26 00 02 - UNIT PRICES.pdf
PDF 85 KB Posted
- Attached to
- GC Services for the Tenant Fit Out Project at the Jacob K. Javits Federal Building, New York, NY
- Solicitation number
- 47PC0322R0007
About this file
This document provides unit pricing details for electrical work on a federal construction project. It outlines hourly labor rates and unit costs for various materials including conductors, raceways, panelboards, circuit breakers, fuses, disconnects, wiring devices, and fire alarm system components. Pricing is requested for different conductor and raceway sizes, numbers of circuits for panelboards, amperages for circuit breakers and fuses, and types of wiring devices and fire alarm equipment. Submission of the completed unit pricing form is required with bids for the federal tenant fit out project solicited by the General Services Administration for space in the Jacob K. Javits Federal Building in New York, NY.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPERTY OF UNITED STATES GOVERNMENT -
FOR OFFICIAL USE ONLY
ISSUE FOR
ADDENDUM #2
UNIT PRICES 260002 - 1
06/24/2022
SECTION 260002
UNIT PRICES
PART 1 - GENERAL
1.1 DESCRIPTION
A. Provide electrical unit prices in accordance with the Contract Documents.
1.2 WORK INCLUDED
A. Provide costs as indicated herein for changing quantities of work items from those indicated in the Contract Documents. Include labor, materials, equipment and services, overhead, profit, insurance and other incidental expenses to cover the finished work specified.
B. Identify such costs listed herein on the Contract Bid Form.
C. The standards set forth in the related sections of these specifications form the standard for the work specified herein.
D. This form shall be completed and submitted at the time of bid.
1.3 COST GUARANTEE
A. Any additional work not called for under this Contract will be performed at any time and any quantity as directed by the Architect/Engineer at the unit prices set forth below.
Such work will be performed upon request at any time until final acceptance of all work under this Contract. All such additional work will be performed in accordance with the terms and conditions of this Contract. In the event that work is eliminated from this Contract, the Owner will be credited with the cost of said eliminated work at the unit prices set forth below.
PART 2 - PRODUCTS
2.1 UNIT COSTS
A. Hourly Labor Rates
1. Per hour labor rates including overhead, profit and supervision for each staff member $___________.
B. Conductors
1. Furnished and installed costs per 100 linear feet of conductors in specified raceway.
UNIT PRICES 260002 - 2
06/24/2022
a. 600 volt copper conductors.
Conductor Sizes
Type THWN
No. 12 $_________
No. 10 $_________
No. 8 $_________
No. 6 $_________
No. 4 $_________
No. 3 $_________
No. 2 $_________
No. 1 $_________
No. 1/0 $_________
No. 2/0 $_________
No. 3/0 $_________
No. 4/0 $_________
No. 250 MCM $_________
No. 300 MCM $_________
No. 350 MCM $_________
No. 400 MCM $_________
No. 500 MCM $_________
C. Raceways
1. Costs per 100 linear feet of raceways furnished and installed with hangers, coupling, junction boxes, connectors, etc.
Raceway Sizes
EMT
3/4" $______
1" $______
1-1/4" $______
1-1/2" $______
2" $______
2-1/2" $______
3" $______
UNIT PRICES 260002 - 3
06/24/2022
Raceway Sizes
EMT
3-1/2" $______ $______ $______
4" $______ $______ $______
2. Furnished and installed costs per 100 linear feet of specified wireways installed.
Sizes
2½" x 2½" $__________
4" x 4" $__________
6" x 6" $__________
8" x 8" $__________
12" x 12" $__________
D. Panelboards
1. Furnish and Install Branch Circuit Panelboard, 480Y/277 volt, 3 phase, 4 wire, 22KAIC, 100% neutral bus, ground bus, complete with a full complement of 1, 2 and/or 3 pole branch circuit breakers.
Circuit Quantities
100A MLO 100A MCB 225A MLO 225A MCB
12 $______ $______ $______ $______
18 $______ $______ $______ $______
24 $______ $______ $______ $______
30 $______ $______ $______ $______
36 $______ $______ $______ $______
42 $______ $______ $______ $______
66 $______ $______ $______ $______
84 $______ $______ $______ $______
2. Furnish and install Branch Circuit Panelboard, 208Y/120 volt, 3 phase, 4 wire, 22KAIC, 100% neutral bus, ground bus, complete with a full complement of 1, 2 and/or 3 pole branch circuit breakers.
Circuit Quantities
100A MLO 100A MCB 225A MLO 225A MCB
12 $______ $______ $______ $______
UNIT PRICES 260002 - 4
06/24/2022
Circuit Quantities
100A MLO 100A MCB 225A MLO 225A MCB
18 $______ $______ $______ $______
24 $______ $______ $______ $______
30 $______ $______ $______ $______
36 $______ $______ $______ $______
42 $______ $______ $______ $______
66 $______ $______ $______ $______
84 $______ $______ $______ $______
3. Circuit Breakers
a. Furnished and installed costs of bolt-on circuit breakers installed within a 208Y/120 volt, 3 phase, 4 wire panelboard, as specified.
C/B Trip Ampacity & Poles
1/P 20A $___________
1/P 25A $___________
1/P 30A $___________
1/P 40A $___________
1/P 50A $___________
1/P 60A $___________
2/P 20A $___________
2/P 30A $___________
2/P 40A $___________
2/P 50A $___________
2/P 60A $___________
2/P 70A $___________
2/P 100A $___________
3/P 20A $___________
3/P 30A $___________
3/P 40A $___________
3/P 50A $___________
3/P 60A $___________
UNIT PRICES 260002 - 5
06/24/2022
3/P 70A $___________
3/P 100A $___________
3/P 125A $___________
3/P 150A $___________
3/P 175A $___________
3/P 200A $___________
3/P 225A $___________
3/P 250A $___________
3/P 300A $___________
3/P 400A $___________
b. Furnished and installed costs of bolt-on circuit breakers installed within a 480Y/277 volt, 3 phase, 4 wire panelboard as specified.
1/P 20A $___________
1/P 25A $___________
1/P 30A $___________
1/P 40A $___________
1/P 50A $___________
1/P 60A $___________
2/P 20A $___________
2/P 30A $___________
2/P 40A $___________
2/P 50A $___________
2/P 60A $___________
2/P 70A $___________
2/P 100A $___________
3/P 20A $___________
3/P 30A $___________
3/P 40A $___________
UNIT PRICES 260002 - 6
06/24/2022
3/P 50A $___________
3/P 60A $___________
3/P 70A $___________
3/P 100A $___________
3/P 125A $___________
3/P 150A $___________
3/P 175A $___________
3/P 200A $___________
3/P 225A $___________
3/P 300A $___________
3/P 400A $___________
E. Rejection Fuses
1. Furnished and installed costs of one (1) set of specified rejection fuses.
Fuse Sizes
Bussmann Type
FRS-R
Bussmann Type
FRN-R
Bussmann Type
LPS-RK
Bussmann Type
LPN-RK
Bussmann Type
KTS-R
Bussmann Type
KTN-R
15A $_______ $_______ $_______ $_______ $_______ $_______
20A $_______ $_______ $_______ $_______ $_______ $_______
30A $_______ $_______ $_______ $_______ $_______ $_______
40A $_______ $_______ $_______ $_______ $_______ $_______
50A $_______ $_______ $_______ $_______ $_______ $_______
60A $_______ $_______ $_______ $_______ $_______ $_______
70A $_______ $_______ $_______ $_______ $_______ $_______
80A $_______ $_______ $_______ $_______ $_______ $_______
90A $_______ $_______ $_______ $_______ $_______ $_______
100A $_______ $_______ $_______ $_______ $_______ $_______
110A $_______ $_______ $_______ $_______ $_______ $_______
125A $_______ $_______ $_______ $_______ $_______ $_______
150A $_______ $_______ $_______ $_______ $_______ $_______
175A $_______ $_______ $_______ $_______ $_______ $_______
UNIT PRICES 260002 - 7
06/24/2022
Fuse Sizes
Bussmann Type
FRS-R
Bussmann Type
FRN-R
Bussmann Type
LPS-RK
Bussmann Type
LPN-RK
Bussmann Type
KTS-R
Bussmann Type
KTN-R
200A $_______ $_______ $_______ $_______ $_______ $_______
225A $_______ $_______ $_______ $_______ $_______ $_______
250A $_______ $_______ $_______ $_______ $_______ $_______
300A $_______ $_______ $_______ $_______ $_______ $_______
350A $_______ $_______ $_______ $_______ $_______ $_______
400A $_______ $_______ $_______ $_______ $_______ $_______
600A $_______ $_______ $_______ $_______ $_______ $_______
601A $_______ $_______ $_______ $_______ $_______ $_______
F. Disconnecting Means
1. Furnished and installed costs of specified heavy duty, 3 phase, 600 volts disconnect switches.
Sizes Unfused
NEMA 1
Fused
NEMA 1
Unfused
NEMA 3R
Fused
NEMA 3R
30A $_______ $_______ $_______ $_______
60A $_______ $_______ $_______ $_______
100A $_______ $_______ $_______ $_______
200A $_______ $_______ $_______ $_______
400A $_______ $_______ $_______ $_______
600A $_______ $_______ $_______ $_______
800A $_______ $_______ $_______ $_______
1200A $_______ $_______ $_______ $_______
1600A $_______ $_______ $_______ $_______
2000A $_______ $_______ $_______ $_______
G. Wiring Devices
1. Furnished and installed costs of specified wiring devices with outlet box wiring connections and faceplate.
Items
Momentary Contact Switch $_______
1P - Switch $_______
UNIT PRICES 260002 - 8
06/24/2022
Items
2P - Switch $_______
3 Way Switch $_______
4 Way Switch $_______
20A 120V duplex receptacle $_______
20A 120V duplex GFCI receptacle $_______
20A 120V duplex receptacle with USB $_______
20A 208V simplex receptacle $_______
Occupancy/Vacancy Sensor (Wall) $_______
Occupancy/Vacancy Sensor (Ceiling) $_______
Daylighting Control Sensor (Wall) $_______
Daylighting Control Sensor (Ceiling) $_______
Sensor Power Packs $_______
Dimmer Switch (Each Type Used on the Project) $_______
H.D. Fire Alarm System
1. Furnished and installed cost of specified equipment (include 200 feet of cabling and conduit back to DGP)
Flush Mounted Fire Speaker $________
Flush Mounted Fire Speaker with Visual Alarm $________
Surface Mounted Fire Speaker $________
Surface Mounted Fire Speaker with Visual Alarm $________
Smoke Detector $________
Heat Detector $________
Carbon Monoxide Detector $________
Flush Mounted Visual Alarm $________
Surface Mounted Visual Alarm $________
Fan Shutdown $________
Addressable Monitoring Module $________
Addressable Control Module $________
Duct Mounted Type Smoke Detector $________
Detector Remote Annunciator Light $________
Duct Detector Remote Lamp & Test Station $________
UNIT PRICES 260002 - 9
06/24/2022
Firefighters' Phone Set $________
Firefighters' Phone Jack $________
Warden Station $________
Connect Water Flow Switch $________
Connect Tamper Switch $________
PART 3 - EXECUTION
3.1 Perform the work in accordance with the Contract Documents.
END OF SECTION