurance in the amount of $5,000,000 per claim and shall provide proof to the Contracting Officer.
(3) The Contractor shall promptly provide to the Contracting Officer proof that it has obtained insurance required by the Contract in the form of certificates of insurance. The Contractor shall submit to the Contracting Officer all renewal certificates issued during the life of this Contract immediately upon issuance.
III.G. Order of Precedence Different requirements within this Contract shall be deemed inconsistent only if compliance with both cannot be achieved. In case of inconsistency between Contract Documents, the following order of precedence shall apply:
(1) Section IV of the Agreement
(2) Sections I, II, and III of the Agreement
(3) The Statement of Work
(4) The Specifications
(5) The Drawings
(6) Exhibits and Other Attachments
III.H. Administrative Matters
(1) Project Meetings. The Contractor shall attend a preconstruction conference and shall participate in regularly scheduled Project meetings.
Document: C101/FEBRUARY 2022
(2) Payments. FAR clause 52.232-5, Payments under Fixed-Price Construction Contracts, is supplemented by GSAR 552.232-5 Payments under Fixed-Price Construction Contracts located in Section IV.A. of this Agreement. In accordance with the relevant FAR and GSAR clauses, GSA requires the following data be included with each invoice:
(a) Invoices shall be submitted electronically to the designated billing office specified in this Contract or in individual delivery/work. An electronic copy of the invoice shall be sent to the CO and COR as designated after award.
(b) Invoices must include the Account Document Number (ADN) assigned at award.
(c) The Contractor shall submit the following information or documentation with each invoice:
(i) Updated Schedule of Values upon which the payment request is based;
(ii) GSA Form 2419 - Certification of Progress Payments Under Fixed-Price Construction Contract;
(iii) The payment terms that apply for the particular services rendered;
(iv) Additional documentation: NA
(3) Prompt Payment. In accordance with FAR clause 52.232-27, the period for payments is as follows:
(a) Progress Payments: 14 days
(b) Subsequent Subcontractor Payments: 7 days
(4) Payment Information. The General Services Administration (GSA) makes information on contract payments available electronically at Office of the Chief Financial Officer. The Contractor may register at the site and review its record of payments. This site provides information only on payments made by GSA, not by other agencies.
(5) Security Clearances. Contractor shall comply with the following requirements pertaining to security clearances.
(a) All personnel performing work under the Contract on the Project site must obtain an Enter on Duty (EOD) determination before they will be granted access to the site.
(b) To obtain an EOD determination, Contractor shall submit for all such personnel fingerprints on Form SF87 and a completed Contractor Information Worksheet (CIW). Detailed information is available at Detailed information is available at GSA Access Card . USAccess Credentialing Centers can be located at US Access Centers.
(c) In addition, all such personnel who will be on site 6 months or longer must apply for and receive clearance in accordance with Homeland Security Presidential Directive 12 (HSPD-12). See Section IV, Contract Clauses, GSAR 552.204-9.
(6) Safeguarding and Dissemination of Controlled Unclassified Information (CUI) Building Information
Document: C101/FEBRUARY 2022 (The Agreement) https://finance.ocfo.gsa.gov/pii/piinotice.aspx?token=PI002 http://www.gsa.gov/portal/category/107203 http://www.fedidcard.gov/centerlist.aspx
This clause applies to all recipients of CUI building information (which falls within the CUI Physical Security category), including offerors, bidders, awardees, contractors, subcontractors, lessors, suppliers and manufacturers.
Marking CUI. Contractors must submit any contractor-generated documents that contain building information to GSA for review and identification of any CUI building information that may be included. In addition, any documents GSA identifies as containing CUI building information must be marked in accordance with the Order and the Marking Controlled Unclassified Information Handbook (the current version may be found at https://www.archives.gov/files/cui/20161206-cui-marking-handbook-v1-1.pdf) before the original or any copies are disseminated to any other parties. If CUI content is identified, the CO may direct the contractor, as specified elsewhere in this contract, to imprint or affix CUI document markings (CUI) to the original documents and all copies, before any dissemination, or authorized GSA employees may mark the documents.
1. Authorized recipients.
a. Building information designated as CUI must be protected with access strictly controlled and limited to those individuals having a Lawful Government Purpose to access such information, as defined in 32 C.F.R. § 2002.4(bb). Those with such a Lawful Government Purpose may include Federal, state and local government entities, and non-governmental entities engaged in the conduct of business on behalf of or with GSA. Non-governmental entities may include architects, engineers, consultants, contractors, subcontractors, suppliers, utilities, and others submitting an offer or bid to GSA, or performing work under a GSA contract or subcontract.
Recipient contractors must be registered as “active” in the System for Award Management (SAM) database at www.sam.gov, and have a Lawful Government Purpose to access such information. If a subcontractor is not registered in the SAM database and has a Lawful Government Purpose to possess CUI building information in furtherance of the contract, the subcontractor must provide to the contractor its DUNS number or its tax ID number and a copy of its business license. The contractor must keep this information related to the subcontractor for the duration of the contract and subcontract.
b. All GSA personnel and contractors must be provided CUI building information when needed for the performance of official Federal, state, and local government functions, such as for code compliance reviews and the issuance of building permits. Public safety entities such as fire and utility departments may have a Lawful Government Purpose to access CUI building information on a case-by-case basis. This clause must not prevent or encumber the necessary dissemination of CUI building information to public safety entities.
2. Dissemination of CUI building information:
a. By electronic transmission. Electronic transmission of CUI information outside of the GSA network must use session encryption (or alternatively, file encryption) consistent with National Institute of Standards and Technology (NIST) SP 800- 171. Encryption must be through an approved NIST algorithm with a valid certification, such as Advanced Encryption Standard or Triple Data Encryption Standard, in accordance with Federal Information Processing Standards
Document: C101/FEBRUARY 2022 (The Agreement) https://www.archives.gov/files/cui/20161206-cui-marking-handbook-v1-1.pdf
Publication 140-2, Security Requirements for Cryptographic Modules, as required by GSA policy.
b. By nonelectronic form or on portable electronic data storage devices. Portable electronic data storage devices include CDs, DVDs, and USB drives. Nonelectronic forms of CUI building information include paper documents, photographs, and film, among other formats.
i. By mail. Contractors must only use methods of shipping that provide services for monitoring receipt such as track and confirm, proof of delivery, signature confirmation, or return receipt. CUI markings must not appear on the exterior of packages.
ii. In person. Contractors must provide CUI building information only to authorized recipients with a Lawful Government Purpose to access such information. Further information on authorized recipients is found in section 1 of this clause.
3. Record keeping. Contractors must maintain a list of all entities to which CUI is disseminated, in accordance with sections 2 and 3 of this clause. This list must include, at a minimum: (1) the name of the state, Federal, or local government entity, utility, or firm to which CUI has been disseminated; (2) the name of the individual at the entity or firm who is responsible for protecting the CUI building information, with access strictly controlled and limited to those individuals having a Lawful Government Purpose to access such information; (3) contact information for the named individual; and (4) a description of the CUI building information provided. Once “as built” drawings are submitted, the contractor must collect all lists maintained in accordance with this clause, including those maintained by any subcontractors and suppliers, and submit them to the CO. For Federal buildings, final payment may be withheld until the lists are received.
4. Safeguarding CUI documents. CUI building information (both electronic and paper formats) must be stored within controlled environments that prevent unauthorized access. GSA contractors and subcontractors must not take CUI building information outside of GSA or their own facilities or network, except as necessary for the performance of that contract. Access to the information must be limited to those with a Lawful Government Purpose for access.
5. Destroying CUI building information. When no longer needed, CUI building information must either be returned to the CO or destroyed in accordance with guidelines in NIST Special Publication 800-88, Guidelines for Media Sanitization.
6. Notice of disposal. The contractor must notify the CO that all CUI building information has been returned or destroyed by the contractor and its subcontractors or suppliers in accordance with paragraphs 4 and 5 of this clause, with the exception of the contractor's record copy. This notice must be submitted to the CO at the completion of the contract to receive final payment.
For leases, this notice must be submitted to the CO at the completion of the lease term.
7. CUI security incidents. All improper disclosures or receipt of CUI building information must be immediately reported to the CO and the GSA Incident Response Team Center at gsa-ir@gsa.gov. If the contract provides for progress payments, the CO may withhold approval of progress payments until the contractor provides a corrective action plan explaining how the
Document: C101/FEBRUARY 2022 (The Agreement) mailto:gsa-ir@gsa.gov contractor will prevent future improper disclosures of CUI building information. Progress payments may also be withheld for failure to comply with any provision in this clause until the contractor provides a corrective action plan explaining how the contractor will rectify any noncompliance and comply with the clause in the future.
8. Subcontracts. The contractor and subcontractors must insert the substance of this clause in all subcontracts.
[End of clause]
III.I. Non-Compliance with Contract Requirements
In the event the Contractor, after receiving written notice from the Contracting Officer of non-compliance with any requirement of this Contract, fails to initiate promptly such action as may be appropriate to comply with the specified requirement within a reasonable period of time, the Contracting Officer shall have the right to order the Contractor to stop any or all work under the Contract until the Contractor has complied or has initiated such action as may be appropriate to comply within a reasonable period of time. The Contractor will not be entitled to any extension of Contract time or payment for any costs incurred as a result of being ordered to stop work for such cause.
III.J. Safeguarding Sensitive Data and Information Technology Resources In accordance with FAR 39.105, this section is included in the contract. This section applies to all users of sensitive data and information technology (IT) resources, including awardees, contractors, subcontractors, lessors, suppliers and manufacturers. The following GSA policies must be followed.
These policies can be found at Directives Library.
1. CIO P 2100.1K GSA Information Technology (IT) Security Policy
2. CIO P 2100.2B GSA Wireless Local Area Network (LAN) Security
3. CIO 2100.3C Mandatory Information Technology (IT) Security Training Requirement for
Agency and Contractor Employees with Significant Security Responsibilities
4. CIO 2104.1A CIO CHGE 1 GSA Information Technology IT General Rules of Behavior
5. CIO 2105.1 C CHGE 1 GSA Section 508: Managing Electronic and Information
Technology for Individuals with Disabilities
6. CIO 2106.1 GSA Social Media Policy
7. CIO 2107.1 Implementation of the Online Resource Reservation Software
8. CIO 2160.4A Provisioning of Information Technology (IT) Devices
9. CIO 2162.1 Digital Signatures
10. CIO P 2165.2 GSA Telecommunications Policy
11. CIO P 2180.1 GSA Rules of Behavior for Handling Personally Identifiable Information
(Pll)
12. CIO 2182.2 Mandatory Use of Personal Identity Verification (PIV) Credentials
13. CIO P 1878.2A Conducting Privacy Impact Assessments (PIAs) in GSA
14. CIO IL-13-01 Mobile Devices and Applications
15. CIO 2102 Information Technology (IT) Integration Policy
16. HCO 9297.1 GSA Data Release Policy
17. HCO 9297.2B GSA Information Breach Notification Policy
18. ADM P 9732.1 D Suitability and Personnel Security
The contractor and subcontractors must insert the substance of this section in all subcontracts.
Document: C101/FEBRUARY 2022 (The Agreement) https://www.gsa.gov/directives-library
III.K. Allowances
Refer to the drawings and specifications for all Allowances required.
III.L. Equal Employment Opportunity Plan
(1) Within 30 days following award, the Contractor shall furnish the Contracting Officer with an EEO Compliance Plan. The plan shall include the following:
(a) Name of contractor’s EEO Manager for the contract and point of contact information. The EEO Manager is responsible for:
(i) Monitor all employment-related activity to ensure that the Contractor’s equal employment policy is being carried out;
(ii) Submit reports as may be required by the Government; and
(iii) Keep records that shall at least include for each employee the name, address, telephone number, construction trade, union affiliation (if any), employee identification number, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, separate records are not required to be maintained.
(a) Address how the contractor intends to include the EEO provisions of the contract in all subcontracts in excess of $10,000.
(b) Address what type of efforts will be used to ensure equal employment opportunity in accordance with FAR 52.222-27 Affirmative Action Compliance Requirements for Construction. Discuss organized meeting with subcontractors, labor organizations and/or other community stakeholders. Meetings should focus on increased employment opportunities, perceived problems and working to achieve the goals established. DOL representatives are available to participate in such meetings.
(2) During the performance of this contract, the Contractor shall submit to the Contracting Officer semi-annually an EEO Compliance Report containing the following:
(a) List of awarded subcontractors by trade, date of award and amount of subcontract. If subcontract is in excess of $10,000, date the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor was notified of award.
(b) Narrative of actions taken to comply with the affirmative action procedures in paragraphs (g)(1) through (g)(16) of FAR 52.222-27.
(c) List participation in any voluntary associations that may assist in fulfilling the contractor’s affirmative action obligations.
Semi-annual reports are due on the 30th calendar day (or next business day) following the March 31st and September 30th.
Document: C101/FEBRUARY 2022
IV. Contract Clauses
IV.A. Clauses Incorporated in Full Text
(1) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at BioPreferred.
(c) In the performance of this contract, the Contractor shall—
(1) Report to System Award Management, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
(2) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08)
(a) Definitions. As used in this clause—
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this Contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
Document: C101/FEBRUARY 2022 (The Agreement) http://www.biopreferred.gov/ http://www.sam.gov/
(2) Submit this estimate to the Contracting Officer.
(3) GSAR 552.204-9 Personal Identity Verification Requirements (JUL 2021)
(a) The contractor shall comply with GSA personal identity verification requirements, identified in the CIO P 2181.1 GSA HSPD–12 Personal Identity Verification and Credentialing Handbook, if contractor employees require access to GSA controlled facilities or information systems to perform contract requirements. The contractor can find the CIO policy and additional information at http://www.gsa.gov/hspd12.
(b) The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have access to a GSA-controlled facility or access to a GSA-controlled information system.
(4) GSAR 552.252-6 Authorized Deviations in Clauses (Deviation FAR 52.252-6) (SEP 99)
(a) Deviations to FAR clauses.
(1) This solicitation or contract indicates any authorized deviation to a Federal Acquisition Regulation (48 CFR Chapter 1) clause by the addition of “(DEVIATION)” after the date of the clause, if the clause is not published in the General Services Administration Acquisition Regulation (48 CFR Chapter 5).
(2) This solicitation indicates any authorized deviation to a Federal Acquisition Regulation (FAR) clause that is published in the General Services Administration Acquisition Regulation by the addition of “(DEVIATION (FAR clause no.))” after the date of the clause.
(b) Deviations to GSAR clauses. This solicitation indicates any authorized deviation to a General Services Administration Acquisition Regulation clause by the addition of “(DEVIATION)” after the date of the clause.
(c) “Substantially the same as” clauses. Changes in wording of clauses prescribed for use on a “substantially the same as” basis are not considered deviations.
5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .