1Summary_of_changes_for_Amendment_2.pdf

PDF 195 KB Posted

Attached to
Callahan North Residence Remodel Federal contract opportunity
Solicitation number
AG-9AC7-S-15-0104
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

01 Summary of Amendment Changes

View the file

Other files for this federal contract opportunity

Other files attached to Callahan North Residence Remodel, newest first.
File Type Posted
2Revised_Section_C_for_Amendment_1.pdf PDF
6Site_Visit_Notes.pdf PDF
5_attach__4SF24_Bid_Bond.pdf PDF
4attach_2Plans_Rev_01_0615.pdf PDF
3attach_1SpecialProject_Specs_A2.pdf PDF
Amendment2_SF30.pdf PDF
Amendment_001_AG-9AC7-S-15-0104-signed.pdf PDF
General_Decision_Number.pdf PDF
PLANS-CALLAHAN-NORTH-REMODEL.pdf PDF
Callahan_North_Project_Specsrevised.pdf PDF
AG-9AC7-S-15-0104_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of changes for Amendment 2:

Addition of 2nd bathroom: The design of the building has been changed to include another bathroom in the building. This change is identified in the revised Summary of Work in the Special Project

Specifications.

Flooring –The revised plans call for removal and replacement of subfloor that is damaged and it is expected to be up to 160 square feet.

Utility Hookup–Notes have been added on plans and specifications contain some clarifying language.

Drywall – Language has been included in the Summary of work to include additional clarification (i.e.

wall corner to wall corner and floor to ceiling).

Fireplace – Some clarification has been added in the Summary of Work.

Hallway – Notes have been added to the plan regarding the hallway ceiling and see specification under

Hallway.

Siding: Additional notes on the plan and clarification in the specifications.

Windows: Size requirements are clarified on the plans.

Blinds: The requirement is changed to 2” fauxwood blinds to include the frosted windows.

Based on the volume of changes the following documents are revised:

Attachment 1 – Special Project Specifications - primary changes are within:

Section 01010 - Summary of Work (pages 2-10)

Section 06100 – Rough Carpentry (pages 22-28 Attachment 2 – Project Maps and Drawings (all 10 pages)