01- Last Chance Stewardship Solicitation - AG-9A63-S-10-0033 8_6_10.doc
DOC document 592 KB Posted
- Attached to
- RECOVERY - LAST CHANCE STEWARDSHIP
- Solicitation number
- AG-9A63-S-10-0033
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Last Chance Schedule of items_Optional Road Decom.xlsx | XLSX spreadsheet | |
| Last_Chance_unit_summary.xlsx | XLSX spreadsheet | |
| SF30 Amend 2 Last Chance.doc.docx | DOCX document | |
| Last Chance Road Schedules001.pdf | ||
| SF30 Amend 1 Last Chance.doc.docx | DOCX document | |
| ROAD MTC SPECS.DOC | DOC document | |
| LC_APPENDIX_B_TIMBER REMOVAL_Final 8_6_10.docx | DOCX document | |
| LC_APPENDIX_D_SF1413_Final 8_6_10.docx | DOCX document | |
| LC_APPENDIX_C_ROADS_Finalb 8_6_10.docx | DOCX document | |
| Last_Chance_final_contract_map_8_6.pdf | ||
| LC_APPENDIX_A_WORK ITEMS_Final 8_6_10.docx | DOCX document | |
| Wage Determination sheet.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last Chance Stewardship IRSC Commercial – Solicitation No. AG-9A63-S-10-0033 Last Chance Stewardship IRSC Commercial – Solicitation No. AG-9A63-S-10-0033 Page 56 of 67
| SOLICITATION/CONTRACT/ORDER COMMERCIAL ITEMS |
| 1. REQUISITION NUMBER |
| PAGE 1 OF |
| OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| ******** |
| 67 Pages |
| 2. CONTRACT NO. |
| 3. AWARD/EFFECTIVE |
| 4. ORDER NUMBER |
| 5. SOLICITATION NUMBER |
| 6. SOLICIATION ISSUE |
| DATE |
| Last Chance Stewardship Project |
AG-9A63-S-10-0033
DATE
08-06-2010
| 7. FOR SOLICITATION INFORMATION CALL: |
| a. Kevin Lyons and/or Tony Rodarte for all technical information. |
b. MATTHEW GAGNON, CONTRACTING OFFICER FOR ADMINISTRATIVE OR CONTRACTING QUESTIONS
b. TELEPHONE NUMBER(No collect calls)
a. 530-367-2224
b. 530-478-6142
FAX-530-478-6126
8. OFFER DUE DATE
09-02-2010 At 1:00 PM local time
| 9. ISSUED BY CODE |
| 10. THIS ACQUISITON IS |
| 11. DELIVERY FOR |
| 12. DISCOUNT TERMS |
FOB DESTINATION
| USDA FOREST SERVICE |
| FORMCHECKBOX |
UNRESTRICTED
| UNLESS BLOCK IS |
TAHOE NATIONAL FOREST
631 COYOTE STREET
FORMCHECKBOX
SET ASIDE: % FOR
MARKED
NEVADA CITY, CA 95959
VOICE: 530-478-6121
FAX: 530-478-6126
FORMCHECKBOX
SMALL BUSINESS
FORMCHECKBOX
SEE SCHEDULE
FORMCHECKBOX
HUBZONE SMALL
| BUSINESS |
| FORMCHECKBOX |
13a. THIS CONTRACT IS A RATED
ORDER UNDER DPAS (15 CFR 700)
FORMCHECKBOX
8(A) 13b. RATING
| NAICS: 115310 |
| SIZE STANDARD: $7.0 MILLION |
| 14. METHOD OF SOLICITATION |
FORMCHECKBOX
RFQ FORMCHECKBOX
IFB FORMCHECKBOX
RFP
15. DELIVER TO CODE
16. ADMINISTERED BY CODE
See Block 9.
17a. CONTRACTOR/ CODE FACILITY
OFFEROR CODE
18a. PAYMENT WILL BE MADE BY CODE
Block 9.
TELEPHONE N0.
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
| OFFER |
| IS CHECKED |
FORMCHECKBOX
SEE ADDENDUM
| 19. |
| 20. |
| 21. |
| 22. |
| 23. |
| 24. |
| ITEM N0. |
| SCHEDULE OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
SEE FOLLOWING
PAGE
Last Chance Stewardship Project
TAHOE NATIONAL FOREST, AMERICAN RIVER DISTRICT
VENDOR TIN#__________________________
VENDOR DUNS#________________________
(Use Reverse and/or Attach Additional Sheets as Necessary)
SEE FOLLOWING PAGE
| SEE FOLLOWING PAGE |
| SEE FOLLOWING PAGE |
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
| X |
| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA |
| X |
| ARE |
| FORMCHECKBOX |
ARE NOT ATTACHED
| X |
| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |
| X |
| ARE |
| FORMCHECKBOX |
ARE NOT ATTACHED
| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN |
| FORMCHECKBOX |
29. AWARD OF CONTRACT: REF. OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
| DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY |
| DATED .. YOUR OFFER ON SOLICITATION |
| ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. |
| (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE |
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
| 30b. NAME AND TITLE OF SIGNER (Type or print) |
| 30c. DATE SIGNED |
| 31b. NAME OF CONTRACTING OFFICER (Type or print) |
| 31c. DATE SIGNED |
Prescribed by GSA ‑ FAR (48 CFR) 53.212
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED |
CORRECTFOR
| 36. PAYMENT |
| 37. CHECK NUMBER |
|PARTIAL | |FINAL
FORMCHECKBOX
COMPLETE FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
| 41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER |
| FOR PAYMENT |
| 42a. RECEIVED BY (Print) |
| 41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41 c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE RECD (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV.4/2002) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
Amount
Mandatory Work Activity Description (See Appendix A)
| 1 |
| Units 65: small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 84 |
| Acres |
| $ |
| $ |
| 2 |
| Units 66, 66B small tree thinning (mechanized felling, yarding, piling of small trees) |
| 257 |
| Acres |
| $ |
| $ |
| 3 |
| Units 67, 68: small tree thinning (mechanized felling, yarding, piling of small trees) |
| 187 |
| Acres |
| $ |
| $ |
| 4 |
| Units 71, 71B: small tree thinning (mechanized felling, yarding, piling of small trees) |
| 72 |
| Acres |
| $ |
| $ |
| 5 |
| Units 72, 73, 74 small tree thinning (mechanized felling, yarding, piling of small trees) |
| 55 |
| Acres |
| $ |
| $ |
| 6 |
| Units 75, 75B: small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 55 |
| Acres |
| $ |
| $ |
| 7 |
| Units 77, 78, 78B small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 181 |
| Acres |
| $ |
| $ |
| 8 |
| Units 79: small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 105 |
| Acres |
| $ |
| $ |
| 9 |
| Road Maintenance – Total from Attachment: Last Chance Schedule of Items and Appendix C. |
| 32 |
| Miles |
| $ |
| $ |
| 10 |
| Surface replacement costs associated with removal of included timber; Refer to SOW Clause #43 |
| 1 |
| Job |
| xxxxxxxxxx |
| $ |
Total Mandatory
Optional Work Activity Description
(See appendix A)
| 11 |
| Units 133, 134: small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 159 |
| Acres |
| $ |
| $ |
| 12 |
| Unit 135, 136: small tree thinning (mechanized felling, yarding, and piling of small trees) |
| 96 |
| Acres |
| $ |
| $ |
| 13 |
| Unit 66 & 66B Mechanical piling of existing slash and downed logs. |
| 1 |
| Job |
| xxxxxxxxx |
| 14. |
| Road Decommissioning-Total from Attachment |
| 7 |
| Miles |
| 15. |
| Units 69, 70, 76: Skyline unit thinning, yarding of merchantable pieces to landing, and haul to processing facility |
| 216 |
| Acres |
| $ |
| $ |
| 16 |
| Hand Piling of Activity Slash in the first 150 feet from road edge in units 71B, 75B, 78B |
| 1 |
| Job |
| xxxxxxxxxx |
| 17. |
| Water Source Development-Total from Attachment |
| 1 |
| Job |
| xxxxxxxxxx |
Total Optional
Mandatory Work Items
Values of timber products removed to be applied at Flat Rates
SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE TOTAL OFFER
OFFER (FLAT)
TOTAL
OFFER
Combined Softwoods Sawtimber 45641 Green Tons
$1.89 Optional Work Item – Skyline Thinning Values of timber products removed to be applied at Flat Rates
SPECIES
PRODUCT
QUANTITY
UNIT OF MEASURE
MINIMUM ACCEPTABLE TOTAL OFFER
OFFER (FLAT)
TOTAL
OFFER
Combined Softwoods
Sawtimber
Green Tons
$1.89 Timber Subject to Agreement under Appendix B - K-C.1.1# (FIXED RATE) Combined Softwoods Non-sawtimber
UNESTIMATED
Green Tons $0. 10 xxxxxxxxxx xxxxxxx cONTRACT CLAUSES FAR 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders—Commercial Items (Apr 2008)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(2) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub. L. 108-77, 108-78)
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
X (2) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (July 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
X (3) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).
X (4)(i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637(d)(4).
X (ii) Alternate II (Oct 2001) of 52.219-9.
X (5) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).
X (6) 52.219-28, Post Award Small Business Program Representation (Jun 2007)(15 U.S.C. 632(g)(2)).
X (7) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (8) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2008) (E.O. 13126).
X (9) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
X (10) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
X (11) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212).
X (12) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).
X (13) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212).
X (14) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201).
X (15)(i)52.222-50, Combating Trafficking in Persons (Aug 2007)( Applies to all contracts)
X (16) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2006) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
X (17) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
X (18) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
X (1) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007) (41 U.S.C. 351, et seq.).
X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract. (2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved. (3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law. (e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vii) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause— (i) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (ii) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). (iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212). (iv) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793). (v) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004) (E.O. 13201). (vi) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007), flow down required for all subcontracts subject to the Service Contract Act of 1965 41 U.S.C. 351, et seq.). (vii) 52.222-50, Combating Trafficking in Persons (Aug 2007)(22 U.S.C. 7104(g)). Flow down required in accordance with Paragraph (f) of FAR clause 52.222-50. (viii) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007)(41 U.S.C. 351, et seq.). (ix) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (Nov 2007)(41 U.S.C. 351, et seq.). (x) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. (2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS
1.
PROJECT DESCRIPTION
a) Description of Work- This solicitation and any resultant contract is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 toreflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit theGovernment’s method of trading goods for services.
The purpose of the Last Chance Stewardship Project is to implement work items identified in the Last Chance Integrated Vegetation Management Project Environmental Analysis.
1. Mandatory work includes felling, yarding with tops and limbs attached to the landing, and piling of small trees (small trees 4.0” to 9.9” inches DBH) on 996 acres. This non-sawtimber material will be made subject to agreement for removal to a processing facility if so requested by the contractor, and be paid for at current contract rates. In addition, maintenance of roads and surface replacement costs will be mandatory.
2. Optional work includes felling, yarding with tops and limbs attached to the landing, and piling of small trees (small trees 4.0” to 9.9” inches DBH) on 255 acres. This non-sawtimber material will be made subject to agreement for removal to a processing facility if so requested by the contractor, and be paid for at current contract rates. Other optional work includes mechanical piling of ground fuels in two units totaling 257 acres, 7 miles of road decommissioning, 216 acres of thinning with skyline system (10.0” to 29.9” DBH) and hauling to the mill the merchantable sawlogs, drafting water source development, and hand piling of activity generated logging slash in Units 71B, 75B and 78B. If the skyline thinning work item is awarded, the sawtimber harvested from the units will become included timber and the contractor will be charged current contract rates for the material.
3. Boundaries of all units are designated on the ground with orange paint in the following manner:
a) Two orange dots at, or above, DBH face into the unit.
b) One orange dot at, or above, DBH on either side of the tree denote direction of boundary.
c) Yellow boundary tags may also be used.
4. All units are ITM (individual tree marked) and sawtimber sized trees (10.0” to 29.9” DBH) are marked with blue paint above and below stump.
5. Unless otherwise agreed, no tree over 30” DBH shall be cut.
b) Resulting Contract – Commercial thinning using a combination of ground-based mechanized felling equipment and hand-felling to thin 1318 acres. Yarding with tops and limbs attached will be required and all cut trees. Processing is to occur at the landing and the sawtimber will be hauled to the nearest mill. Tillage of landings and skid trails is required and erosion control devices will be installed after tree removal. The objective of the project is to reduce crown fire potential, improve species diversity, and improve forest health.
c) Project Location – Approximately 30 miles northeast of the town of Foresthill California. Legal location is:
1. Portions of Township 14N, Range 12E, Sections 13, 12, 3, 2, 1. Mount Diablo Base and Meridian (MDB&M).
2. Portions of Township 15N, Range 12E, Sections 34, 35, 36 (MDB&M). .
3. Portions of Township 14N, Range 13E, Sections 18, 8, 7, 6, 5 (MDB&M).
4. Portions of Township 15N, Range 13E, Sections 33, 32, 31, 30, 29, 28 (MDB&M).
2.
SPECIFICATIONS
Specifications for each Stewardship Activity individually described by an item number in Appendix B, specifications for timber removal and associated road plans and specifications can be found either in the Appendices or attached documents.
3.
CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
4.
ACCEPTANCE
The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.
5.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
Quality assurance plans specific to individual items will be found in Appendix A.
6. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Task Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work no later than 3 years or 1095 days after award. The time stated for completion shall include final cleanup of the premises.
Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal Specifications in the Appendices.
It is estimated that work will begin on 1 October 2010. Actual start date may be negotiable based on actual award, weather conditions, and anticipated workload.
(a) Restrictions on Work:
1) Scheduling of Work may be restricted based on the following:
Work may be performed at any time during the period of the contract, except as outlined in this part. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.212-12). Restrictions are as follows:
a. In accordance with the fire plan in the body of the IRSC.
b. When the Contracting Officer or designated representative determines that adverse weather has made access too dangerous or that continued vehicular use would cause unacceptable resource damage. This determination may be made when, among other possible circumstances, any of the following occur:
1. Soils: Allow operations only when soil moisture conditions are such that compaction, gulling, and/or rutting will be minimal. Equipment may operate on designated skid trails when soils are dry to a minimum of 4 inches. Low-ground pressure equipment may operate off designated skid trails when soils are dry to a depth of 4 inches. High-ground pressure equipment may operate off of designated skid trails when soils are dry to a minimum depth of 10 inches. Off of designated skid trails, limit all equipment passes over the same piece of ground to reduce the potential for adverse soil compaction. Utilize the TNF Wet Weather Operations Guidelines which supplement this contract and are to be used to determine if conditions are favorable for activities.
2. Forest roads used for access are being rutted to a depth of > 2" over more than 10% of the road (measured on a mile-by-mile basis).
3. There is the potential for sediment flow into any drainage from a facility used by the Contractor, including roads, landings, or skid trails.
4. Forest Service personnel cannot safely inspect any operation under this contract.
c. Contractor shall stop all operations in the immediate vicinity of any large bird nests found within the project area and shall notify the Forest Service immediately. Operations in the vicinity of these nests may be delayed or deleted based on a biological evaluation.
d. The following are work restrictions by Unit;
1. In Units 66, 66B, 67, 69, 70, 71, 71B, 78B, harvest and stewardship operations shall not occur in calendar year 2010.
2. On approximately 7 acres in Unit 79, harvest and stewardship operations shall not occur from March 1 to August 15 to minimize disturbance to California spotted owls. A map will be provided of restricted area to the sucessful contractor.
3. Recreation Events work restrictions:
a. In Units 66, 66B, 71, 71B, 78, 78B, 75, and 75B, no operations shall occur during the following events and times except for hand piling.
At the time this contract was written, the dates have not been determined. Dates and times of the work restrictions will be determined at a later date:
b. Weekend of the Western States Endurance Run
c. Weekend of the Western States Endurance Ride
d. Memorial Day Weekend
Schedule of Operations:
Unless otherwise agreed in writing, Contractor’s Operations shall be performed in accordance with the following schedule:
| Work Item/AreaArea/Unit |
| Conditions of Operation |
| Work items 1-8 inclusive |
| At least 60% of the total acres of these work items including Unit 75 must be completed and accepted by Forest Service before October 15, 2011. |
| Work items 1-8 inclusive |
| The remaining acres of the work items must be completed and accepted by Forest Service before October 15, 2012. |
| Optional work items 11, 12 |
| If awarded, these work items must be completed and accepted by the Forest Service before October 15, 2012. |
| Contract Area |
| All Included Products felled in the woods or decked at landings must be removed within 30 days of cutting from June 1 - September 30 inclusive. |
7.
AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)
The period of performance of this contract is from date of contract award through September 17, 2013. All work shall be completed by September 17, 2013.
8.
SCHEDULES AND REPORTS
Pursuant to contract requirements, the following submittals are required within 10 days after issuance of a Notice to Proceed or Task Order for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:
| ITEM DESCRIPTION |
| COPIES REQUIRED |
| Proposed progress schedule showing starting and completion dates of various phases of the work |
| 2 |
| List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officers Written approval prior to starting work on the project. Submit on Standard Form 1413. |
| 2 |
| Traffic Control Plan, in accordance with Section 104 |
| 2 |
| Soil Erosion and Water Pollution Control Plan, in accordance with Section 204 |
| 2 |
| Designation of Contractor personnel describing responsibilities and authorities |
| 2 |
All schedules and reports shall be submitted to: CO, COR.
9.
PAYMENT
It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.232-1 – Payments. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber value during the contract period. The value of work completed and timber removed will be documented in an Integrated Resource Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.
10.
STEWARDSHIP CREDITS
Stewardship Credits are credits that are earned and established when work listed in the Appendix B Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.
11.
ESTABLISHMENT OF STEWARDSHIP CREDITS
Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for Stewardship Activities will be made with Stewardship Credits as indicated in the award document.
Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.
Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber value during the contract period. If payment is to be made to the contractor for work performed, it will be made in accordance with FAR 52.232-1—Payments.
12.
CONTRACTOR CERTIFICATION
Monthly, as Stewardship Credits are established, the Contractor shall furnish the following certification (Contractor Certification - Earned Stewardship Credits) or credit will not be received.
CONTRACTOR CERTIFICATION - EARNED STEWARDSHIP CREDITS
LAST CHANCE STEWARDSHIP PROJECT
I hereby certify, to the best of my knowledge and belief, that--
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name)
(Title)
(Date) 13.
TIMBER PAYMENT GUARANTEE
(1) General—(a) To guarantee payment for timber scheduled for removal under the IRSC, Contractor may earn Stewardship Credits in advance of removal, or provide a Timber Payment Guarantee in the form of an acceptable surety payment bond, cash payment, or a deposit in a Federal Depository negotiable securities of the United States.
(b) Any earned Stewardship Credits and alternate Timber Payment Guarantee together will maintain a minimum unobligated balance equal to the applicable charges for timber the Forest Service estimates will be cut in 30 to 60 calendar days plus the value of any outstanding charges, or equal to the total value of the timber that has not been paid for. If at any time, the value of unobligated earned Stewardship Credits plus the amount of Timber Payment Guarantee is not sufficient to cover any outstanding charges for timber hauled plus the value of timber to be cut in the next 10 calendar days, the Contracting Officer shall suspend the cutting and/or hauling of timber until such time as more Stewardship Credits are established, or acceptable Timber Payment Guarantee is received.
(c) Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.
(2) A Timber Payment Guarantee for a single contract shall be provided utilizing FS Form 6500-12.
(3) Blanket Surety Bond—(a) Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for timber from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for payment guarantee.
(b) The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor will provide the contact information for the Forest Service representative administering the Blanket Surety Bond.
(c) When there is to be no timber cutting hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract shall be reallocated to other contracts at Contractor’s request.
(d) A Timber Payment Guarantee for multiple contracts (Blanket Guarantee) shall be provided utilizing FS Form 6500-12a.
(3) Letters of Credit for Payment Bond—Contractor may use letters of credit in lieu of a surety bond for payment bond purposes when approved by Contracting Officer.
14.
EXCESS STEWARDSHIP CREDITS
In the event there are excess (unused) established Stewardship Credits when all of the included timber has been cut and removed the Forest Service, at its option, shall either add more timber or make cash payment for the unused credits.
15.
EXCESS TIMBER VALUE
In the event the value of the included timber exceeds the total value of all of the mandatory activities plus the ordered elective activities, the Contractor shall make cash payment for the excess timber value.
16.
REFUND OF EXCESS CASH
If at any time the credit balance of the Integrated Resource Statement of Account exceeds the charges for timber removed to date and for timber that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “TIMBER PAYMENT GUARANTEE” before additional timber may be cut.
17.
FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
18.
AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award or before work starts. The conference will be held the Tahoe National Forest Supervisor’s Office, Nevada City, California, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.
19.
FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) - The indications of physical conditions on the drawings and in the specifications are the result of site investigations and by visual observation.
(b) - Additional informational material can be made available to contractors upon their request including but not limited to: environmental documentation, timber cruise data, timber removal report and appraisal, maps, access permits, etc.
The Forest Service has determined the estimated quantities of Included Timber in accordance with the volume equations or tables approved for use in the area by the Forest Service with adjustment for defect as appropriate. Copies of the cruise report are on file at the American River Ranger District, Foresthill, California. The Forest Service makes no representation, warranty, or guarantee of the accuracy of the estimate.
20.
AGAR 452.236-72 USE OF PREMISES (NOV 1996)
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall:
1) provide and maintain sanitation facilities for the work force at the site and,
2) dispose of solid waste in accordance with applicable Federal, State and local regulations.
(c) All camps and campsites must be pre-approved in writing by District Archaeologist prior to occupancy.
21.
AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
(1) Overall Project Manager
(a) Logging Supervisor
(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
22.
FSAR 4G52.222-701 EMPLOYMENT OF ELIGIBLE WORKERS (DEC 1999)
Section 274A of the Immigration and Nationality Act (8 USC 1324a) makes it unlawful for an employer to hire unauthorized aliens. The Immigration and Naturalization Service (INS) has established the Form I-9, Employment Eligibility Verification Form, as the document to be used for employment eligibility verification (see 8 CFR 274a).
The contractor is required to (1) have all employees complete and sign the I-9 Form to certify that they are eligible for employment; (2) examine documents presented by the employee and ensure the documents appear to be genuine and related to the individual; (3) record information about the documents on the form, and complete the certification portion of the form; (4) retain the form for three years, or one year past the end of employment of the individual, whichever is longer.
It is illegal to discriminate against any individual (other than a citizen of another country who is not authorized to work in the United States) in hiring, discharging, or recruiting because of that individual's national origin or citizenship status.
Compliance with Section 274A of the Immigration and Nationality Act (8 U.S.C. 1324a) is a material condition of the contract. If the contractor employs unauthorized workers during contract performance in violation of section 274A, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
For further information on the requirements of the Act, contractors should contact the Employer and Labor Relations Officer of their local INS office.
23.
FSAR 4G52.222-702 LABOR STANDARDS FOR CONTRACTS INVOLVING MIGRANT AND SEASONAL AGRICULTURAL WORKERS (DEC 1999) (a) General. This contract is subject to the Migrant and Seasonal Agricultural Workers Protection Act (MSPA) (29 U.S.C 1801-1872) and to Department of Labor regulations implementing MSPA (see 29 CFR 500). The purpose of MSPA is to eliminate activities that are detrimental to migrant and seasonal agricultural workers, to require registration of farm labor contractors, and to assure necessary protections for the workers. In addition to traditional farm labor activities, the Act applies to predominately manual forestry work including, but not limited to, tree planting, release, precommercial thinning, and site preparation and wildland fire fighting.
(b) Definitions.
"Migrant Agricultural Worker" and "Seasonal Agricultural Worker", as used in this clause, mean individuals employed in agricultural (including forestry) work on a seasonal or temporary basis. A worker who moves from one seasonal activity to another is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year. Migrant workers are required to be absent overnight from their permanent place of residence. Seasonal workers are not required to be absent overnight from their permanent place of residence. Members of the contractor's immediate family are not considered to be either migrant or seasonal workers. "Immediate family" includes only (1) spouse; (2) children, stepchildren, or foster children; (3) parents, stepparents, or foster parents; and (4) brothers and sisters.
"Farm Labor Contractor", as used in this clause, means an individual who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or seasonal agricultural worker.
(c) Registration Requirement. Any contractor who provides or hires migrant or seasonal workers to perform agricultural or manual forestry work shall first obtain a Certificate of Registration from the Department of Labor or an authorized State agency. The contractor shall carry the Certificate at all times while engaged in contract performance, and shall display it upon request. Any of the contractor's employees who also perform any one or more of the activities defined for a "Farm Labor Contractor" in paragraph (b) must have their own Farm Labor Contractor Employee Certificate.
(d) Worker Protections. The contractor shall comply with the following protections and standards related to wage disclosure, recordkeeping, vehicle safety, and housing:
(1) The contractor shall display and maintain at the place of employment the MSPA poster provided by the Department of Labor.
(2) Wage and Payroll Standards
(i) The contractor shall disclose in writing to each worker in a language common to the worker the full terms of their employment, including workers compensation information, at the time they are recruited or hired. The Department of Labor provides an optional form WH-516 for contractor's use in disclosure.
(ii) The contractor must keep the following payroll records for each employee: name, address, social security number, basis for wages (i.e. per hour, per tree, per acre), number of units earned if paid on a per unit basis, hours worked, total pay, withholdings and purpose for each, and net pay. Payroll records shall be retained for three years.
(iii) Payments must be made no less frequently than every two weeks or semi-monthly. At the time of each payment, the contractor shall provide to the employee a written itemization of the information listed above and which shall include the employer's tax identification number.
(iv) If paid on a piece rate basis, the employee's wage must be at least equivalent to the required hourly wage for the hours worked, including overtime differential for time in excess of 40 hours per week.
(3) Motor Vehicle Safety
(i) The contractor must be registered to transport employees, unless employees provide their own transportation or carpool by their own arrangement in one of their own vehicles.
The authorization to transport employees must appear on the contractor's certificate. If the contractor directs or requests employees to carpool, the registration requirement is still applicable. Any driver who transports workers for a fee or at the direction of the contractor must be registered as a farm labor contractor or a farm labor contractor employee.
(ii) Any vehicle under the ownership or control of the contractor shall comply with safety standards applicable to that vehicle. Generally passenger vehicles or station wagons must comply with Department of Labor regulations at 29 CFR 500.104. Vehicles other than passenger vehicles or station wagons which are driven more than 75 miles must comply with Department of Transportation Regulations at 29 CFR 500.105. All drivers must have a current, valid State driver’s license.
(iii) Each vehicle under the ownership or control of the contractor which is used to transport any migrant or seasonal agricultural worker shall be covered by vehicle insurance of $100,000 per seat (maximum $5,000,000). A workers compensation policy which covers the workers while being transported plus an additional property damage policy for $50,000 for loss or damage in any one accident to the property of others may be substituted for the vehicle insurance requirement.
(4) Housing
(i) The contractor shall house workers only in a commercial establishment or a facility that has been certified by a health authority or other appropriate agency. The contractor must post the certificate of occupancy at the housing site.
(ii) The authorization to furnish housing, other than commercial lodging, must appear on the contractor's certificate.
(iii) If the contractor is not furnishing worker housing:
Workers on this contract may obtain housing only in a residential accommodation, including a commercial establishment such as a hotel or motel, which meets all applicable state and federal standards for employee housing.
Within 10 days after award, and prior to the issuance of Notice to Proceed, the contractor must notify the Contracting Officer of the planned worker housing site.
If the housing site is located on a National Forest, the Contractor must obtain a permit from the District Ranger for the District on which the housing site is located and the facilities established for the workers must meet the applicable U.S. Department of Labor (USDOL) MSPA standards for such sites.
If the housing site is not located on a National Forest, the site must meet the applicable housing standards in MSPA.
If an exemption from the permit requirement is claimed, the contractor must provide a written statement identifying the law authorizing the exemption, stating the facts constituting an exemption under that law, and identifying a USDOL employee or official who stated or concurred that the accommodations were exempt, citing name, date, and means of communication.
If the housing site is changed after approval by the Contracting Officer, the contractor must provide a new Permit or exemption statement. The above requirements are material conditions of this contract.
If the contractor fails to comply, the Government may terminate the contract. In addition, other remedies or penalties prescribed by law may apply
Field Sanitation
In accordance with US Department of Labor Fact Sheet No. ESA 97-28 “Field Sanitation Standards” (Ref. 29CFR 1928.110), employers must provide:
· Potable drinking water, suitably cool and in sufficient amounts, dispensed in single-use cups or by fountains, located so as to be readily accessible to employees.
· Facilities maintained in accordance with public health sanitation practices include upkeep of water quality through daily change or more often if necessary.
· Notification to each employee of the location of the water and allowance of reasonable opportunities during the workday to use them. The employer also must inform the employee of the relevant health hazards in the field and the practices necessary to minimize them.
Employees cannot be made to bear the costs incurred by the employer for providing required facilities.
(e) For further information on the requirements of the Act, contractors should contact their local Wage and Hour Division of the Department of Labor.
24.
FSAR 4G52.222-703 MIGRANT AND SEASONAL AGRICULTURAL WORKER PROTECTION ACT REGISTRATION (DEC 1999) The Migrant and Seasonal Agricultural Worker Protection Act (MSPA) (29 U.S.C. 1801-1872) and implementing regulations issued by the Department of Labor (29 CFR 500), require any employer who hires or anticipates hiring employees subject to MSPA to obtain an MSPA registration number.
If the contractor employs or anticipates hiring employees subject to MSPA, the contractor shall provide a valid U.S. Department of Labor MSPA Registration Number to the Contracting Officer within 10 days after notification of award of the contract.
The Government may demand that the contractor display MSPA registration at any time during contract performance if it appears that the contractor is employing workers subject to MSPA. On demand, the contractor shall display its MSPA registration or state why it is exempt from MSPA.
Compliance with MSPA is a material condition of the contract. If the contractor fails to provide a valid MSPA number in accordance with this clause, or falsely states that it is exempt from the MSPA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
25.
PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES, AND CAVE RESOURCES
Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are identified on the ground and on a map given to successful bidder at the pre-work/pre-ops meeting.
Special requirements for Heritage Sites within the contract area:
Management Requirements of cultural resources includes all activities associated with the Last Chance Stewardship Project. Sites will be designated by a Heritage Resource Specialist on the ground prior to implementation of project activities. It is required to protect cultural resources that have been identified with flagging, as well as those identified on maps provided by the Heritage Resources staff prior to operations.
The Contracting Officer and/or the COR, and the District Archaeologist will walk all sites with the purchaser prior to start of operations.
Proposed logging camps and other staging areas need to be approved by a Heritage Resource Specialist prior to use.
Management of Linear Features: Directionally fell sawlog trees and small trees parallel to or away from linear features (ditches etc.). On a case by case basis it may be necessary to breach Linear Features to accomplish timber harvest. Existing breaches will be utilized whenever possible. In other cases linear features will be filled or covered with cull logs and/or slash for a temporary crossing. New breaches to linear features will be identified by the Heritage Resource Specialist and should be at a minimum of 150 feet apart. The new breaches must be rehabilitated to their original form after harvest activities are complete. Any material placed in the ditch must be removed after harvest activities are complete.
During skyline logging operations, full suspension should be utilized over linear features. If full suspension is not possible then woody material will be placed in such a way to protect the resource, and removed after logging operations have ceased.
The Trap Line Ditch is a recorded archaeological site; as such no new breaches will be permitted. If necessary cull logs and slash may be used to protect and maintain the form of the ditch. Trees may then be skidded over the location and the materials used for crossing will subsequently be removed. These locations will be designated by the District Archaeologist.
In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations. Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.
Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of required cross ditching.
Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .