LC_APPENDIX_C_ROADS_Finalb 8_6_10.docx
DOCX document 18 KB Posted
- Attached to
- RECOVERY - LAST CHANCE STEWARDSHIP Federal contract opportunity
- Solicitation number
- AG-9A63-S-10-0033
About this file
Appendix C
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Last Chance Schedule of items_Optional Road Decom.xlsx | XLSX spreadsheet | |
| SF30 Amend 2 Last Chance.doc.docx | DOCX document | |
| Last_Chance_unit_summary.xlsx | XLSX spreadsheet | |
| Last Chance Road Schedules001.pdf | ||
| SF30 Amend 1 Last Chance.doc.docx | DOCX document | |
| LC_APPENDIX_B_TIMBER REMOVAL_Final 8_6_10.docx | DOCX document | |
| Last_Chance_final_contract_map_8_6.pdf | ||
| 01- Last Chance Stewardship Solicitation - AG-9A63-S-10-0033 8_6_10.doc | DOC document | |
| LC_APPENDIX_D_SF1413_Final 8_6_10.docx | DOCX document | |
| ROAD MTC SPECS.DOC | DOC document | |
| LC_APPENDIX_A_WORK ITEMS_Final 8_6_10.docx | DOCX document | |
| Wage Determination sheet.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last Chance Stewardship IRSC Commercial – Solicitation No. AG-9A63-S-10-0033 Page 1 of 1
Appendix C
Road Maintenance Specifications
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary, attached specifications, and drawings:
“Pre-Use and Post-Use” road maintenance requirements are a Mandatory Work Item to be performed by the Contractor. See attached Road Maintenance Table: Appendix A for mandatory work items.
“During-Use” road maintenance requirements will be performed by the Contractor commensurate with use. See Road Maintenance Specifications uploaded seperately.
T-806 (5/83)
File details come from the government source that posted it. Updated .