Hilo-E-Section_J-2__Davis_Bacon_Wage_rates_electrical_Installation.docx
DOCX document 15 KB Posted
- Solicitation number
- AG-9AD6-S-13-0003
About this file
Davis Bacon Act Wage Decision
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hilo-E-_notes_and_clarification.docx | DOCX document | |
| Hilo-E-Section_G-GFP.pdf | ||
| Hilo-E-Part_III_Section_J_Electrical_Installation_Coversheet.docx | DOCX document | |
| Hilo-E-SF_1442 1 .pdf | ||
| Hilo-E-Section_J-3__electrical_Installaltion_drawings.pdf | ||
| Hilo-E-SECTION_L_doc_electrical_installation.docx | DOCX document | |
| Hilo-E-SECTION_M_electrical_installation.docx | DOCX document | |
| Hilo-E-PART_IV_doc_Section_K_Electrical_Installationr.docx | DOCX document | |
| Hilo-E-SECTION_H_electrical_installation.docx | DOCX document | |
| Hilo-E-Section_C__Electrical_Specs.docx | DOCX document | |
| Hilo-E-SECTION_G_Electrical_Installation.docx | DOCX document | |
| Hilo-E-SECTION_F_electrical_installation.docx | DOCX document | |
| Hilo-E-Section_B_Electrical_Installation.pdf | ||
| Hilo-E-Part_II_Section_I_electrical_Installation.docx | DOCX document | |
| Hilo-E-Section_J-1_-_Definition_of_Bids_Electrical_Installation.pdf | ||
| Hilo-E-SECTION_E_electrical_installation.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: HI130001 05/24/2013 HI1
Superseded General Decision Number: HI20120001
State: Hawaii
Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential
Counties: Hawaii Statewide.
BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION
PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS AND DREDGING
Modification Number Publication Date 0 01/04/2013 1 01/11/2013 2 02/15/2013 3 03/15/2013 4 03/29/2013 5 04/05/2013 6 04/19/2013 7 05/17/2013 8 05/24/2013
ELEC1186-001 02/17/2013
Rates Fringes
Electricians:
Cable Splicers..............$ 45.27 26.40 Electricians................$ 41.15 25.14 Telecommunication worker....$ 23.20 17%+6.35
ELEC1186-002 02/17/2013
Rates Fringes
Line Construction:
Cable Splicers..............$ 45.27 26.40 Groundmen/Truck Drivers.....$ 30.86 21.99 Heavy Equipment Operators...$ 37.04 23.88 Linemen.....................$ 41.15 25.14 Telecommunication worker....$ 23.20 17%+$6.35
LABO0368-001 09/03/2012
Rates Fringes
Laborers:
Driller.....................$ 32.30 15.96 Final Clean Up..............$ 22.70 11.67 Gunite Operator & High Scaler......................$ 31.80 15.96 Laborer I...................$ 31.30 15.96 Laborer II..................$ 28.70 15.96 Powderman...................$ 32.30 15.96 Window Washer (bosun chair).$ 30.80 15.96
Power equipment operators:
GROUP 1....................$ 35.94 26.76
GROUP 2....................$ 36.05 26.76
GROUP 3....................$ 36.22 26.76
GROUP 4....................$ 36.49 26.76
GROUP 5....................$ 36.80 26.76
GROUP 6....................$ 37.45 26.76
GROUP 7....................$ 37.77 26.76
GROUP 8....................$ 37.88 26.76
GROUP 9....................$ 37.99 26.76
GROUP 9A...................$ 38.22 26.76
GROUP 10....................$ 38.28 26.76
GROUP 10A...................$ 38.43 26.76
GROUP 11....................$ 38.58 26.76
GROUP 12....................$ 38.94 26.76
GROUP 12A...................$ 39.30 26.76
GROUP 13....................$ 36.22 26.76
GROUP 13A...................$ 36.49 26.76
GROUP 13B...................$ 36.80 26.76
GROUP 13C...................$ 37.45 26.76
GROUP 13D...................$ 37.77 26.76
GROUP 13E...................$ 37.88 26.76
File details come from the government source that posted it. Updated .