Hilo-E-Section_C__Electrical_Specs.docx
DOCX document 16 KB Posted
- Solicitation number
- AG-9AD6-S-13-0003
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hilo-E-_notes_and_clarification.docx | DOCX document | |
| Hilo-E-Section_G-GFP.pdf | ||
| Hilo-E-Part_III_Section_J_Electrical_Installation_Coversheet.docx | DOCX document | |
| Hilo-E-SF_1442 1 .pdf | ||
| Hilo-E-Section_J-3__electrical_Installaltion_drawings.pdf | ||
| Hilo-E-Section_J-2__Davis_Bacon_Wage_rates_electrical_Installation.docx | DOCX document | |
| Hilo-E-SECTION_L_doc_electrical_installation.docx | DOCX document | |
| Hilo-E-SECTION_M_electrical_installation.docx | DOCX document | |
| Hilo-E-PART_IV_doc_Section_K_Electrical_Installationr.docx | DOCX document | |
| Hilo-E-SECTION_H_electrical_installation.docx | DOCX document | |
| Hilo-E-SECTION_G_Electrical_Installation.docx | DOCX document | |
| Hilo-E-SECTION_F_electrical_installation.docx | DOCX document | |
| Hilo-E-Section_B_Electrical_Installation.pdf | ||
| Hilo-E-Part_II_Section_I_electrical_Installation.docx | DOCX document | |
| Hilo-E-Section_J-1_-_Definition_of_Bids_Electrical_Installation.pdf | ||
| Hilo-E-SECTION_E_electrical_installation.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C- DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
FOR
ELECTRICAL INSTALLATION
Statement of Work/Specification (AGAR 452.211-72)(FEB 1988) The contractor shall furnish the necessary personnel, material, equipment, services facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J for the Definition of Bid Items and Drawings.
Description of Work The work shall include, but not be limited to the installation of approximately 2,800 linear feet of various conduits, 2500 linear feet of service line conductors, 1350 linear feet of control conductors, 4 pull/splice concrete vaults for electrical, 5 pull/splice concrete communication box, various junction boxes, fused disconnects, service connections, and installation of a solar panel and pumping system. Install approximately 1195 linear feet of pull rope in the 2”conduit runs and pull/splice boxes. Pull ropes shall terminate at the Warehouse Building and run to each of the other buildings (Main House, the Cabin, and the Round House) as shown on the drawings. The pull rope shall be incidental to the conduit and have an additional 20 linear feet stored in each box for future connection to buildings.
The project will require electrical expertise to complete functional electrical service systems to several buildings and residences according to all state and local codes. Materials will include all items, tools, equipment, and fittings as needed; complete continuity testing of all services prior to backfill. The contractor shall construct the electrical system to be a complete and functional system prior to final payment. The contractor shall be a current and valid professional licensed electrician for the State of Hawaii. There will be extensive coordination with other contractor’s work and connection of systems for functionality.