Amendment One.pdf
PDF 116 KB Posted
- Attached to
- Grizzly Creek Restroom Replacement Federal contract opportunity
- Solicitation number
- AG-9JNE-S-10-0009
About this file
Amendment One
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment Five.pdf | ||
| Amendment Five Revised Specs_060310.pdf | ||
| Amendment Four.pdf | ||
| Combined Amendment 3.pdf | ||
| Amendment Two.pdf | ||
| Return Package.pdf | ||
| C1.12009 Grizzly RR EXISTING RR.pdf | ||
| Wage Determination 04-12-10.pdf | ||
| P1.0 E1.0 Plumbing and Electrical.pdf | ||
| C2.1 2009 Grizzly RR REPLACEMENT RR 4.pdf | ||
| Specifications.pdf | ||
| C3.0 Accble-Hyd-Layout1.pdf | ||
| T2.0 2009 Grizzly RR -Location Map.pdf | ||
| T1.0 2009 Grizzly RR-COVER PAGE.pdf | ||
| S1.0 TO 2.3 STRUCTURALS.pdf | ||
| C2.0 2009 Grizzly RR REPLACEMENT 1.pdf | ||
| C1.0 2009 Grizzly RR SITEPLAN.pdf | ||
| Fire Plan_0809_BkRD.pdf | ||
| Solicitation.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page of Pages 1 4
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No.
One 5/11/2010
6. Issued By: Code 7. Administered By: Code USDA Forest Service Sierra Cascade Province, Acquisition Group 2550 Riverside Drive Susanville, CA 96130
See Block 6
8. Name and Address of Contractor (X) 9A. Amendment of Solicitation No.
AG-9JNE-S-10-0009
9B. Dated (See Item 11)
4/16/2010 10A. Modification of Contract No.
10B. Date Issued (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ______ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE
CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the Contract
Order No. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _1__ copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment to the Solicitation for Grizzly Campground Restroom Replacement to document May 10, 2010 Pre Bid Meeting.
Attached are Questions and Answers from that meeting and list of interested offerors attending the meeting.
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer 16A. Name and Title of Contracting Officer
15B. Contractor/Offeror Date Signed 16B. United States of America Date Signed
(Authorized Signature) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV.10-83)
PRESCRIBED BY GSA
FAR (48CFR) 53.243
Amendment One
Grizzly Campground RR – Pre Bid Meeting Notes 5/10/10
1) Question: In what order can the rest rooms be closed? Can the restrooms be built simultaneously?
Answer: Both restrooms will be demolished by the government prior to the contractor starting work.
However, the corresponding loops will be closed one at a time, therefore the construction may not occur simultaneously.
If the campground is not being used by any campers, the Contracting Officer may make some exceptions.
2) Question: Who will do the demolition?
Answer: The government will perform the demolition prior to start work.
3) Question: Is there insulation?
Answer: This is still being researched. The answer will be posted as soon as the government makes a decision. Unless otherwise advised, submit offers based on the drawings and specifications included with the solicitation
4) Question: What is the interior finish?
Answer: According to drawing S2.1 the interior finish is Hardiepanel® with Azek® trim. The contractor may propose an approved equal material.
5) Question: Will there be any backing behind the interior paneling for lateral support?
Answer: Specification 07466 as it relates to the hardipanel and hardiplank “Install siding in strict accordance with the manufacturer’s installation instructions.”
The government will post a more specific answer as soon as a final decision has been made.
6) Question: Will concrete compression tests be required?
Answer: As per specification 03300 the contractor shall:
“Provide test reports and mill certificates and other technical data showing cement provided meets the requirements AS SHOWN ON THE DRAWINGS and herein specified.”
And:
3.4 - QUALITY CONTROL
The concrete at the Contracting Officer’s discretion may be sampled and tested as follows:
A. ASTM C172 “Method of Sampling Fresh Concrete” B. ASTM C143 “Slump” C. ASTM C231 “Air Content” D. ASTM C39 “Cylinders-Compression Test”
7)
8) Question: Is compaction of base required?
Answer: Yes. It is the responsibility of the contractor to provide soil density tests and meet the requirements as specified in specification 02200 and on drawing S1.0 Foundation Notes #10.
9) Question: Will contractor have use of utilities?
Answer: Yes, the contractor will have access to water and power. All proper precautions must be met to ensure that electrical connections are safe and integrity of water system is maintained.
10) Question: What/where is control point?
Answer: There is a control point (assumed coordinates of 0,0,0) for each restroom. These points are labeled on pages C2.0 and C2.1.
11) Question: What is the slope of access path?
Answer: The path shall have a maximum slope of 5% and a maximum cross-slope of 2%.
Grizzly Campground RR – Pre Bid Meeting Attendees 5/10/10
Company Attendee Phone Email Howard Construction Kyle V Howard 530-258-3541 KVH@frontiernet.net
REM Construction Bill Timmons 530-876-1363 marie-rem@sbcglobal.net
Hat Creek Construction Nate Palmer 530-335-5501 nate@hatcreekconstrucion.com
Cook Construction Wes Cook 530-949-5813 cookconst@att.net mailto:KVH@frontiernet.net� mailto:marie-rem@sbcglobal.net� mailto:nate@hatcreekconstrucion.com� mailto:cookconst@att.net�
File details come from the government source that posted it. Updated .