Summary of changes for Amendment 2:

Addition of 2nd bathroom: The design of the building has been changed to include another bathroom in the building. This change is identified in the revised Summary of Work in the Special Project

Specifications.

Flooring –The revised plans call for removal and replacement of subfloor that is damaged and it is expected to be up to 160 square feet.

Utility Hookup–Notes have been added on plans and specifications contain some clarifying language.

Drywall – Language has been included in the Summary of work to include additional clarification (i.e.

wall corner to wall corner and floor to ceiling).

Fireplace – Some clarification has been added in the Summary of Work.

Hallway – Notes have been added to the plan regarding the hallway ceiling and see specification under

Hallway.

Siding: Additional notes on the plan and clarification in the specifications.

Windows: Size requirements are clarified on the plans.

Blinds: The requirement is changed to 2” fauxwood blinds to include the frosted windows.

Based on the volume of changes the following documents are revised:

Attachment 1 – Special Project Specifications - primary changes are within:

Section 01010 - Summary of Work (pages 2-10)

Section 06100 – Rough Carpentry (pages 22-28 Attachment 2 – Project Maps and Drawings (all 10 pages)