Hilo-E-SECTION_H_electrical_installation.docx
DOCX document 18 KB Posted
- Solicitation number
- AG-9AD6-S-13-0003
About this file
Special Contract Data
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hilo-E-_notes_and_clarification.docx | DOCX document | |
| Hilo-E-Section_G-GFP.pdf | ||
| Hilo-E-Part_III_Section_J_Electrical_Installation_Coversheet.docx | DOCX document | |
| Hilo-E-SF_1442 1 .pdf | ||
| Hilo-E-Section_J-3__electrical_Installaltion_drawings.pdf | ||
| Hilo-E-Section_J-2__Davis_Bacon_Wage_rates_electrical_Installation.docx | DOCX document | |
| Hilo-E-SECTION_L_doc_electrical_installation.docx | DOCX document | |
| Hilo-E-SECTION_M_electrical_installation.docx | DOCX document | |
| Hilo-E-PART_IV_doc_Section_K_Electrical_Installationr.docx | DOCX document | |
| Hilo-E-Section_C__Electrical_Specs.docx | DOCX document | |
| Hilo-E-SECTION_G_Electrical_Installation.docx | DOCX document | |
| Hilo-E-SECTION_F_electrical_installation.docx | DOCX document | |
| Hilo-E-Section_B_Electrical_Installation.pdf | ||
| Hilo-E-Part_II_Section_I_electrical_Installation.docx | DOCX document | |
| Hilo-E-Section_J-1_-_Definition_of_Bids_Electrical_Installation.pdf | ||
| Hilo-E-SECTION_E_electrical_installation.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION H – SPECIAL CONTRACT REQUIREMENTS
COR: Indicate any other special conditions, site restrictions, or use limitations on this project including, but not limited to, the following:
The contractor is responsible for the protection of all the work during weather events until final acceptance of the project. Coordination of the work with other contractors is critical to the success of the project.
Physical Data (far 52.236-4)(Apr 1984) Will physical data be made available to offerors?
Yes ____ No__X__ If yes, the following clause will be included and COR must complete.
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by __________ [insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probings, test tunnels].
(b) Weather conditions __________ [insert a summary of weather records and warnings].
(c) Transportation facilities _________ [insert a summary of transportation facilities providing access from the site, including information about their availability and limitations].
(d) ___________ [insert other pertinent information].
File details come from the government source that posted it. Updated .