Amendment Two.pdf

PDF 96 KB Posted

Attached to
Grizzly Creek Restroom Replacement Federal contract opportunity
Solicitation number
AG-9JNE-S-10-0009
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Amendment Two

View the file

Other files for this federal contract opportunity

Other files attached to Grizzly Creek Restroom Replacement, newest first.
File Type Posted
Amendment Five.pdf PDF
Amendment Five Revised Specs_060310.pdf PDF
Amendment Four.pdf PDF
Combined Amendment 3.pdf PDF
Amendment One.pdf PDF
Return Package.pdf PDF
C1.12009 Grizzly RR EXISTING RR.pdf PDF
Wage Determination 04-12-10.pdf PDF
P1.0 E1.0 Plumbing and Electrical.pdf PDF
C2.1 2009 Grizzly RR REPLACEMENT RR 4.pdf PDF
Specifications.pdf PDF
C3.0 Accble-Hyd-Layout1.pdf PDF
T2.0 2009 Grizzly RR -Location Map.pdf PDF
T1.0 2009 Grizzly RR-COVER PAGE.pdf PDF
S1.0 TO 2.3 STRUCTURALS.pdf PDF
C2.0 2009 Grizzly RR REPLACEMENT 1.pdf PDF
C1.0 2009 Grizzly RR SITEPLAN.pdf PDF
Fire Plan_0809_BkRD.pdf PDF
Solicitation.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page of Pages 1 3

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No.

Two 05/14/2010

6. Issued By: Code 7. Administered By: Code USDA Forest Service Sierra Cascade Province, Acquisition Group 2550 Riverside Drive Susanville, CA 96130

See Block 6

8. Name and Address of Contractor (X) 9A. Amendment of Solicitation No.

AG-9JNE-S-10-0009

9B. Dated (See Item 11)

4/16/2010 10A. Modification of Contract No.

10B. Date Issued (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE

CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract

Order No. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _1__ copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment to the Solicitation for Grizzly Campground Restroom Replacement.

Attached are two more questions and answers from that meeting.

The receipt of Offers is extended to May 21, 2010 COB.

Please replace the Schedule of Items with the Revised Schedule of Items.

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer 16A. Name and Title of Contracting Officer

15B. Contractor/Offeror Date Signed 16B. United States of America Date Signed

(Authorized Signature) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV.10-83)

PRESCRIBED BY GSA

FAR (48CFR) 53.243

Name of Offeror or Contractor Amendment No. Two

ITEM NO. DESCRPITION METHOD

OF

MEASURE

QUANTITY PAY UNIT UNIT PRICE TOTAL

SCHEDULE OF ITEMS

01010 RESTROOM BUILDING (Incl. plumbing and Elec.) CQ 2 EA $ _______ $_______

1505 MOBILIZATION LSQ ALL LS xxxxxx $_______

SELECTIVE DEMOLITION

02070 REMOVAL OF EXISTING UTILITIES LSQ ALL LS xxxxxx $_______

CLEARING AND GRUBBING

02110B BUILDING AND WALKWAY LSQ ALL LS xxxxxx $_______

UTILITY TRENCH AND BACKFILL

ELECTRICAL CQ 30 LF $_______ $_______

WATER CQ 30 LF $_______ $_______

AGGREGATE BASE

2223 ACCESS ROAD AND PARKING AREA CQ 1,000 SF $_______ $_______

ROCK MATERIAL

02271 TRAFFIC ROCK BARRIERS (I TON) CQ 20 EA $_______ $_______

2553 ASPHALT CONCRETE PAVEMENT CQ 15 TON $_______ $_______

ACCESS ROAD AND PARKING AREA

CONCRETE

3300 BUILDING SLAB CQ 1,664 SF $_______ $_______

03300B UTILITY BOXES CQ 8 EA $_______ $_______

WATER SYSTEM

13208A WATER LINE REPLACEMENT CQ 30 LS $_______ $_______

ACCESSIBLE HYDRANT INSTALLATION CQ 2 EA $_______ $_______

LIGHTING AND ELECTRICAL

16050 SITE ELECTRICAL (Service to Restroom) LSQ ALL LS xxxxxx $_______

TOTAL ALL ITEMS

Grizzly Campground Restroom Replacement Amendment Two

How many boulders are needed for this job?

The schedule of Items shows 20 EA under the boulders. There will only be two boulders per rest-room (a total of four boulders) to be furnished and installed by the contractor as per the drawings and specifications. Revised schedule of items is attached.

How will the government pay for quality control testing?

The specifications state that the contractor is responsible for materials testing and compaction testing as per the specifications. The quality control is incidental to it's respective item. For example compaction testing for the base and sub base are incidental to 02220 - Earth Work and the compression testing for concrete shall be incidental to 03300 - Concrete.

Modification Amendment sf-30 #2
Modification 2
Sheet1

Questions Amendment 2