6Site_Visit_Notes.pdf

PDF 277 KB Posted

Attached to
Callahan North Residence Remodel Federal contract opportunity
Solicitation number
AG-9AC7-S-15-0104
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

06 Site Visit Notes

View the file

Other files for this federal contract opportunity

Other files attached to Callahan North Residence Remodel, newest first.
File Type Posted
1Summary_of_changes_for_Amendment_2.pdf PDF
2Revised_Section_C_for_Amendment_1.pdf PDF
5_attach__4SF24_Bid_Bond.pdf PDF
4attach_2Plans_Rev_01_0615.pdf PDF
3attach_1SpecialProject_Specs_A2.pdf PDF
Amendment2_SF30.pdf PDF
Amendment_001_AG-9AC7-S-15-0104-signed.pdf PDF
General_Decision_Number.pdf PDF
PLANS-CALLAHAN-NORTH-REMODEL.pdf PDF
Callahan_North_Project_Specsrevised.pdf PDF
AG-9AC7-S-15-0104_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Callahan North Residence Remodel – AG-9AC7-S-15-0104 Site Visit Meeting

5/19/2015 at 10:30 am

Attendees

Government Interested Vendors Marilyn Ladd, Contracting Officer Nik Branson with BNG Finish Products Dave Seiler, Klamath Engineering David McFall with Blitz Construction Kelly Nolan, Klamath Engineering IGM Construction/Allstate Enterprises Andrew Gerdes with Timberworks

The residence was opened up and vendors were free to look throughout the building including the attic.

Some general administrative questions were answered by the Contracting Officer regarding the evaluation factors (see Sections L and M of the solicitation). Vendors were advised to provide specific information and not simply re-state the government’s specifications.

After review of the facility the following areas were discussed.

Flooring – There was a discussion if new sub floor is required. The government decided this needs clarification. Note: See amendment 2.

Utility – Potentially the electrical panel may need to be relocated to a different side of the building to eliminate wiring over the metal roof. Per one of the attendees the local power company has restrictions. Note: See amendment 2.

Drywall – The removal of all the existing electrical and relocation of plumbing will require quite a bit of demolition of drywall on the inside. Note: See amendment 2.

Fireplace – Questions on if the specification requires the fireplace to be checked to verify functionality and to have the chimney cleaned. Note: See amendment 2

Hallway – This is a 7 foot ceiling that may be removed to same height as rest of the building once the duct work is removed. This will ease installation of the attic access ladder in the hallway. Note: See amendment 2

Siding: The old siding is nailed directly to studs. The government may need to change specifications. Note: See amendment 2

Windows: Drawings may need to be clarified as the sizes are not in inches. Note: See amendment 2

Note: Biobased: The Contracting Officer reminded vendors that if a government specified item is covered by biobased procurement preference then any proposed equivalent to the item will also be measured against this standard in determining if it is equivalent..